INTRODUCTION
The Bridger Vale Planned Unit Development (PUD) project is being proposed to annex and rezone
to Residential Mixed Use (REMU) Tract GLR-1, COS No. 1221, which is located east of Manley
Road at the East Gallatin Recreational Area (EGRA) access road. The project is planned to be
developed as a residential subdivision PUD. This design report addresses stormwater
management at the site based on the development plan being proposed.
STORMWATER DETENTION PONDS
The site runoff for Bridger Vale Subdivision PUD will be routed to Detention Pond 4 which is
proposed south of Bridger Vale Drive on the west side of the site. The site is divided into two
drainage areas as shown on the attached drainage area map included in Appendix A at the end of
this report. Both drainage areas are routed to Detention Pond 4 through a series of ponds and
overflow structures. There are 3 intermediate detention ponds (Detention Pond 1, Detention Pond
2 and Detention Pond 3) located in the center median strip of Bridger Vale Drive. The
western-most Detention Pond 1 has a storage capacity of 1,610 cf, Detention Pond 2 has a storage
capacity of 620 cf, and Detention Pond 3 has a storage capacity of 900 cf.
Drainage Area 1 includes the majority of the alley along the rear of the residential lots which will
be graded with an inverted crown cross section that will collect runoff from the rear of the lots, all
of the buildings, the driveways and the commercial lot. The runoff collected by the alley will be
routed to the west intersection of the Alley and Bridger Vale Drive and will drain into Detention
Pond 1 through a curb cut in the western most median at the lowest grade point. Storm water then
is routed through an outlet control structure to Detention Pond 4. The proposed outlet control
structure in Detention Pond 1 is meant to hydraulically connect Detention Pond 1 and Detention
Pond 4, as such it will not have a weir. Once in Detention Pond 4 another outlet control structure
will transmit the runoff through the wetlands to the ditch along the east side of Manley Road.
2 | P A G E
Drainage Area 2 consists of the landscaped front yards of four of the buildings, a portion of the
Alley, open space, and the east end of Bridger Vale Drive. Catch curb along the center median will
collect this drainage and route it to the appropriate median through four curb cuts. Drainage Area 2
will drain to Detention Ponds 2 & 3. During a storm event runoff held in Detention Pond 3 will be
routed to Detention Pond 2 through a proposed culvert underneath the pedestrian crossing in the
median of Bridger Vale Drive. The required detention volume for Drainage Area 2 is 700 cf;
Detention Ponds 2 & 3 provide 1,520 cf of storage capacity. As an additional treatment measure,
the runoff in Detention Pond 2 will be held and routed through an outlet control structure to
Detention Pond 4, then another outlet control structure to the ditch along the east side of Manley
Road. The outlet structure in Detention Pond 2 will have a 1.5’ headwall and a slot width of 0.4”.
Due to the fact that Detention Pond 4 is detaining runoff for both Drainage Areas 1 & 2, sizing
calculations for Pond 4 are provided for the entire site. Drainage Areas 1 & 2 have a combined
required detention volume of 4,786 cf considering the 10-year 2-hour storm event. Detention Pond
4 has been sized to detain runoff from Drainage Areas 1 and 2, as such Detention Pond 4 has a
volume of 5,238 cf. The outlet structure on Detention Pond 4 will have a 1.8” weir which will
allow the pond to drain to the existing ditch at the predevelopment runoff rate of 0.93 cfs. As stated
in the previous paragraphs Detention Ponds 1 & 2 will each have a drop detention pond outlet
structure which will flow to Detention Pond 4. Detention Pond 4 will then outlet to the existing
ditch located along the east side of Manley Road. There is a 30” corrugated metal culvert that
currently runs under future Bridger Vale Drive and this culvert will be replaced by a 22” by 36”
RCP arch culvert. For a full breakdown of the calculations used in sizing the detention pond
please refer to the attached drainage spreadsheets found at the end of the report.
3 | P A G E
APPENDIX A
DRAINAGE AREA MAP
4 | P A G E
APPENDIX B
SUPPORTING CALCULATIONS
DRAINAGE AREA 2
DETENTION PONDS 2 & 3
1. Calculate Area and Weighted C Factor (Post-Development)
Contributing Area C Area (ft2 )C * Area
Hardscape 0.95 17983 17084
Commercial 0.8 0 0
Landscape 0.2 41244 8249
Total 59227 25332
A = Area (acres) 1.36 Storm
C = Weighted C Factor 0.43 Return (yrs)Cf
2 to 10 1
2. Calculate T c (Pre-Development)11 to 25 1.1
