July 8, 2020
RE: Concurrent Construction Request for the proposed Town & Country Foods project
On behalf of our client, Town & Country Foods, we are requesting concurrent construction for
the required public infrastructure improvements for the proposed Town & Country Foods Store
to be located on Fallon Street @ Resort Drive.
The required public improvement is for a water main extension on the east side of the site. The
improvement is required for the development of the property.
Based on the Bozeman Unified Development Code (UDC), Section 38.270.030.C.1 b&c we
believe the following conditions allowing concurrent construction are met.
38.270.030.C.Lb The water mains, sewer mains and streets to be extended to provide
service to the development are: located within a publicly dedicated right-
of-way or easement; constructed to city standards; are physically adjacent;
are installed and accepted by the city; and are adequate in capacity to
provide necessary service to the proposed development; and comply with
the requirements of this subsection C.Lb and subsection C.Lc of this
section;
Response:
1. The water main extension will be within a publicly dedicated right-of-way
and easement.
2. The required main extension will be constructed to City Standards.
3. The water main extension is on and adjacent to the lot on which the Town
& Country is being built.
4. The water main extension is the same size as the mains being connected
to. The main extension loops into existing mains and is of adequate
capacity to provide necessary service to the proposed development.
5. The required easement will be included on the Amended Plat, a copy of which is
included in this resubmittal.
38.270.030.C.1.c Water mains, sewer mains and streets shall meet the following
requirements:
GAMADISON ENGINEERING\PROJECTS\2018\18-121-Town&Country\Application\Concurrent Construction\Concurrent Review
Request letter.doc
895 Technology Blvd Ste 203 ♦ Bozeman, MT 59718 ♦ (406) 586-0262 ♦ Fax (406)586-5740
June 30, 2020 Town&Country-Concurrent Construction Request
(1) Any required on-site extensions of water mains, sewer mains or streets to be
dedicated to the public shall be located entirely within publicly held easements or
rights-of-way; shall serve only a single lot; are the subject of an irrevocable offer
of dedication to the city upon completion of the project; the development is under
the control of a single developer who shall retain control of the entire project until
final completion; all work is under the supervision of a single general contractor;
and no subdivision of land is involved;
Response:
l. The water main extension will serve only one lot will be located within an
existing Public Right of Way and easement. The easement will be included
on the Amended Plat, a copy of which is included in this resubmittal.
2. The water main extension is being constructed for the development of the
Town & Country Foods Store.
3. The developer agrees to the required irrevocable offer of dedication of the
improvements to the city upon completion of the project.
4. The water main extension will be under the control of a single developer
who shall retain control of the entire project until final completion.
5. All work will be under the supervision of a single general contractor.
6. No subdivision of land is involved with this site plan approval.
(2) The DRC shall determine when the standards of this subsection C.I are met. The
fire department must consider whether adequate fire protection services are
available from existing hydrants, and water supply exists to meet needs during
construction. If adequate fire protection does not exist then concurrent
infrastructure and building construction may only occur under the provisions of
subsection C.l.c.(3) of this section. Based on evaluation by the fire department,
simultaneous construction of infrastructure to be dedicated to the public and
private construction may be permitted only within a defined portion of the site;
Response: The Bozeman Fire Department, has been contacted with regards to this
request to allow concurrent construction. The Concurrent Construction request is
for water main extension only.
(3) Approval of the final engineering design, including location and grade, for the
infrastructure project must be obtained from the engineering department, and the
state department of environmental quality when applicable, prior to issuance of
any building permit for the development;
Response: Infrastructure design has been submitted for review.
Madison Engineering LLC Page 2
June 30, 2020 Town&County -Concurrent Construction Raciest
(4) No occupancy, either temporary or final, may be issued until all on-site and
offsite water, sewer and street or drive improvements are installed and accepted or
approved as applicable by the city.
Response: The owner acknowledges no occupancy of any structures or
commencement of any use will be allowed until required infrastructure
improvements have been completed, inspected and accepted by the city, and a
certificate of occupancy has been issued.
� -j) • No. n`5,PC .
irrcr 7 C�(2AO
Madison Engineering LLC Page 3
Chris Budeski
From: Scott Mueller <SMueller@BOZEMAN.NET>
Sent: Wednesday,July 8, 2020 2:11 PM
To: 'chris@mad-eng.com'
Cc: Anna Russell; 'Nick Fulton'
Subject: RE: Concurrent Construction Request- Town & Country
Chris,
Fire approves the concurrent construction request for Town &Country Foods located at Fallon St and Resort Dr,
Regards,
SC4a w6wi
Deputy Chief Fire Marshal
Bozeman Fire Department
34 N Rouse Ave
Bozeman, MT 59715
Office (406)582-2353 Mobile(406)589-6271
From: Chris Budeski<chris@mad-eng.com>
Sent:Wednesday,July 1, 2020 3:55 PM
To:Scott Mueller<SMueller@BOZEMAN.NET>
Cc:Anna Russell<ARusse.11@BOZEMAN,NET>; Nick Fulton <nickf@bechtlearchitects.com>
Subject:Concurrent Construction Request- Boulder Creek Apartments
Scott:
We are requesting concurrent construction for the extension of a water main for the proposed Town & Country
Foods Store to be located on Fallon Street @ Resort Drive. The main extension is required for the development
of the Town & Country Food Store on the parcel. The proposed site plan and main extension design is shown
in the attached PDF's.
Please consider our request at your earliest convenience. An email response is appropriate.
If you have any questions or need additional information please feel free to contact me.
Sincerely:
Chris G. Budeski,PE
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office
406.586.5740 fax
chris@mad-eng.com