Community Development IA
IMPROVEMENTS AGREEMENT APPLICATION
1. PROJECT
Development Name: Bridger Vale PUD Subdivision
Planning File Number:
2. PROPERTY OWNER
Name: Ebbighausen Homes, Inc.
Full Address: P.O. Box 930, Manhatten, MT 59741
Phone: (406) 284-6862
Email: andy@ebbighausen.com
3.APPLICANT
Name: Same as Owner
Full Address:
Phone:
Email:
4. REPRESENTATIVE
Name: C&H Engineering and Surveying, Inc.
Full Address: 1091 Stoneridge Drive, Bozeman, Montana 59718
Phone: (406) 587-1115
Email: Istein@chengineers.com
5. PROPERTY
Full Street Address: S. of Gallatin Park Dr, E. of Manley Road, N. of Turtle Way
Full Legal Description: Lot R1, Block 5, Westbrook Subdivision, Phase 4
Current Zoning: REMU and PLI
6. IMPROVEMENTS TO BE GUARANTEED
Attach a detailed estimate of remaining improvements proposed to be guaranteed. The estimate for any
improvements to be dedicated to the public such as streets and water sewer street frontage landscaping, park
improvements shall be prepared by an appropriate professional such as a civil engineer or landscape architect as
applicable.
Type(s) of improvements
proposed for guarantee: Park Sod and Trail Connection (Landscaping)
Improvements Agreement Application IA Page 1 of 3 Revision Date 1-27-20
Required Forms: I IA and Estimate Recommended Forms: I Required Forms:
Anticipated date of installation: Spring Summer 2021
Name, company and title of
individual who will be signing
the improvements agreement
and guaranteeing installation of
improvements: Ebbighausen Homes, Inc. - Andy Ebbighausen
Remaining Improvements $ 12,800
Estimate Amount:
Financial Guarantee Amount $ 19,200
(1.5 X Estimate)
An acceptable financial guarantee is required following approval of the financial guarantee amount. This guarantee shall be
submitted along with an executed improvements agreement that you will receive from staff following approval of this
application. The City accepts Cash, Letters of Credit from local banks or out of area banks where funds can be drawn by
certified mail. Bonds may be accepted,but must be approved by the City Attorney and in a form provided by the City.
Contact us if you plan to use a bond as your financial guarantee.
8.APPLICATION FEES AND MATERIALS
❑ Base fee $19,200 x %1=$192
$525 or 1% of face value of guarantee, whichever is greater.
9. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal
will be accepted.
Statement of Intent to Complete Improvements - I understand that the Improvements Agreement must be secured
by a financial guarantee, as may be deemed acceptable by the City, payable to the City of Bozeman, in an amount equal
to one and one-half times the estimated cost of the installation of any required improvements not completed at that
time. Said method of security shall be valid for a period of no .ess than twelve (12) months, eighteen (18) months for
subdivision improvements. In any event, all required imp ovements hall be completed within nine (9) months
of occupancy for site development and twelve (12) nths for su ivision improvements except for lot
frontage sidewalks in order to avoid default on method of curity.
Applicant Signature:
Printed Name: mf
1
Owner
Signature:
Printed Name: r
Owner
Signature
Printed Name:
If signing as a corporation, please provide the title and position of the individual signing on behalf of the corporation.
Attach separate sheets for additional owner signatures.
10. CERTIFICATIONS FOR INSTALLED IMPROVEMENTS AND IMPROVEMENTS AGREEMENT REVIEW
Improvements Agreement Application IA Page 2 of 3 1 Revision Date 1-27-20
Required Forms: I IA and Estimate Recommended Forms: Required Forms:
Following submittal, this application is reviewed by City staff to determine if the proposed improvements to be guaranteed
are appropriate in relation to the improvements installed to date and that the improvements to be guaranteed have been
estimated based upon current area construction/installation costs.
For all improvements installed to date, the property owner and applicant are required to provide certifications from their
appropriate project professionals (architect, civil engineer, landscape professional, lighting engineer, etc.) that the private
and public improvements have been installed according to the improved plans and specifications. If these certifications are
not provided, it may delay the review of this application.These certifications can be provided on dated letterhead by each
professional. Contact us for more information if you are unfamiliar with this process.
CONTACT US
Alfred M. Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Improvements Agreement Application IA Page 3 of 3 Revision Date 1-27-20
Required Forms: I IA and Estimate Recommended Forms: I Required Forms: