HomeMy WebLinkAboutE101 - SITE POWER PLAN 01-16-20 5� R.
- x4NxL
�GpC�
S S \ / VA TO\SI'
.l
V �/ _ 60 R/wLi _ -
G-FIB-- \ / _
�_ IP A- - -�—�_I B— s—ir--FIB —,—G- II�-PI2 - -�—�— —4 L Q z Z
® I
9
O
0 5
G
pp 0-0 I Q O
s I
z O Q
L - - �
Q I"L
z N
III I I � �� � I i
I ® s ill III
I I0.0
I� 6 h
Beartooth
Lighting
Design
I��--I-----I ------f--- Imo— . ' I
0===�-----=T=== I � I
N I I � a II 7
'^
� I I L _ J I � I � � I _ � I � I s 6 II
— 0 a-*-' =� =—
0
CV 01
0)CID
Lo
i - - o�g
FTI E v
as
o as as as as s as as as a FIELD ST. 11
EcQ
s 60 R/W 'T E
0)�
'S SJ0 a SJ9 d p 7
0 P�S 0 0 P�,S 0 P MS WW1 hrrY"1, j 0]t0
Lq
0
w
1 SITE POWER PLAN
C
c E101 1"=30'-0" JOB: 1871
0
G
SHEET NOTES GENERAL NOTES DESIGN
DEVELOPMENT
1. PAD MOUNTED PRIMARY JUNCTION BOX LOCATED WITHIN UTILITY EASEMENT BY N.W.E. 1. INSTALLATION SHALL COMPLY WITH WITH THE LATEST LOCAL CODES AND STANDARDS.
a
v
2. 34 PRIMARY UNDERGROUND SERVICE BY N.W.E. 2. COORDINATE ALL UTILITY ROUTING AND METER LOCATIONS WITH N.W.E.PRIOR TO ROUGH-IN. REVISION SCHEDULE
7 3. 1000KVA PAD MOUNT SERVICE XFMR BY N.W.E.PROVIDE 8'-0"x 8'-0"PAD IN ACCORDANCE WITH 3. REFER TO BUILDING PERMIT PACKAGE FOR LIGHTING CIRCUITING&CONTROL INFORMATION. No. Description Date
L N.W.E.REQUIREMENTS.
4. REFER TO BUILDING PACKAGE FOR SPECIFICATIONS.
4. MAIN SWITCHBOARD'MSB':480YI277V,3m,4W CIRCUIT BREAKER STYLE MAIN DISCONNECTING
p MEANS WITH NEMA 3R ENCLOSURE.REFER TO BUILDING PACKAGE FOR ADDITIONAL 5. SIZES OF EQUIPMENT ARE BASED ON BASIS OF DESIGN MANUFACTURER.EC SHALL COORDINATE
REQUIREMENTS.PROVIDE 6"CONCRETE PAD.COORDINATE CONDUIT OPENING IN PAD WITH WITH FINAL APPROVED SHOP DRAWING INFORMATION FOR ALL EQUIPMENT PRIOR TO ROUGH-IN.
E FINAL APPROVED SWITCHBOARD SHOP DRAWINGS.
W
5. PROVIDE(2)2"&(1)4"CONDUITS WITH NYLON PULL STRINGS BETWEEN EDGE OF BUILDING AND
y PROPERTY LINE FOR INTERNET SERVICE PROVIDERS.SEE BUILDING PACKAGE FOR
CONTINUTION TO 2ND FLOOR MAIN DISTRIBUTION FRAME(MDF).
v cc
? 6. SECONDARY FEEDER BY N.W.E.,CONDUIT&PULL STRING BY EC.PROVIDE(5)4"PVC CONDUITS G
BETWEEN XFMR SECONDARY SECTION AND MAIN SWITCHBOARD CONDUIT ENTRY AREA. Q
o N
o CN
J6 SITE POWER PLAN
o
a
O
v
o
r
CO
e � E101
A
�i T