Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A.014NorthElevation_06152021
LEVEL 01 EL:0" MECH ROOF EL:69' -2" LEVEL 02 EL:15' -6" LEVEL B1 EL: -9' -0" LEVEL 03 EL:26' -6" LEVEL 04 EL:37' -2" LEVEL 05 EL:47' -10" LEVEL 06 EL:58' -6" 2 3 4 5 6 71 TOP OF PARAPET EL:73' -2" 9' - 0 " 15 ' - 6 " 11 ' - 0 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 4' - 0 " 69 ' - 2 " TRANSPARENCY 7' - 4" TRANSPARENCY 20' - 8" 124' - 8" STOREFRONT BLOCK FRONTAGE TRANSPARENCY 20' - 8" 150' MAX LENGTH 23' - 5" 9' - 2" 150' MAX LENGTH 60' - 6" 20' - 8" CANOPY E2 H1 F1 E2 F1 E2 F1 E2 F1 B H1 F1 E2 E2 F2 E2 F2 E2 H1 F1 E2 F1 E2 F1 E2 F1 B H1 F1 E2 A E2 F2 E2 H1 F1 E2 F1 E2 F1 E2 F1 B H1 F1 E2 E2 F2 A E2 H1 F1 E2 F1 E2 F1 E2 F1 B H1 F1 E2 E2 F2 E2 F2 E2 F2 E2 F2 E2 F2 E2 F2 A BBB AF1 H1 H1 H1 BBB AF1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 H1 C1 C1 AA A F2 A F2 A F2 F2 F2 F2 F2 F2 F2 E1 E1 E1 SECTIONAL OVER -HEAD GARAGE DOOR WITH GLAZING WALL -MOUNTED LIGHT FIXTURE UTILITY SCREEN BOLLARD GUARDRAIL PARKING ENTRY 21.9% OF W VILLARD ST FRONTAGE 27' - 4" REFER TO MASTER PLAN APPLICATION #20158 FOR PARKING ENTRY DISCUSSION 32' - 0" 20' - 8" CANOPY 27' - 4" CANOPY 21' - 0" GLAZING H2 A. MODULAR BRICK C1. FIBER CEMENT - DARK C2. FIBER CEMENT - LIGHT D1. CORRUGATE METAL - DARK D2. CORRUGATED METAL - LIGHT STONE BASE B. GLASS FIBER REINFORCED CONCRETE F1. ALUMINUM ACCENT - DARK F2. ALUMINUM ACCENT - LIGHT G. FIBERGLASS DOOR E1. STOREFRONT GLASS E2. RESIDENTIAL GLASS E3. RESIDENTIAL SPANDREL GLASS H1. MESH - DARK H2. MESH - LIGHT EXTERIAL MATERIAL LEGEND Drawn By: Checked By: Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz NORTH ELEVATION 301 N. WILLSON AVENUE BOZEMAN, MT 59715 NORTH CENTRAL BLOCK 4 A.014 Author Checker 2020037.000 SCALE: 1" = 10'-0" 1 NORTH ELEVATION TRANSPARENCY PROVIDED 55.9% 522.5 TRANSPARENCY REQUIRED (40%) 50% 467.5 AREA (SQ FT) 935.0 FRONTAGE DESIGNATION MIXED FRONTAGE BLOCK FRONTAGE STANDARDS TRANSPARENCY TABLE 38.510.030.A AREA OF TRANSPARENCY CALCULATIONS NO. DATE DESCRIPTION A 2021.04.13 SITE PLAN REVIEW B 2021.06.15 RC 1 SITE PLAN REVIEW