Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A.013WestElevation_06152021
LEVEL 01 EL:0" MECH ROOF EL:69' -2" LEVEL 02 EL:15' -6" LEVEL B1 EL: -9' -0" LEVEL 03 EL:26' -6" LEVEL 04 EL:37' -2" LEVEL 05 EL:47' -10" LEVEL 06 EL:58' -6" A B C F H J K L M N P LEVEL 01M EL:12' -10" D OGE TOP OF PARAPET EL:73' -2" 9' - 0 " 12 ' - 1 0 " 2' - 8 " 11 ' - 0 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 4' - 0 " 69 ' - 2 " LINE OF BASEMENT STRUCTURE E2 H1 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 C1 E2 H1 F2 AC2 C2 C2 C2 C2 C1 A E2 C1 E2 C1 E2 C1 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 H1 H1 E2 E2 C1 C1 E2 E2 C1 F2 E2 E2 H1 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 H1 F2 E2 C1 E2 C1 E2 C1 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 H1 H1 E2 E2 C1 C2 E2 E2 C1 F2 E2 E2 H1 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 H1 F2 E2 C1 E2 C1 E2 C1 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 H2 H1 E2 E2 C1 C2 E2 E2 C1 F2 E2 E2 H1 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 E2 H1 F2 E2 C1 E2 C1 E2 C1 E2 C2 E2 C2 E2 C2 E2 C2 E2 C2 H2 E2 E2 C1 C2 E2 E2 C1 F2 E2 E2 H1 H1 H1 H1 H1 H1 A F1 A C1 D D D D D D A LOUVER F1 UTILITY SCREEN BOLLARD D HIGH -FREQUENCY OVERHEAD GARAGE DOOR C1 F2 9' - 4 " LESS THAN 10'-0" HEIGHT COMPLIES WITH BLANK WALL 10' - 10" 12' - 7" LESS THAN 15'-0" WIDTH COMPLIES WITH BLANK WALL BLANK WALL TREATEMENT: SPECIAL BUILDING DETAILING OF BATTENS AT INTERVALS TO ADD VISUAL INTEREST AT A PEDESTRIAN SCALE. THE BATTENS CREATE RELIEF AND TEXTURE ACROSS THE FACADE. 9' - 4 " H2 H2 H2 F1 OUTLINE OF METERS AND EQUIPMENT UTILITY SCREEN A. MODULAR BRICK C1. FIBER CEMENT - DARK C2. FIBER CEMENT - LIGHT D1. CORRUGATE METAL - DARK D2. CORRUGATED METAL - LIGHT STONE BASE B. GLASS FIBER REINFORCED CONCRETE F1. ALUMINUM ACCENT - DARK F2. ALUMINUM ACCENT - LIGHT G. FIBERGLASS DOOR E1. STOREFRONT GLASS E2. RESIDENTIAL GLASS E3. RESIDENTIAL SPANDREL GLASS H1. MESH - DARK H2. MESH - LIGHT EXTERIAL MATERIAL LEGEND Drawn By: Checked By: Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz WEST ELEVATION 301 N. WILLSON AVENUE BOZEMAN, MT 59715 NORTH CENTRAL BLOCK 4 A.013 Author Checker 2020037.000 SCALE: 1" = 10'-0" 1 WEST ELEVATION NO. DATE DESCRIPTION A 2021.04.13 SITE PLAN REVIEW B 2021.06.15 RC 1 SITE PLAN REVIEW