Loading...
HomeMy WebLinkAboutA.015SouthElevation_08102010A. MODULAR BRICK C1. FIBER CEMENT - DARK C2. FIBER CEMENT - LIGHT D1. CORRUGATE METAL - DARK D2. CORRUGATED METAL - LIGHT STONE BASE B. GLASS FIBER REINFORCED CONCRETE F1. ALUMINUM ACCENT - DARK F2. ALUMINUM ACCENT - LIGHT G. FIBERGLASS DOOR E1. STOREFRONT GLASS E2. RESIDENTIAL GLASS E3. RESIDENTIAL SPANDREL GLASS H1. MESH - DARK H2. MESH - LIGHT EXTERIAL MATERIAL LEGEND LEVEL 01 EL:0" MECH ROOF EL:69' -2" LEVEL 02 EL:15' -6" LEVEL B1 EL:-9' -0" LEVEL 03 EL:26' -6" LEVEL 04 EL:37' -2" LEVEL 05 EL:47' -10" LEVEL 06 EL:58' -6" 234567 LEVEL 01M EL:12' -10" 1 TOP OF PARAPET EL:73' -2" 4' - 0 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 10 ' - 8 " 11 ' - 0 " 15 ' - 6 " 9' - 0 " 69 ' - 2 " LINE OF BASEMENT STRUCTURE E2F2B H1 F2 E2F2B H1 F2 E2F2B H1 F2 E2F2B H1 F2 AC2A E2F2 H1 E2 H1 C1 E2 H1 C1 E2 H1 C1E2C1 H1 E2F2 E2 H1 C1 E2 H1 C1 E2 H1 C1E2C1 H1 E2F2 E2 H1 C1 E2 H1 C1 E2 H1 C1E2C1 H1 E2F2 E2C1 E2C1 E2C1E2C1 H1 C1 C1 C1 C1 C1 A C1 D A F1 A A F1 PORTIONS OF SOUTH WALL MAY BE VISIBLE FROM N WILLSON AVE. TO COMPLY WITH BLANK WALL TREATEMENT JUNIPER SHRUBS WILL BE PLANTED IN A 5'2" WIDE PLANTING BED. SEE FLOOR PLAN. F1 16' - 10"89' - 0 3/8"12' - 2 3/4" C Drawn By:Checked By: Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz SOUTH ELEVATION 311 N. WILLSON AVENUE BOZEMAN, MT 59715 THE IVES (BLOCK 4) A.015 Author Checker 2020037.000 NO. DATE DESCRIPTION A 2021.04.13 SITE PLAN REVIEW B 2021.06.15 RC 1 SITE PLAN REVIEW C 2021.08.10 RC 2 SITE PLAN REVIEW SCALE:1" = 10'-0" 1 SOUTH ELEVATION