HomeMy WebLinkAbout1.3 Bridger Vale Final PUD- Narrative Response to Comments 03-29-2021 1091 Stoneridge Drive • Bozeman, Montana • Phone (406) 587-1115 • Fax (406) 587-9768
www.chengineers.com • E-Mail: info@chengineers.com
Civil/Structural Engineering and Surveying
March 29, 2021
Brian Krueger
City of Bozeman
Planning Department
20 E. Olive Street
Bozeman, MT 59718
RE: Narrative Response to Comments – Bridger Vale PUD Subdivision Final PUD
Comments
Dear Mr. Krueger:
This letter is to provide a narrative response to the engineering comments provided on March 03,
2021:
Engineering Division, Cody Flammond, Engineering II
1. Code provision 4. BMC 38.220.300 and 310 and BMC 38.410.080.D. The last two sections
of the stormwater maintenance plan only discuss drywells. Drywells were not included in the
stormwater facilities for the site. The applicant must revise these sections to be address the facilities
that are on site.
• This item is noted. The stormwater maintenance plan has been updated to include
detention and retention facilities, but does not include drywells.
2. The POA must provide sufficient financial and technical resources to ensure the sub‐slab
vapor mitigation continues in effect until otherwise agreed to by the City. The POA documents
do not reference how this provision will be accomplished.
• Article XI, Section 2.B.v. explicitly states that the Association shall provide sufficient
financial and technical resources to ensure the sub‐slab vapor mitigation continues in
effect until otherwise agreed to by the City.
If you require any additional information please give me a call at (406) 587-1115.
Sincerely,
Drew Kirsch, E.I.