HomeMy WebLinkAbout34_ACHotelOff-SiteParkingPlan_101820213
MSP | NORTH CENTRAL
PROJECT DESIGN
AC HOTEL OFF-SITE PARKING PLAN
AC
HOTEL
THE HENRY
PHASE 1: Existing Conditions: Currently, the AC Hotel has an off-site parking agreement with
Block 4 to accommodate the required 80 parking spaces. In addition, the Medical Arts building
is about 67% occupied and has adequate parking on site.
PHASE 2: The proposed demolition of the Mountain View Care Center (DEM+CCOA App
no. 21-311), issuance of the Special Temporary Use Permit (STUP App no. 21-325) and the
construction of a temporary parking lot for 80 spaces will accommodate the off-site parking
requirements for the AC Hotel. The Mountain View East temporary parking lot meets all City of
Bozeman requirements according to the plan submitted in the STUP Application.
Prior to building permit issuance for The Henry (Site Plan App no. 21-231), the Mountain View
East temp parking lot construction will need to be complete and operating as a shared parking
use. See the Parking and Mobility Plan included in the Design Guidelines of this MSP application
for a breakdown of these parking requirements and how they are fulfilled through a shared use
analysis.
PHASE 3: Once The Ives (Site Plan App no. 21-165) building construction is completed, the AC
Hotel off-site parking will return to this site housed in the new structured parking garage.
205 N Tracy Ave| Mountain View East
Mountain View Care Center DEM + CCOA Application - Application No. 21-311
STUP Application, Special Temporary Use Permit - Application No. 21-325
Utilizing a shared use agreement, the temporary parking lot will include 80 spaces to
accommodate the required off-site parking for the AC Hotel and the Medical Arts parking
replacing the spaces displaced following the start of construction at The Henry. The
temporary parking lot will remain until The Ives (Block 4) is completed and until such time
that occupancy within Medical Arts no longer requires these off-site spaces.
AC Hotel
Site Plan Application No. 19-078
Required parking spaces to be housed off-site = 80 spaces
The Henry | Building 3-4
Site Plan Application No. 21-231
Required parking spaces displaced at the start of The Henry’s construction
to be housed off-site at the Mountain View East temporary parking lot
The Ives | Block 4
Site Plan Application No. 21165
The Ives’ structured parking garage will serve
as the future, long-term off-site parking location
for the AC Hotel following the completion of
construction.
THE IVES
PHASED OFF-SITE PARKING PLAN
RC 3 SUBMITTALRC 3 SUBMITTALTHE IVES (BLOCK 4) | 311 N WILLSON AVE
AC HOTEL OFF-SITE PARKING PLAN THE IVES