Loading...
HomeMy WebLinkAbout4._TrafficImpactSummary_08162021P A R K V I E W C R O S S I N G M A J O R S U B D I V I S I O N P R E L I M I N A R Y P L A T A P P L I C A T I O N A U G U S T 2 0 2 1 T R A F F I C I M P A C T S U M M A R Y 1 TRAFFIC IMPACT SUMMARY This traffic impact summary provides an overview for the proposed Park View Crossing Major Subdivision, located in the City of Bozeman, Gallatin County, Montana. This information presented is intended to evaluate the safety of the surrounding area and existing infrastructure with the addition of the proposed development. The proposed Park View Crossing Major Subdivision is located in at the intersection of Tschache Lane and Vaquero Parkway on the existing Lot 4 of Minor Subdivision 400, generally located within the Northeast ¼ of Section 3, Township 2 South, Range 5 East, P.M.M., Gallatin County, Montana. The forty-four (44) residential lots within the development are estimated to generate approximately 488 average weekday trips with 36 weekday AM peak hour (9 entering, 27 exiting) and 46 PM peak hour trips (29 entering, 17 exiting). Access to the development would be via the newly constructed “loop” road: a continuation of Tschache Lane to the Regional Park boundary, then looping north to an additional existing intersection with Vaquero Parkway. This traffic can then head north or south on Vaquero Parkway, or take Tschache Lane east to Davis Lane. It is not anticipated that the development will have significant impacts beyond the existing primary access points, therefore no upgrades are proposed at this time for any nearby intersections, and the new intersections with Vaquero Parkway have already been permitted through the City of Bozeman.