Loading...
HomeMy WebLinkAboutC1.2.1CivilPhasingPlan_08102021114 E100A ELEVATOR LOBBY 101 MAIL ROOM 102 PACKAGE ROOM 103 FITNESS CENTER 104 PET WASH 109 NORTH RETAIL113STAIR 2ST-102 OFFICE 105 BOH CORRIDOR 110 RESIDENTIAL LOBBY 100 STAIR 1 ST-101 TRASH TERMINATION 111 MECHANICAL ROOM 112 PUBLIC BICYCLEROOM114 SOUTH RETAIL 115 YOGA ROOM 104A JAN 109A IT/STORAGE 107 BIKE/SKI WORKSHOP 116 114E105 113 110 109 109A 103 107 ST-001C E101 116 E106 111 ST-001 E100 E100C E100B E104 105 104A 104 115 106 W/C 106 108 ST-002C A4.11 1 A4.11 2 A4.11 3 A4.12 1 A4.122A4.131A4.132A4.133 A4.14 1 A4.14 2 A4.15 1 A4.15 2 A4.15 3 114 E100A ELEVATOR LOBBY 101 MAIL ROOM 102 PACKAGE ROOM 103 FITNESS CENTER 104 PET WASH 109 NORTH RETAIL113STAIR 2ST-102 OFFICE 105 BOH CORRIDOR 110 RESIDENTIAL LOBBY 100 STAIR 1 ST-101 TRASH TERMINATION 111 MECHANICAL ROOM 112 PUBLIC BICYCLEROOM114 SOUTH RETAIL 115 YOGA ROOM 104A JAN 109A IT/STORAGE 107 BIKE/SKI WORKSHOP 116 114E105 113 110 109 109A 103 107 ST-001C E101 116 E106 111 ST-001 E100 E100C E100B E104 105 104A 104 115 106 W/C 106 108 ST-002C A4.11 1 A4.11 2 A4.11 3 A4.12 1 A4.122A4.131A4.132A4.133 A4.14 1 A4.14 2 A4.15 1 A4.15 2 A4.15 3 THE IVES (BUILDING 4) SITE IMPROVEMENT PHASING: PHASE 1 (PRIOR TO BASEMENT PARKING) 1.NORTHWESTERN ENERGY TO INSTALL UTILITIES IN ALLEY. 2.INSTALL OFF-SITE STORM DRAIN PIPES. 3.RECONSTRUCT VILLARD STREET. 4.INSTALL FIRE AND WATER SERVICES. 5.INSTALL NEW FIRE HYDRANT. 6.INSTALL SEWER SERVICE. 7.EXISTING STREETLIGHT AT CORNER OF WILLSON AND VILLARD TO REMAIN. 8.PROVIDE EGRESS PROTECTION CANOPIES AT VILLARD PARKING ENTRANCE AND SOUTHEAST STAIR ENTRY. PHASE 2 (FULL BUILDING COMPLETION) 1.COMPLETE WILLSON AND ALLEY IMPROVEMENTS. 2.COMPLETE SIDEWALK AND STREET LIGHTING. 3.COMPLETE SITE LANDSCAPING. PHASE 2 SITEIMPROVEMENTS (HATCHED) P R O F E S S I O N A L E N G I N E E R S & S U R V E Y O R S THE IVES (AKA BLOCK 4) NORTH CENTRAL MASTER SITE PLAN S T A H L Y E N G I N E E R I N G & A S S O C I A T E S BLOCK 4 INVESTORS LLC BOZEMAN, MONTANA C 1 . 2 . 1 C I V I L P H A S I N G P L A N NEW SHEETTO COMMUNICATECIVIL SITECONSTRUCTIONPHASING