Tc Overland Flow 26 to 50 1.2
Tc = 1.87 (1.1-CCf)D1/2/S1/3 51 to 100 1.25
S = Slope of Basin (%) 0.8
C = Rational Method Runoff Coefficient 0.2
Cf = Frequency Adjustment Factor 1.1
D = Length of Basin (ft) 800
Tc (Pre-Development) (minutes) 50
3. Calculate Rainfall Intensity (Duration = Pre-Development Tc)
i = 0.64x-0.65 (10-yr Storm, Fig. I-3, COB Design Standards)
x = storm duration (hrs) 0.84 (Tc Pre-Development)
i = rainfall intensity (in./hr.) 0.72
4. Calculate Runoff Rate (Pre-Development)
Q = CiA
C = Rational Method Runoff Coefficient 0.2 (open land)
i = rainfall intensity (in./hr.) 0.72 (calculated above)
A = Area (acres) 1.36 (calculated above)
Q = Runoff Rate (Pre-Development) (cfs) 0.20
5. Calculate Required Pond Volume
Total Area (acres) =1.36 acres
Weighted C =0.43
Discharge Rate (cfs) =0.20 cfs (Equal to Pre-Development Runoff Rate)
Duration(min)Duration(h
rs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage
(ft3)
28 0.47 1.05 0.61 1026 329 698
29 0.48 1.03 0.60 1039 340 699
30 0.50 1.00 0.58 1051 352 699
31 0.52 0.98 0.57 1063 364 700
32 0.53 0.96 0.56 1075 376 700
33 0.55 0.94 0.55 1087 387 700
34 0.57 0.93 0.54 1098 399 699
35 0.58 0.91 0.53 1110 411 699
36 0.60 0.89 0.52 1121 422 698
37 0.62 0.88 0.51 1131 434 697
PROVIDED VOLUME (ft3)1,520
OUTLET STRUCTURE SLOT - DETENTION POND 2
Q=CLH3/2
Q = Discharge (cfs)0.20
C = Weir Coefficient 3.33 (per COB Design Standards)
H = Head (ft)1.5
L = Horizontal Length (ft) 0.03
L = Slot Width (inches) 0.4
DETENTION POND 4
DRAINAGE AREA 1 & 2
1. Calculate Area and Weighted C Factor (Post-Development)
Contributing Area C Area (ft2 )C * Area
Hardscape 0.95 109475 104002
Commercial 0.8 23540 18832
Landscape 0.2 149666 29933
Total 282681 152767
A = Area (acres) 6.49 Storm
C = Weighted C Factor 0.54 Return (yrs)Cf
2 to 10 1
2. Calculate T c (Pre-Development)11 to 25 1.1
Tc Overland Flow 26 to 50 1.2
Tc = 1.87 (1.1-CCf)D1/2/S1/3 51 to 100 1.25
S = Slope of Basin (%) 0.8
C = Rational Method Runoff Coefficient 0.2
Cf = Frequency Adjustment Factor 1.1
D = Length of Basin (ft) 800
Tc (Pre-Development) (minutes) 50
3. Calculate Rainfall Intensity (Duration = Pre-Development Tc)
i = 0.64x-0.65 (10-yr Storm, Fig. I-3, COB Design Standards)
x = storm duration (hrs) 0.84 (Tc Pre-Development)
i = rainfall intensity (in./hr.) 0.72
4. Calculate Runoff Rate (Pre-Development)
Q = CiA
C = Rational Method Runoff Coefficient 0.2 (open land)
i = rainfall intensity (in./hr.) 0.72 (calculated above)
A = Area (acres) 6.49 (calculated above)
Q = Runoff Rate (Pre-Development) (cfs) 0.93
5. Calculate Required Pond Volume
Total Area (acres) =6.49 acres
Weighted C =0.54
Discharge Rate (cfs) =0.93 cfs (Equal to Pre-Development Runoff Rate)
Duration(min)Duration(h
rs)
Intensity
(in/hr)Qin (cfs)Runoff
Volume
Release
Volume
Required
Storage
(ft3)
42 0.70 0.81 2.83 7132 2352 4780
43 0.72 0.79 2.79 7191 2408 4783
44 0.73 0.78 2.75 7249 2464 4785
45 0.75 0.77 2.71 7306 2520 4786
46 0.77 0.76 2.67 7363 2576 4786
47 0.78 0.75 2.63 7418 2632 4786
48 0.80 0.74 2.59 7473 2688 4785
49 0.82 0.73 2.56 7527 2744 4783
50 0.83 0.72 2.53 7581 2800 4780
51 0.85 0.71 2.49 7633 2856 4777
PROVIDED VOLUME (ft3)5238
OUTLET STRUCTURE SLOT - DETENTION POND 1 & DETENTION POND 4
Q=CLH3/2
Q = Discharge (cfs)0.93
C = Weir Coefficient 3.33 (per COB Design Standards)
H = Head (ft)1.5
L = Horizontal Length (ft) 0.15
L = Slot Width (inches) 1.8
MANNING'S EQUATION FOR PIPE FLOW
Project:Bridger Vale PUD Location:
By:AJC Date:6/10/2019
INPUT
D=15 inches
d=14.07 inches
Mannings Formula n=0.013 mannings
q=57.7 degrees
Q=(1.486/n)ARh2/3S1/2 S=0.004 slope in/in
R=A/P
A=cross sectional area
P=wetted perimeter V=(1.49/n)Rh2/3S1/2
S=slope of channel Q=V x A
n=Manning's roughness coefficient
Solution to Mannings Equation
Area,ft2
Wetted
Perimeter, ft
Hydraulic
Radius, ft velocity ft/s flow, cfs PVC 0.013
1.20 3.30 0.36 3.68 4.39 PE (<9"dia) 0.015
PE (>12"dia) 0.02
PE(9-12"dia) 0.017
CMP 0.025
ADS N12 0.012
HCMP 0.023
Conc 0.013
15" outlet pipe
Manning's n-values
d
q
D
MANNING'S EQUATION FOR PIPE FLOW
Project:Bridger Vale PUD Location:
By:AJC Date:6/10/2019
INPUT
D=8 inches
d=7.50 inches
Mannings Formula n=0.013 mannings
q=57.7 degrees
Q=(1.486/n)ARh2/3S1/2 S=0.004 slope in/in
R=A/P
A=cross sectional area
P=wetted perimeter V=(1.49/n)Rh2/3S1/2
S=slope of channel Q=V x A
n=Manning's roughness coefficient
Solution to Mannings Equation
Area,ft2
Wetted
Perimeter, ft
Hydraulic
Radius, ft velocity ft/s flow, cfs PVC 0.013
0.34 1.76 0.19 2.42 0.82 PE (<9"dia) 0.015
PE (>12"dia) 0.02
PE(9-12"dia) 0.017
CMP 0.025
ADS N12 0.012
HCMP 0.023
Conc 0.013
8" PVC CULVERT
Manning's n-values
d
q
D