HomeMy WebLinkAbout09282021 148-105 sheet 6 FINAL PLAT-CONDITIONS OF APPROVAL SHEET INDEX: N
Sheet 1-Final Plat-Certificates,overall site plan(V 200')
ALLI NSUBDIVISION PHASE 4A Sheet 2-Final Plat-Lot Layout(1"=5(Y)
Sheet 3-Final Plat-Lot Layout(1'-50) W E.`
A SUBDIVISION OF LOT R-1 OF ALLISON SUBDIVISION PHASE 4B,(Plat Reference Sheet 4-Final Plat-Lot Layout(1"=50)
J-692),LOCATED IN THE NORTHEAST ONE-QUARTER AND THE SOUTHEAST Sheet 5-Conditions ofApproval(1"=5(Y)
ONE-QUARTER OF SECTION 24,TOWNSHIP 2 SOUTH,RANGE 5 EAST,P.M.M., Sheet 6-Conditions ofApproval(V—5(Y)CITY OF BOZEMAN,GALLATIN COUNTY,MONTANA
Sheet 7-Conditions of Approval 01 5(Y)
0' 60, 100, 150,
SCALE:1" 50'
W -- - -- A
W ater 'sewer W W Alle W W W W W / � - - -
See Detail A
MATCH ease.( )LINE MATCH LINE
1 Foot no access •B L O C K 5• B L O C K 2�
strip along South ID /
11th Avenue
/ N n Lot B `
1 AL —
Q t ILot 9 Lot 10 Lot 11 Lot 12 Lot 13 Lot 14 Lot 15 Lot 16 I /
t AL
1 Foot no access std oo wide / a at,(ia°
p • y Q
Street W along Arnold Street �tilityeasement—yy � / / c / � � ---------
Arnold — — — — —
unlit easement Arnold Street
\ / Roadway, a� \
/ Phase 4A curb and sidewalk \ o\ \ / / �' I —
_ _ _ _ _ _ _ _
/ Lott Lot Lot3 Lot Lots 1\
0' °o
B L O C K 6
�O
/ 70n.
fo Strea 4p /�`
/ Alley - - m oc / °7uyeaena SO\ \ l — — — — — —
/
/ Lot 1 \ _ �, /W
(D 51- Arnold Street
P�
/ Future Phase CONDITIONS OF APPROVAL: 8.The responsibility of maintenance for the stormwater facilities located
outside of the public right-of-way,street frontage landscaping for the
1.Due to the high ground water tables in the areas of this subdivision no perimeter streets,and the all weather access road along the North end
O r crawlspaces or basements may be constructed within the subdivision, of Block 2 must be that of the property owners'association.
/ unless a professional engineer registered in the State of Montana Maintenance responsibility must include,all vegetative ground cover,
certifies that the lowest point of any proposed structure is located above boulevard trees and irrigation systems in the public right-of-way
the seasonal high groundwater level and provides supporting boulevard strips along all external perimeter development streets.The
/ zm property owners'association must be responsible for levying annual
groundwater data prior to the release of build permits.In addition sump
pumps are not allowed st m discharged to the sanitary sewer system,
assessments to provide for the maintenance,repair,and upkeep of all
perimeter street frontage landscaping,stormwater facilities,and the
stormwater drainage system,streets,or into the curb and gutter.
aforementioned access road.
2.All downstream water user facilities will not be impacted by this 9.A 1 foot no access strip shall be placed along the property frontage
Subdivision. fronting on South 11th Avenue and Arnold Street.
3.City standard residential sidewalks shall be constructed on all public 10.The applicant must construct street lights per the City of Bozeman
street frontages of a property pdor to occupancy of any structures on the Design Standards and Specifications Policy and setup a special
property. Upon the third anniversary of the recordation of the plat shown improvement light district(SILD)for maintenance of the lights with the
and described hereon,any lot owner who has not constructed said City Finance Department prior to final plat approval.
I sidewalk shall,without further notice,construct within 30 days said
sidewalk for their lot(s)regardless of whether other improvements have 11.The property falls within the payback created for the recently
/ So, been made upon the lot. completed South 1lth Avenue,see Resolution 5003.Payment for the
4.Hom properties proportional share must be provided prior to final plat
es on corner lots must have the same orientation as homes on approval.
the interior of the block(long side)as adjacent homes on the same
street. Corner lots must have front setbacks on both street frontages. 12.The property falls within the payback created for the recently
completed Graf Street,see Resolution 4740.The proposed developable
5.The developer must pay CIL of water rights prior to final plat approval. lots are not within the Graf Street payback area.The proportional share
The CILWR for the following lots is deferred to future development:Lot 1 of the Graf Street payback area for the restricted lots will be paid at the
and 2 of Block 1,Lot 1 and 2 of Block 2,Lot 1 of Block 3,Lot 2 of Block time of future development application for the restricted lots as
7,and Lot 1 of Block 9.The CILWR for these lots must be provided at applicable.
Limit of wetlands per the time of future development.
TerraQuatics,LLC 13.All lots within the Allison Subdivision,Phase 4Aam under and
delineation dated 6. NOTICE IS HEREBY GIVEN to all potential purchasers of Lot 2 Block subject to the terms and conditions of the Property Owners Association
November,2020 2;Lot 2 Block 7 and Lot 1 Block 9 of the Allison Subdivision Phase 4A, per Document no. at the Gallatin County Clerk and
City of Bozeman,Gallatin County,Montana,that the final plat of the Recorders Office.
� subdivision was approved by the Bozeman City Commission without
completion of on and off site improvements required under the Bozeman 14.Legal and physical access is provided to each parcel within this plat.
/ Municipal Code,as is allowed in Chapter 38.270 of the Bozeman
"A Municipal Code.As such,this Restriction is filed with the final plat that 18.Buyers of property should ensure that they have obtained and
stipulates that any use of these lots are subject to further subdivision, reviewed all sheets of the plat and all documents recorded and fled in
and no development of these lots must occur unfil all on and off site conjunction with the plat,and that buyers of property are strongly
y improvements are completed as required under the Bozeman Municipal encouraged to contact the local community development department and
Code.THEREFORE,BE ADVISED,that Building Permits will not be become informed of any limitations on the use of the property prior to
° n issued for Lot 2 Block 2;Lot 2 Block 7 and Lot 1 Block 9 of the Allison closing.
Lot 2 yw �'// Subdivision Phase 4A,City of Bozeman,Gallatin County,Montana until
/ Lot develoment subject a - ' all required on and off site improvements are completed and accepted by
to further subdivision review
,- Vic/ /, / the City of Bozeman.No building structure requiring water or sewer
facilities must be utilized on these lots until this restriction is liked.This
L / restriction runs with the land and is revocable only by further subdivision
OG or the written consent of the City of Bozeman.
D
N 9°^o
v�a a°a�eP�t� '
gp
Q a
ni°°p R` as
B ata° B SHEET
PROJECT SURVEYOR: MSL
MADISON ENGINEERING MERIDIAN LAND DRAWN BY: MSL 6 OF 7
MATCH LINE / MATCH LINE 895 Technology Boulevard SURVEYING, INC.
Suite 203,hozeman,mt 59 FAX , , ,718 610 Professional Drive Suite 3 Bozeman MT 59718 REVIEWED BY: JSM 148-105 BASE.DWG
(406)586-0262 (406)586-5740 Phone(406) 624-6565
e-mail: meridiansurveying@yahoo. m DATE:09/28/2021 PROJ.No.MT-020-051-24-148.105-20