Loading...
HomeMy WebLinkAboutMSP000 - MASTER SITE PLAN COVER SHEET 07-15-2020LIST OF ABBREVIATIONS AP ACCESS PANEL ACT ACOUSTIC CEILING TILE ALT ALTERNATE AB ANCHOR BOLT ∠ANGLE APPD APPROVED APPR APPROXIMATE ARCH ARCHITECTURAL ASPH ASPHALT @ AT AVE AVERAGE BM BEAM BRG BEARING BM BENCH MARK BLKG BLOCKING BD BOARD BS BOTH SIDES BOT BOTTOM BRK BRICK DS DOWN SPOUT D DRYER EA EACH E EAST ELEC ELECTRIC EL ELEVATION EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXT EXTERIOR FT FEET FIN FINISH FF FINISHED FLOOR FE FIRE EXTINGUISHER FIX FIXTURE FL FLOOR FD FLOOR DRAIN FT FOOT FTG FOOTING MATL MATERIAL MAX MAXIMUM MTL METAL MIN MINIMUM MISC MISCELLANEOUS MOD MODULAR MECH MECHANICAL NOM NOMINAL N NORTH NTS NOT TO SCALE NO NUMBER OC ON CENTER OPNG OPENING OPP OPPOSITE OVHD OVERHEAD PTD PAINTED PNL PANEL PTN PARTITION PERM PERMANENT SERV SERVICE SHT SHEET SHTHG SHEATHING SIM SIMILAR S SOUTH SPEC SPECIFICATION SQ SQUARE STD STANDARD STL STEEL STG STORAGE STRUCT STRUCTURAL SYS SYSTEM THRU THROUGH T&G TONGUE AND GROOVE TR TREAD TYP TYPICAL UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD VP VENT PIPE BLDG BUILDING CAB CABINET CLG CEILING CL CENTER LINE CC CENTER TO CENTER CER CERAMIC CIR CIRCLE CLR CLEAR COL COLUMN CONC CONCRETE CMU CONCRETE MASONRY UNIT CONST CONSTRUCTION CONT CONTINUE CT CERAMIC TILE DP DAMP ROOFING DIA DIAMETER DIM DIMENSION DW DISHWASHER DN DOWN FND FOUNDATION GALV GALVANIZE GA GAGE GL GRADELINE GWB GYPSUM WALL BOARD HDWD HARDWOOD HT HEIGHT HOR HORIZONTAL HB HOSE BIB IN INCH INSUL INSULATION INT INTERIOR JT JOINT JST JOIST LAM LAMINATE LAV LAVATORY LG LENGTH LT LIGHT MFG MANUFACTURING PERP PERPENDICULAR PL PLATE PLMB PLUMBING PT POINT LB POUND PSI POUNDS PER SQUARE INCH PREFAB PREFABRICATED QTY QUANTITY R RADIUS REF REFRIGERATOR REG REGISTER REINF REINFORCE REQD REQUIRED REV REVISION R RISER RFG ROOFING RM ROOM SCHED SCHEDULE SECT SECTION VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD WTP WATERPROOFING WP WEATHERPROOF WH WEEPHOLE WT WEIGHT W WEST W WIDTH WDW WINDOW WG WIRE GLASS W/O WITH OUT WD WOOD WM WASHING MACHINE PROJECT SITE: FERGUSON FARM SUB, S10, T02 S, R05 E, BLOCK 5, LOTS 1-4 4567 FIELD STREET, BOZEMAN, MT 59718 CODE INFORMATION: APPLICABLE CODES: (STATE OF MONTANA) -INTERNATIONAL BUILDING CODE, 2018 EDITION -UNIFORM PLUMBING CODE, 2012 EDITION -INTERNATIONAL MECHANICAL CODE, 2012 EDITION -INTERNATIONAL FUEL GAS CODE, 2012 EDITION -NATIONAL ELECTRICAL CODE, 2014 EDITION -INTERNATIONAL ENERGY CONSERVATION CODE, 2012 EDITION -NFPA 70, 2014 EDITION -BOZEMAN MUNICIPAL CODE OF ORDINANCES, CHAPTER 38 UNIFIED DEVELOPMENT CODE ZONING: B-2 FIRE SPRINKLERS: NFPA-13 ALLOWABLE BUILDING HEIGHT: 38 FEET ACTUAL BUILDING HEIGHT: 35 FEET BUILDING AREA: MAIN FLOOR:33,843 SF SECOND FLOOR: 4,535 SF TOTAL:38,378 SF PROJECT INFORMATION OWNER: TOWN AND COUNTRY FOODS 1611 SOUTH 11TH AVE BOZEMAN, MT 59715 CONTACT: TRAVIS FRANDSEN ARCHITECT: BECHTLE ARCHITECTS 4515 VALLEY COMMONS DRIVE #201 BOZEMAN, MT 59718 (406) 585-4161 CONTACT: SCOTT BECHTLE GENERAL CONTRACTOR: LANGLAS & ASSOCIATES 1910 E. MAIN ST. #101 BOZEMAN, MT 59715 (406) 585-3420 CONTACT: ROGER DAVIS CIVIL ENGINEER: MADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 CONTACT: CHRIS BUDESKI STRUCTURAL ENGINEER: AE DYNAMICS 1800 W KOCH ST, SUITE 5 BOZEMAN, MT 59715 (406) 763-6375 CONTACT: CHRIS HIGINBOTHAM ELECTRICAL