Loading...
HomeMy WebLinkAboutC5.0ConstructionSiteManagementPlan_0810202111 12 G S W Drawn By: Checked By: Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz CONSTRUCTION SITE MANAGEMENT PLAN 311 N. WILLSON AVENUE BOZEMAN, MT 59715 THE IVES C5.0 Author Checker 2020037.000 SCALE: 1" = 20'-0" 1 SITE PLAN NO. DATE DESCRIPTION A 2021.04.13 SITE PLAN REVIEW B 2021.06.15 RC 1 SITE PLAN REVIEW C 2021.08.10 RC 2 SITE PLAN REVIEW TRACK OUTPAD / GRAVELENTRANCE TRACK OUTPAD / GRAVELENTRANCE 1 PrivateResidence- 109 W. Villard Access to residence not to be impacted. 20 ' - 0 " 20 ' - 0 " 20'-0" 20'-0" 19 ' - 5 " EXCAVATIONHAULROUTE Oct 2021 toOct 2022 TOWER CRANE Reduce N. Willson 2 Lane Traffic. Reduce Villard to 2 Lane Traffic from Willson to alleyway STOP Close alleyway for excavation / concrete phase. Approx. Oct 2021 to Oct 2023 ~24 Months Relocate Trash Pickup for residences to N Grand Ave. for duration of project. Material Lift Perimeter Site Fence B L O C K 4 ONE 11 2.0 To Peach St. Conservatively, excavation will extend 13' feet from building, encroaching into alleyway. 13 ' - 0 " From 7th Ave. S T O P ST O P Villard reduced to 2 lane traffic for duration of ONE 11 2.0 - August 2021 through April 2023. ~18 Months (Pending August Start) Block 4 deliveries routed here starting October 2022. Villard access to Block 4 utilized as valet parking in basement. Temporary road closures will be required to facilitate delivery offloading. DeliveriesAugust 2022throughOctober 2023 WET Building & ParkingLot Access to parking lot not to be restricted at any point duringconstruction. AC Marriott Valet access beginning October 2022. Maintain covered vehicular access and emergency egress pedestrian walkway. Site fence reconfigured at red dashed line to parking garage. Basement parking garage access open to Villard. Beginning October 2022. Maintain covered walkway / egress path to sidewalk from basement parking to facilitate AC Marriott Valet parking. Construction Management Plan The Ives SW Intersection of Willson & Villard N.T.S. *All dates noted are subject to Oct 2021 project start date. From 7th Ave.