Loading...
HomeMy WebLinkAboutC0.1 - Phasing Plan Rev 2 03-18-20 • 23'6�P o o T,y ^p0 "I. ,•0��10,�;5 �- EXT'G TER PHASEI Q u 0 ABANDON EXT'G WATER m 0 SERVICES AT MAIN FOR SIR MAIN ALL SERVICES NOT TO BE w w ww w www w w w w USED, PER C.O.B. STDS,� w w w DRIVEWAY TO BE—w w ww w w w w w www w w w w�i BOULEVARD EXYG CURB INSTALLED WITH SCALE 3 z DRIVEWAY TO BE a LANDSCAPING & GUTTER ALLON S PHASEI _ w = S`� INSTALLED WITH S S S S S S S S - - INSTALLED WITH PHASEI 60 NEW a BOULEVARD LANDSCAPING—,S S S S S a� S �� w EXT'G BOULEVARD LANDSCAPING 10' FRONTYARDcn m m PHASEI INSTALLED WITH PHASEI z w SIDEWALK INSTALLED WITH PHASE I SETBACK N 1•-3W o N U O 3 w 3 d d G-FI��G-•FI=�I G-FI G-FIB— LG-FIB—�G-FIB— LG-FIB— II-FIB- UG_FI G FI G "--_ O 0 EXT'G 12" — — — — — — — — — — — — — — — — — — — - — — — — - - — m STORM DRAIN SQ 3 FI�—�G-FI G_plo ARROW BOLT > —I S5 6 I 9 EXT'G STORM � RELOCATED WITH AtlM NOD D SD SD D SID —�5I D SID g S -----, r � ELEV=4826J1' sD F- �r- PROPERTY LINE � � � �� FUTURE PHASE o ® I I 5 iG Ll � PHASE I /j% EXTG STORMWATER DETENTION z _ DRAIN OUTLET - v, / FACILITY TO BE ELIMINATED. RIM 4820.07 PHASEI I I I /�j/ TORMTANK UNDERGROUND q-5 �No T 30' WIDE ACCESS I I I PHASE I PHASE FUTURE � � RETENTION/INFILTRATION SYSTEM PHASEI EASEMENT I I ( ) ONE PHASE / pNTq REcoNsmucTEO '� 30' UTIL. F j// // TO BE INSTALLED Ny OR NG STORM WATER PHASEI I EASEMENT TYP eh�do RETENTION TOWN&COUNTRY o 0 o-o FUTURE & GUTTER a10�E25I PROPOSED �� I �i i- EXT'G CURB FOODS STORE 9 9 I ,� 9 PHA I 9 9 PHASE I - WATER BLDG PAD E 5' SIDEYARD / / I SETBACK a ❑ &ASSOCIATED 0' WIDE MAIN EXPHA3E N1 SITE ��������� e A PUBLIC TRAIL PAINr'�T EASEMENT o' uTIL _ �� &REAR ACCESS EASEMENT DELIVERY LANE DRAWN BY: TDB 10' FRONTYARD REVIEWED BY: BLB EXT'G PROPERTY II EXT'G SAN S u, a �j/�j SETBACK LINE (TYP) -� PHASE I - THIS MAIN TO REMAIN '�//�� " 05 PROJECT ENGINEER:CGB - SECTION OF SEWER ® — — — — IN SERVICE — — /� �04�6 U DESIGNED BY:COB MAIN TO BE REMOVED I Q RECOPHASEI NSTRUCTED i� S �S S S S S IS S S SFUTURE I — BOULEVARD sroRM WATER PHASE I - THIs A PARHING RETENTION SECTION OF WATER o-o — — � j j/j� LANDSCAPING BASIN LOT // INSTALLED WITH MAIN TO BE REMOVED j jj j PHASE I vi Imo PHASE 1 _ / �, NU w w w w W w w f-�w w w W w w w —w w w PRORELRTY LINE OCATION a i CPU o i 0 `L PHASE I 3 g S � PROPERTY LINE � 5 � I � I � I I I PHASE I THIS SECTION L v RELOCATION m OF WATER MAIN TO BE ti 1 ABANDONED IN PLACE. 0 PHASEI •,.{'�' BE RELOCATED PHASE FUTURE �j/ _.-.. w o-o ONE -PHASE ® E 3 1 SE I 30'AUTIL. 8" WATER MAIN - - - FUTURE a EASEMENT(TYPO (TO REMAIN) pARG I W I® a _ EXT'G CURB CUT LOT & (S� T ��/�j// SIDEWALK CHASE N EXT'G STORM DRAIN OUTLET 4821.07 ;3 = •� _ //�� FUTURE PHASE QI EXYG STORMWATER DETENTION DRIVEWAY TO BE FACILITY TO BE ELIMINATED. INSTALLED WITH_ — — TORMTANK UNDERGROUND Ms PHASEI RETENTION/INFILTRATION SYSTEM Q ITT INSTALLED 0 BE S LLED EXT'G 21" PVC STORM BRAIN .3 EXT'G OUR & -, - 10' FRONTYARD m <n GUTTER w w'\ w—SETBACK W w_E 'G SIDEWALK w w w w w w w W w BOULEVARD LANDSCAPING w w w w w • EXT'G CURB & GUTTER INSTALLED WITH PHASE 1 DRIVEWAY TO BE BOULEVARD INSTALLED WITH—as (IS as as (ISG Os as Gs a EXT'G SIDEWALK 60 RW FIELD ST. LANDSCAPING PHASE I ' INSTALLED WITH EXT'G 21" PVC UTILITY EASEMENT / PHASEI EXT'G SDMH STORM DRAIN ALONG EXTERIOR BOUNDARY in UNLESS NOTED a 0 0 RIM 4825.12 � vP' EXT'G ROUNDABOUT J N v INV OUT 4821.38 g�-� 5�' WATER 8" F� L_ N FI,- l WATER MAIN "S v0 'C ,OPR4171`1- F O ti f �GSOP C` BOULEVARD LANDSCAPING g�.V 4"S v9 0, 0' �O FEEt�-LO��� INSTALLED WITH PHASEI �FPg'�' LEGEND P PROPERTY BOUNDARY UTILITY EASEMENT — — —ACCESS AND DRAINAGE EASEMENT UI 0^ CURB & GUTTER PWR——UNDERGROUND POWER LINE 4 E. C ____uG-FIBUNDERGROUND FIBER OPTIC Pp F� �p GAS——UNDERGROUND GAS LINE T —w w—MUNICIPAL WATER LINE O �O _SANITARY SEWER LINE W s s: STORM SEWER LINE ® � 0 FOUND YPC UNLESS NOTED V o CURB CHASE b H ® UNDERGROUND FIBER OPTIC BOX STREET LIGHT - �I 00 ELECTRICAL TRANSFORMER ELECTRIC METER S BROADBAND PEDISTAL " SHEET WATER VALVE p CURB STOP Co•I SEWER MANHOLE TOVVN AND COUNTRY ,¢ FIRE HYDRANT 71PHASE PLAN i PROJECT:18-121 DATE:05-15-19