Loading...
HomeMy WebLinkAboutResolution 3270 Authorize City Manger to sign change order 12, Professional Bldg remodel _n_ . COMMISSION RESOLUTION NO. 3270 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONT ANA, APPROVING Al TERA TION/MODIFICA TION OF CONTRACT WITH WALKER CONSTRUCTION, INC., BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 18th day of May 1998, authorize award of the bid for the renovation of the Professional Building to Walker Construction, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Walker Construction, Inc., as contained in Change Order No. 12, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 2nd day of November 1998. ~~ 4 4# ATTEST: ALF 0 M. STIFF, Mayor Gi6 ~ d;d.~ ROBIN L. SULLIVAN Clerk of the Commission APPROVED AS TO FORM: 10127 II 998 14: 12 4065858337 BAYLISS ARCHITECTS PAGE 02 10/21198 18:0' FAX 1 408 188 3127 W.\LKBR CONSUlTCI IZJ 001 QJ~G~ ORDER - PROJECT: Change Order ##11 BaKem." Proftlliuhal BuilcUna 20 1:. Olive >>...e: 1011419. 8o~an,~~ 5971' Owdu: Contractor; City of Boz,.an Walke, eon.madion Int. . 0 Box 640 2103 Le. A'ftnue, Suite B Boaemao, Mt. 5971! BO....II,Mt. !9715 " Adclitio%1 of suspended ceiling in employee entry .rea. 5500.00 " Additional CCJsts Qfhand railins as per detaU SlJpp\ied after Change Order #4, 350,00 " WaIk,r CQJJ&tn.lction will retain solid core door N/C Sub Total: 5850.00 15% Markup 127.50 1.5% Bond 14.67 1% GRT 9,93 TOTAL FOR CHANGE ORDER. 51001.10 OWNER.: CONTRACTOR: City of Bozeman Walker~~ BY:~ ,- BY: ~JJ-t DATE: November 2. 1998 DATE: (~, /S'~ .--------.--