HomeMy WebLinkAboutTCF Stormwater Maintenance Plan_05-15-19 TOWN & COUNTRY FOODS
Storm Water Facilities
Maintenance Plan
Project Name File No. 19029
Owner's responsibility for routine inspection and maintenance
1. Keep the curb inlets, area drains and pipes free of leaves, rocks, and other debris.
2. Periodically inspect and clean curb inlets, area drains and pipes.
3. Remove sediment from curb inlets sump by hand during the summer months
whenever sediment has accumulated to greater than 3"in the bottom of the basin.
7. See that litter and other debris are removed from grates in order to reduce
obstruction of flow.
8. The underground storm water retention/infiltration systems are to be visually
inspected at a minimum biannually.
9. The CDS system is be inspected and maintained per the CDS Inspection and
Maintenance Guide.
10. The StormTank retention/infiltration system to be inspected and maintained per the
manufacturer's Inspection and Maintenance Guide.
11. Owner to maintain and fund Operation and Maintenance of facilities.
Signed L(�,( O�(�`K`'`a
'Town& Country Foods
GAMADISON ENGINEERING\PROJECTS\2018\18-121-Town&Country\Storm\STORMWATER MAINTENANCE PLAN.doc