ENGINEER: BEARTOOTH LIGHTING & DESIGN 2784 CATALYST ST, B BOZEMAN, MT 59718 (406) 551-3669 CONTACT: ANDREW MOORE MECHANICAL ENGINEER: SE ENGINEERS PO BOX 10776 BOZEMAN, MT 59719 (406) 600-8796 CONTACT: BILL EDDEN LANDSCAPE ARCHITECT: DESIGN 5 37 E MAIN ST BOZEMAN, MT 59715 (406) 587-4873 CONTACT: TROY SCHERER FIRE SUPPRESSION COFFMAN ENGINEERS 751 OSTERMAN DR. #104 BOZEMAN, MT 59715 (406) 582-1936 CONTACT: ROBERT BLAKEMAN PROJECT DIRECTORY 1. AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION APPLIES TO THIS PROJECT AND SHALL BE INCORPORATED IN THE SERVICES PROVIDED BY THE GENERAL CONTRACTOR. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT. 3. USE WRITTEN DIMENSIONS. DO NOT SCALE DRAWINGS. WHERE NO DIMENSION IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTING, BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY AN ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE COMPLETION OF WALLS, CEILING, AND FINISH MATERIALS. 5. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING. 6. ALL MATERIALS AND FINISHES ARE TO BE AS SPECIFIED, OR PRE-APPROVED EQUAL, PRIOR TO BIDDING. 7. SUBSTITUTIONS SHALL BE BY APPROVAL PRIOR TO THE BID, OR INDICATED AS A LINE ITEM ON THE BID AS AN ALTERNATE TO THE BASE BID. SEE SPECIFICATIONS IF AND WHEN APPLICABLE. 8. CONTRACTOR IS TO USE WATER-RESISTANT GYPSUM WALL BOARD IN ALL WET SPACES (RESTROOMS, JANITORIAL AREAS, MECHANICAL/PLUMBING ROOMS, FOOD SERVICE ROOMS, ETC.) 9. CONTRACTOR SHALL PROVIDE REDLINED AS-BUILT DRAWINGS, SHOWING ANY CHANGES TO PLANS, ELEVATIONS, SYSTEMS, DIMENSIONING, ETC. PRIOR TO FINAL PAYMENT. AND HAVE A SET ONSITE, UPDATED MONTHLY GENERAL PROJECT NOTES PROPOSED LOT 1 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 150,964 SF (3.46 ACRES) USABLE COMMERCIAL OPEN SPACE: 3,432 SF PERCENT OPEN SPACE PROVIDED: 2.3% PROPOSED LOT 2 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,040 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 795 SF PERCENT OPEN SPACE PROVIDED: 4.9% PROPOSED LOT 3 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,193 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 805 SF PERCENT OPEN SPACE PROVIDED: 4.9% COMMERCIAL OPEN SPACE NON-RESIDENTIAL SITE WITH TOTAL SITE AREA GREATER THAN ONE ACRE MUCH PROVIDE OPEN SPACE EQUAL TO AT LEAST TWO PERCENT OF THE DEVELOPMENT ENVELOPE. PER SEC.38.520.060.C This acknowledges that the following project was designed by Bechtle Architects with full knowledge that the City of Bozeman Building Division will not review for compliance with, nor is responsible for enforement of the Federal Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973, the Fair Housing Act of 1988, Title 49 Chapter 2, commonly known as the Montana Human Rights Act or similar federal, state, or local laws that mandate accessibility to commercial construction or multi-family housing. ADA CERTIFICATION PROPOSED LOT 1 = 150,964 SF FLOOR AREA TOWN & COUNTRY FOODS = 33,843 33,843 / 150,964 = 0.224 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,040 = 0.366 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,193 = 0.363 FAR PARKING CALCULATIONS RETAIL STORE AND SERVICE ESTABLISHMENTS: 1 SPACE PER 300 SQUARE FEET OF FLOOR AREA OFFICES: 1 SPACE PER 250 SQUARE FEET OF FLOOR AREA RESTAURANTS, CAFES, BARS AND SIMILAR USES: 1 SPACE PER 60 SQUARE FEET OF INDOOR SERVING AREA; PLUS 