HomeMy WebLinkAboutResolution 3273 Authorize City Manger to sign C.O. 14, Professional Building remodel
COMMISSION RESOLUTION NO. 3273
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH WALKER CONSTRUCTION, INC., BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 18th day of May 1998, authorize award
of the bid for the renovation of the Professional Building to Walker Construction, Inc.,
Bozeman, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and Walker Construction, Inc., as
contained in Change Order No. 14, attached hereto, be and the same are hereby approved;
and the City Manager is hereby authorized and directed to execute the contract change
orders for and on behalf of the City; and the Clerk of the Commission is authorized and
directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 7th day of December 1998.
~~4~ ~ /f/'
ALFR . ST FF, Mayor
ATTEST:
(j}~ J ~
ROBIN L. SULLIVAN
Clerk of the Commission
APPROVED AS TO FORM:
--- --------
----.--
1111':>1 l.;J:JQ 11;4J I.j.t-'U:....JO.J..:::.I~..;; "
Wt~I~~~~ Hj..'.~jj~I~'~'~
lJ.ILCl/II~ OY:;l6 FAX 1 .06 $88 ae27
WALKER CONSTRUCT r-MI~L.:..
'-'''-
..
~OOl
CHANGE ORDE]!
PROJECT:
Change Onter ;#14
Bozt'1laa Professional Bui\disl
10 E. 01"-,.
Date: 11/17/98
Bouman, Mt. 5971!
Owner.
Contnc:tDr:
City of BozeJllan
Walker CODJ1ruction Int.
, 0 80-': 640
2203 LeA A vtdUe, Suitt B
B~aft,~L !971!
BOlemu, Mt. !i9'715
. Add sprinkler bad in front of 5I;fVer room (not on plans).
. Cat) (1) sprinkler bu.d in buement due to rem.oval of stub wall (not on plans).
T ata1 on above
work $312 76
. (2) tight fixtures to office 143 (Crais B. office).
. P.emov" sections of su:lpcnded ceiling &. replace sorne grid
. Add conduit &. J box: for (2) tights
. CeiUni area is fun ofPVC pipe trom upstair; office
Total on above
work $500_00
. Paint 4' walls in office #143 k '132 (As per arcl1itectl requeit)-
Total on above
work S250.oo
. Replac:c carpet in elevator.
Total on above
work S70.0Q
Sub-Total
$1132.76
15% Mar)qap
169,92
L 5% Bond
19.54
1% ORT
l~,~
Totu for Chaoae
Order: St,33!.4S
OWNER: CONTRACTOR:
City of Bozeman WoJker construct~
BY, - ~~l
,~ BY: s:dti
DATE: \Z-\I~~ - DATE: ~'/2'e.
-
---.----- _.---_._--
. ..-.-...--- .. - .------.---