Loading...
HomeMy WebLinkAboutSP002 - GARBAGE ENCLOSURE 07-15-20201 2 KL SP0023 10' - 0"10' - 0"14' - 9"22' - 0"1 CANOPY ROOF, SEE G120 FOR ASSEMBLY 8' - 1 1/2"7' - 5 3/4"DOUBLE STEEL GATE EXTERIOR FIN WALL, SEE G120 FOR ASSEMBLY 111112 10' - 0"10' - 0"3 3/4" SP002 2 Sim 1 2 SEE EXT. ELEVATIONS FOR SCREENING 22' - 0"7' - 1 1/2"4' - 0"HSS COLLUMN, SEE STRUCT. HEAVY DUTY HINGE MOUNTED TO COLLUMN DOUBLE STEEL GATE, SEE COMPONENET SCHEDULE L SEE EXT. ELEVATIONS FOR SCREENING 14' - 9"4' - 0"11' - 3 1/4"NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:38:56 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP002 GARBAGE ENCLOSURE SITE PLAN APRIL 21, 2020 SCALE:1/4" = 1'-0"1 GARBAGE ENCLOSURE @ BUILDING -SITE PLAN SCALE:1/2" = 1'-0"3 TRASH ENCLOSURE ENLARGED ELEVATION-SITE PLAN SCALE:1/2" = 1'-0"4 SOUTH SITE PLAN STUDY -Callout 1 SCALE:1 1/2" = 1'-0"2 HINGE @ GARBAGE ENCLOSURE COLLUMN -SITE PLAN SCALE:1/2" = 1'-0"5 WEST SITE PLAN STUDY -Callout 1 REVISION SCHEDULE No. Description Date