Loading...
HomeMy WebLinkAbout0_ParkTrailNarrative_09242021 2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781 Professional Consulting Engineers and Land Surveyors Equal Opportunity Employer | www.hyaliteeng.com September 24, 2021 City of Bozeman- Community Development Department PO Box 1230 Bozeman, MT 59771 Attn: Susana Montana - Senior Planner RE: Park View Crossing Parcel Development – Subdivision Preliminary Plat Submittal Parkland & Trail Connectivity Dear Susana: The purpose of this narrative is to provide you with additional information describing the proposed pedestrian trail network and trail connectivity for the above referenced project. Per conversations with the City of Bozeman Parks and Recreation Department a 10-foot wide shared use pathway will be located within Vaquero Parkway right of way, just east of the platted subdivision area, and extend from the property’s northern boundary to the southern boundary. This has been discussed as the ideal location for a shared use pathway providing connectivity and access to the Regional Park. As the coordination is ongoing with the Parks and Recreation Department, the trail surfacing and exact extents of trail improvements have yet to be finalized. The trail will ultimately be installed from Baxter Lane to Davis Lane, and an agreement is in the works with the Parks Department to balance cash-in-lieu for parkland requirements with the trail improvements needed. The trail corridor improvements within the project scope will include the shared use pathway mentioned above, as well as potential improvements to the existing trail within the Regional Park, just west of the platted subdivision area. An internal city standard sidewalk is not proposed on the western side of Stokes Lane, as the existing park trail is already near this location. Keeping the existing trail and not installing city sidewalk will limit redundancy of pedestrian pathways while also providing the necessary connectivity for the development. The northernmost and southernmost sections of E-W sidewalk within the subdivision will provide access to the park trail and will not be continued further. I hope that the enclosed information allows you to approve this project. If for any reason you have any questions, or need any additional information during the review of this project, please feel free to give me a call at 587-2781 or send an email to bmegaard@hyaliteeng.com. Sincerely, ______________________________ Brett Megaard, PE Project Manager Cc: File: 193211 Owner