Loading...
HomeMy WebLinkAboutWASTE WATER MEMO 2021.9.20 MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA 406.586.0277 tdhengineering.com 234 East Babcock Street , St. 3 Bozeman, MT 59715 06/29/2021 Karl Johnson City of Bozeman 20 E. Olive St. Bozeman, MT 59715 RE: MEDICAL EYE SPECIALISTS, WASTEWATER MEMO Mr. Johnson: The following information is provided to summarize the wastewater design capacity for the Medical Eye Specialists (MES) Clinic located in Lot 4 of the Eastlake Professional Center (EPC) Subdivision. The Master Site Plan for the EPC Subdivision estimated a total peak flow based on zone undeveloped land usage for B-2 zoning from the City of Bozeman design standards Table V- 1. The total demand for the subdivision is estimated at 35.7 gpm of which 11.45 gpm is devoted to lot 4 where the MES clinic is proposed. An equivalent population of 0.14 was estimated for the development resulting in a peak factor of 4.21. The following table is referenced from the Master Site Plan draft design guidelines that shows the design flow rates for Lot 4. Table 1 Wastewater Flows PROJECTED WASTEWATER FLOWS The MES building will be staffed with 55 employees and an additional 53 patients are conservatively estimated for operations. The flow rate of 9.6 gal/capita/day is used to project wastewater generated from the development. The estimated rate is an indirect per capita use that was established for hospital facilities in the 2018 Wastewater Facilities master plan for the City of Bozeman. Based on the number of employees at the project use rate, the development will require 1,037 gpd (0.72 gpm). Using the same peak hour factor of 4.21 the peak flow equates to 3.03 gpm. With the addition of 300 gpd of infiltration on the 2.0-acre parcel amounts to a total flow of 3.24 gpm. The projected wastewater use demonstrates that the Eastlake Subdivision has been designed to adequately serve the MES site. Sincerely, ________________ Alex Edwards, PE Civil Engineer Sewer Segment Contributing Area (Acre) Total Flow (gpm) Peaking Factor Infiltration (gpm) Peak Flow (gpm) Required Pipe Dia. (in.) LOT 4 1.93 2.67 4.21 0.20 11.45 8