Loading...
HomeMy WebLinkAbout8.6 IA-Improvements Agreement - Open Space Landscaping_12-14-2020 MT Community Development IA IMPROVEMENTS AGREEMENT APPLICATION 1. PROJECT Development Name: Bridger Vale PUD Subdivision Planning File Number: 2. PROPERTY OWNER Name: Ebbighausen Homes, Inc. Full Address: P.O. BOX 930, Manhatten, MT 59741 Phone: (406) 284-6862 Email: andy@ebbighausen.com 3.APPLICANT Name: Same as Owner Full Address: Phone: Email: 4. REPRESENTATIVE Name: C&H Engineering and Surveying, Inc. Full Address: 1091 Stoneridge Drive, Bozeman, Montana 59718 Phone: (406) 587-1115 Email: Istein@chengineers.com S. PROPERTY Full Street Address: S. of Gallatin Park Dr, E. of Manley Road, N. of Turtle Way Full Legal Description: Lot R1, Block 5, Westbrook Subdivision, Phase 4 Current Zoning: REM and PLI 6. IMPROVEMENTS TO BE GUARANTEED Attach a detailed estimate of remaining improvements proposed to be guaranteed. The estimate for any improvements to be dedicated to the public such as streets and water sewer street frontage landscaping, park improvements shall be prepared by an appropriate professional such as a civil engineer or landscape architect as applicable. Type(s) of improvements proposed for guarantee: Open Space Landscaping Improvements Agreement Application IA Page 1 of 3 Revision Date 1-27-20 Required Forms: I IA and Estimate Recommended Forms: I Required Forms: Anticipated date of installation: Spring Summer 2021 Name, company and title of individual who will be signing the improvements agreement and guaranteeing installation of improvements: Ebbighausen Homes, Inc. - Andy Ebbighausen Remaining Improvements $ 9,394 Estimate Amount: Financial Guarantee Amount $ 14,091 (1.5 X Estimate) An acceptable financial guarantee is required following approval of the financial guarantee amount. This guarantee shall be submitted along with an executed improvements agreement that you will receive from staff following approval of this application. The City accepts Cash, Letters of Credit from local banks or out of area banks where funds can be drawn by certified mail. Bonds may be accepted, but must be approved by the City Attorney and in a form provided by the City. Contact us if you plan to use a bond as your financial guarantee. 8. APPLICATION FEES AND MATERIALS $14,091 x %1=$140.91 ❑� Base fee $525 or 1% of face value of guarantee, whichever is greater. 9. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal will be accepted. Statement of Intent to Complete Improvements - I understand that the Improvements Agreement must be secured by a financial guarantee, as may be deemed acceptable by the City, payable to the City of Bozeman, in an amount equal to one and one-half times the estimated cost of the installation of any required i provements not completed at that time. Said method of security shall be valid for a period of not less than tw 12) months, eighteen (18) months for subdivision improvements. In any event, all required improvements a'I e completed within nine (9) months of occupancy for site development and twe (12) months for iv' ion improvements except for lot frontage sidewalks in order to avoid def on the method sec ty. Applicant Signature: Printed Name: i Owner Signature: Printed Name: Z_Z�/�' c Owner Signature Printed Name: If signing as a corporation, please provide the title and position of the individual signing on behalf of the corporation. Attach separate sheets for additional owner signatures. 10. CERTIFICATIONS FOR INSTALLED IMPROVEMENTS AND IMPROVEMENTS AGREEMENT REVIEW Improvements Agreement Application IA Page 2 of 3 1 Revision Date 1-27-20 Required Forms: IA and Estimate Recommended Forms: Required Forms: Following submittal, this application is reviewed by City staff to determine if the proposed improvements to be guaranteed are appropriate in relation to the improvements installed to date and that the improvements to be guaranteed have been estimated based upon current area construction/installation costs. For all improvements installed to date, the property owner and applicant are required to provide certifications from their appropriate project professionals (architect, civil engineer, landscape professional, lighting engineer, etc.) that the private and public improvements have been installed according to the improved plans and specifications. If these certifications are not provided, it may delay the review of this application.These certifications can be provided on dated letterhead by each professional. Contact us for more information if you are unfamiliar with this process. CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263 PO Box 1230 planning@bozeman.net Bozeman, MT 59771 www.bozeman.net Improvements Agreement Application IA Page 3 of 3 Revision Date 1-27-20 Required Forms: I IA and Estimate Recommended Forms: I Required Forms: