HomeMy WebLinkAbout0_TableOfContents_04162021P A R K V I E W S U B D I V I S I O N
P R E L I M I N A R Y P L A T A P P L I C A T I O N
A P R I L 2 0 2 1
TABLE OF CONTENTS
EXECUTIVE SUMMARY
SECTION 1: APPLICATION MATERIALS, NARRATIVE & SUPPORTING DOCUMENTATION
a. Development Review Application (Form A1)
b. Preliminary Plat Application/Checklist form & fee sheet
c. Noticing Requirements (Form N1) & Adjoiner List
d. Project Narrative
- Project type, proposed use scope, type of buildings, and intent
- Response to the City’s Pre-app comments
- Items from BMC 38.220.060
e. Request for Exemption from DEQ Review (MFE Form)
SECTION 2: MAPS & PRELIMINARY PLAT
f. Vicinity & USGS Quad Map
g. 11x17 copy of Preliminary Plat (24x36 located in back cover of this application)
SECTION 3: WEED MANAGEMENT PLAN
SECTION 4: ENGINEERING REPORT – WATER, SEWER, STORM
h. NRCS Soil Report
i. Geotechnical Report (July 31, 2006)
SECTION 5: ENGINEERING PLANS FOR INFRASTRUCTURE IMPROVEMENTS
j. Fire Protection Plan
SECTION 6: LIGHTING PLAN
SECTION 7: LANDSCAPING PLANS
SECTION 8: HOA/OWNER DOCUMENTS
k. Draft Covenants
l. Articles of Incorporation
m. Certificate of Construction
n. Cash in Lieu of Water Rights
o. Cash-in-lieu of Parkland Dedication
p. Abstract of Title