1 SPACE PER 120 SQUARE FEET OF OUTDOOR (PATIO) AREA WAREHOUSING, STORAGE OR HANDLING OF BULK GOODS: 1 SPACE PER 1,000 SQUARE FEET OF FOOR AREA STORE RETAIL STORE AREA: 28,584 SF X 85% = 24,296 / 300 81 SPACES OFFICE AREA: 2,712 SF X 85% = 2,305 / 250 = 9 SPACES DELI SEATING AREA INDOOR: 1,214 SF X 85%= 1,032 / 50 =21 SPACES DELI SEATING AREA OUTDOOR: 1,450 X 85%= 1,233 / 100 = 12 SPACES WAREHOUSING AREAS: 6,092 SF X 85% = 5,178 / 1000 = 5 SPACES TOTAL REQUIRED PARKING SPACES T&C = 128 PARKING SPACES PAD SITES RETAIL: 10,800 SF X 85% = 9,180 / 250 = 36 SPACES TOTAL REQUIRED PARKING SPACES PAD SITES = 36 PARKING SPACES TOTAL MINIMUM PARKING FOR THE DEVELOPMENT = 164 SPACES UDO SECTION 38.540.050.A.2.B: MAXIMUM PARKING. PROVISION OF PARKING SPACES IN EXCESS OF 125 PERCENT OF THE MINIMUM NUMBER OF SPACES REQUIRED FOR THE NET FLOOR AREA IN THIS SUBSECTION 2 IS NOT PERMITTED. TOTAL MAXIMUM ALLOWED PARKING FOR DEVELOPMENT = (164 X 125%) = 205 SPACES TOTAL PARKING PROVIDED FOR DEVELOPMENT = 199 + 24 EXTRA BIKE PARKING BICYCLE PARKING: MINIMUM 10% OF PARKING STALLS: 12.8 =13 BIKE PARKING SPACES FOR ENTIRE DEVELOPMENT; 10 PROVIDED AT RETAIL STORE 2 COVERED BIKE PARKING = 1 CAR STALL WHEN LOCKERS & SHOWER PROVIDED PROJECT SITE VICINITY MAP CONSTRUCTION ROUTE PROPOSED LOT 1 = 150,964 SF PROPOSED BUILDING AREA = 33,843 / 150,964 = 0.224 = 22.4% DRIVEWAY CIRCULATION & PARKING = 81,071 / 150,964 = 0.527 = 52.7% LANDSCAPED AREAS = 37,590 / 150,964 = 0.249 = 24.9% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 / 16,040 = 0.366 = 36.6% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,040 = 0.118 = 11.8% LANDSCAPED AREAS = 8,276 / 16,040 = 0.516 = 51.6% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 / 16,193 = 0.363 = 36.3% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,193 = 0.116 = 11.6% LANDSCAPED AREAS = 8,436 / 16,193 = 0.521 = 52.1% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PARCEL PERCENTAGES NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/17/2020 4:08:59 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 MSP000 MASTER SITE PLAN COVER SHEET MASTER SITE PLAN APRIL 21, 2020 BOZEMAN, MONTANA TOWN AND COUNTRY FOODS LANDSCAPE L0.0 OVERALL SITE PLAN TOWN & COUNTRY 06/30/2020 L0.1 OVERALL OPEN SPACE AND PHASING 06/30/2020 L0.2 OPEN SPACE NOTES AND LEGENDS 06/30/2020 L0.3 NOTES AND LEGENDS TOWN AND COUNTRY SITE 06/30/2020 L3.0 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.1 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.2 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.3 PLANTING PLAN ENLARGEMENT 06/30/2020 L5.0 LANDSCAPE DETAILS 06/30/2020 L5.1 LANDSCAPE DETAILS 06/30/2020 L6.0 IRRIGATION WATER USE PLAN 06/30/2020 L7.0 IRRIGATION DETAILS 06/30/2020 L7.1 IRRIGATION DETAILS 06/30/2020 CIVIL C0.1 PHASE PLAN 04/30/2020 C0.2 EX SITE/DEMO 01/20/2020 C1.0 MASTER SITE PLAN 7/1/2020 C1.1 MASTER UTILITY PLAN 7/1/2020 C1.2 MASTER GRADING PLAN 7/1/2020 C2.0 CIVIL DETAILS 01/20/2020 C2.1 CIVIL DETAILS 01/20/2020 ARCHITECTURAL - MSPR MSP000 MASTER SITE PLAN COVER SHEET 7/1/2020 MSP001 GARBAGE ENCLOSURE 04/21/20 ELECTRICAL MSP / SP E001 ELECTRICAL LEGEND SCHED 01/20/2020 E002 LIGHTING ELEVATIONS 01/20/2020 E003 LIGHTING ELEVATIONS 01/20/2020 E101 SITE LIGHTING PLAN 01/20/2020 E102 SITE POWER PLAN 01/20/2020 REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20