HomeMy WebLinkAbout21- Waiver of Right to Protest SID - Fallon Condominium Site Plan Return to:
Bozeman City Clerk
P.O.Box 1231 r1rABozeman,MT 59771-1231 -
2755412
Page: 1 of 3 10/20/2021 01:32:48 PM Fee: $24.00
Eric Semerad — Gallatin County, MT MISC
I IIIIIII IIIIII III IIII IIIIIII IIIIII IIII IIII IIIII IIIII IIIII IIIIIII III IIIII IIII IIII
WAIVER OF RIGHT TO PROTEST
CREATION OF SPECIAL IMPROVEMENT DISTRICTS
FALLON CONDOMINIUM SITE PLAN APPLICATION(C.O.B.No.21175)
I, the undersigned Owner of the real property situated in the County of Gallatin, State of
Montana,and more particularly described as follows:
Lot 1A, Block 14, NORTON EAST RANCH SUBDIVISION, PHASE 4, City of
Bozeman, according to the plat thereof, on file and of record in the office of the
Clerk and Recorder, Gallatin County, Montana, and located in the South 1/2 of
Section 9,Township 2 South,Range 5 East of P.M.M.,Gallatin County,Montana
IN CONSIDERATION of receiving site plan approval of the subject property from the
City of Bozeman along with accompanying rights and privileges and for other valuable
consideration,the receipt of which is hereby acknowledged,and in recognition of the impacts to
City transportation and infrastructure systems that will be generated by the development of the
above-described property,do hereby for ourselves,our heirs,personal representatives,successors
and assigns,waive the right to protest the creation of one or more Special Improvement Districts
(SID's) for design and engineering, construction and maintenance of the following
improvements:
a.Street improvements to Pond Lilly Drive from Babcock Street to Huffine Lane
including lighting,signalization,paving,curb/gutter,sidewalk,and storm drainage.
b.Street improvements to S Laurel Parkway from Durston Road to Huffine Lane
including lighting,signalization,paving,curb/gutter,sidewalk,and storm drainage.
c.Street improvements to Water Lily Drive from Babcock Street to Huffine Lane
including lighting,signalization,paving,curb/gutter,sidewalk,and storm drainage.
d.Street improvements to Babcock Street from Laurel Parkway to Cottonwood Road
including lighting,signalization,paving,curb/gutter,sidewalk,and storm drainage
e.Street improvements to Cottonwood Road from Durston Road to Huffine Lane
including lighting,signalization,paving,curb/gutter,sidewalk,and storm drainage.
By:K711,reer,Member
STATE OF CV— &z,— )
:ss
COUNTY OF T)e5cLJ,e-L)
This instrument was signed or acknowledged before me on this I Lf+�day of y-
2021 by Kevin Spencer as Member of Norton Properties, LLC, an Oregon Limited Liability
Company.
l
OFFICIAL STAMP
Notary Public for State of ,n� ., i TINA KAY OAKLEY
NOTARY PUBLIC-OREGON
Printed Name: �tr._ COMMISSION NO.992440
Residing at 2-1%( 6 U l , j O 0—
MYCOMMISSION EXPIRES OCTOBER 7.2023
My Commission Expires: 0 202
G:\C&H\20\200860\Easements\200860-Waiver Of SiDS.Doc