HomeMy WebLinkAboutPhasingPlan_101520213 MSP | NORTH CENTRAL PROJECT DESIGN The existing conditions, or Phase 0, is indicated in the plan above. Each design phase, Phases 1-4 are broken down in the following intent narrative and diagrams to better communicate how the application proposes the phased construction and execution of the development proposed at North Central leading up to Final Build out and the completion of Phase 4. The existing structures on the current site, Phase 0, are beyond, or moving beyond their useful life. Demolition of these buildings will be phased to meet in order to satisfy the development program, and the City of Bozeman standards. The demolition of these structures is included in the description of each phase on the following pages. The applicant and design team recognize that all demolition requests will need to be completed in compliance with Sec. 39.340.080-090 Review of demolition or movement of historic structures or Sec. 38.340.100 Demolition or movement of a non-historic structure or site in the NCOD - depending on the historic status of each structure. Additionally, the applicant will comply with all Certificate of Appropriateness (COA) Application standards as required by the City of Bozeman to formally request the demolition of each existing structure to communicate subsequent development intent, prior to the phased plan for new construction. PHASING PLAN PHASED DEMOLITION INTENT PHASE 0 | EXISTING CONDITIONS ONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E ONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E 3 MSP | NORTH CENTRAL PROJECT DESIGN It is anticipated the entire master plan build- out may take 5-7 years, depending on market conditions, and will take place in phases. Based on current projections, we expect the master plan to unfold in the following phasing order. This phasing plan is conceptual and phases could be combined or re-ordered. The only major phasing constraints are the need to replace/ expand existing parking in the initial phase, and the desire to maintain the existing Tower Building for some time. All other sequences could be re-ordered. All phases would include the construction of the associated infrastructure and open space necessary for the operation and code conformance of each building. The initial phases would also include integration with the existing site uses. PHASING PLAN PHASING INTENT PHASE 1 PHASE 2 PHASE 3 PHASE 4 BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 BUILDING 4 BUILDING 3-5 ONE 11 2.0 BUILDING MOUNTAIN VIEWWEST BUILDING ONE 11 (EXISTING) MOUNTAIN VIEWEAST BUILDING THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E BLOCK 3, LOT 1A BLOCK 3, LOT 2A BLOCK 3, LOT 3A BLOCK 3, LOT 4A BLOCK A, LOT 2A BLOCK A, LOT 3A BLOCK 3, LOT 5A BLOCK 4, LOT 1A BLOCK B, LOT A1 (PROPOSED AGGREGATION) PHASE 1 BLOCK 4 LOT 1A32,645 sf WEST BEALL STREET NO R T H T R A C Y A V E WEST VILLARD STREET NO R T H W I L L S O N A V E 14 ' A L L E Y WEST LAMME STREET NO R T H G R A N D A V E THE IVES (BUILDING 4) ONE 11 2.0 BUILDING NO R T H T R A C Y A V E WEST BEALL STREET NO R T H W I L L S O N A V E WEST VILLARD STREET ONE 11 (EXISTING) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) TEMPORARY PARKING LOTFOR AC HOTEL ANDMEDICAL ARTS BUILDING PROFESSIONALENGINEERS &SURVEYORS NO R T H C E N T R A L MA S T E R S I T E P L A N STAHLYENGINEERING& ASSOCIATES WH I BO Z E M A N , M O N T A N A C1.1 PHASE 1CIVILSITE PLAN PHASE 1 DESCRIPTION ONE 11 2.0 BUILDING · · · · · · · BLOCK 4 BUILDING · · · · · · · · · · TEMPORARY PARKING · · · BLOCK 4 LOT 1A32,645 sf BLOCK 3LOT 1A24,440 sf WEST BEALL STREET NO R T H T R A C Y A V E WEST VILLARD STREET NO R T H W I L L S O N A V E 14 ' A L L E Y WEST LAMME STREET NO R T H G R A N D A V E THE IVES (BUILDING 4) BLOCK A, LOT 2A 19,397 sf BLOCK A, LOT 3A28,071 sf ONE 11 2.0 BUILDING NO R T H T R A C Y A V E WEST BEALL STREET NO R T H W I L L S O N A V E WEST VILLARD STREET ONE 11 (EXISTING) MOUNTAIN VIEW EAST BUILDING WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) PROFESSIONALENGINEERS &SURVEYORS NO R T H C E N T R A L MA S T E R S I T E P L A N STAHLYENGINEERING & ASSOCIATES WH I BO Z E M A N , M O N T A N A C1.2 PHASE 2CIVILSITE PLAN PHASE 2 DESCRIPTION BUILDING 3-4 · · · · · · · MOUNTAIN VIEW EAST BUILDING · · · · · · · · BLOCK 4 LOT 1A32,645 sf BLOCK 3LOT 4A11,812 sf BLOCK 3LOT 3A16,467 sf BLOCK 3LOT 2A 18,042 sf BLOCK 3LOT 1A24,440 sf BLOCK 3LOT 5A25,222 sf WEST BEALL STREET NO R T H T R A C Y A V E WEST VILLARD STREET NO R T H W I L L S O N A V E 14 ' A L L E Y WEST LAMME STREET NO R T H G R A N D A V E BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) BLOCK A, LOT 2A 19,397 sf BLOCK A, LOT 3A28,071 sf ONE 11 2.0 BUILDING MOUNTAIN VIEWWEST BUILDING NO R T H T R A C Y A V E WEST BEALL STREET NO R T H W I L L S O N A V E WEST VILLARD STREET ONE 11 (EXISTING) MOUNTAIN VIEW EAST BUILDING WEST LAMME STREET BLOCK B, LOT 1A (PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) PROFESSIONALENGINEERS &SURVEYORS NO R T H C E N T R A L MA S T E R S I T E P L A N STAHLYENGINEERING & ASSOCIATES WH I BO Z E M A N , M O N T A N A C1.3 PHASE 3CIVILSITE PLAN PHASE 3 DESCRIPTION BUILDINGS 3-1, 3-2, AND 3,3 · · · · · · MOUNTAIN VIEW WEST BUILDING · · · · BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 4A 11,812 sf BLOCK 3LOT 3A 16,467 sf BLOCK 3 LOT 2A18,042 sf BLOCK 3LOT 1A 24,440 sf BLOCK 3LOT 5A 25,222 sf WEST BEALL STREET NO R T H T R A C Y A V E WEST VILLARD STREET NO R T H W I L L S O N A V E 14 ' A L L E Y WEST LAMME STREET NO R T H G R A N D A V E BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES (BUILDING 4) BUILDING 3-5 BLOCK A, LOT 2A19,397 sf BLOCK A, LOT 3A 28,071 sf ONE 11 2.0 BUILDING MOUNTAIN VIEW WEST BUILDING NO R T H T R A C Y A V E WEST BEALL STREET NO R T H W I L L S O N A V E WEST VILLARD STREET ONE 11 (EXISTING) MOUNTAIN VIEWEAST BUILDING WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) PROFESSIONALENGINEERS &SURVEYORS NO R T H C E N T R A L MA S T E R S I T E P L A N STAHLYENGINEERING& ASSOCIATES WH I BO Z E M A N , M O N T A N A C1.4 PHASE 4 CIVIL SITE PLAN PHASE 4 DESCRIPTION BUILDING 3-5 · · · · PHASE 1 PHASE 4 PHASE 3 PHASE 3 PHASE 2 PHASE 3 PHASE 3 PHASE 2 3 MSP | NORTH CENTRAL PROJECT DESIGN BUILDING 4 ONE 11 2.0 BUILDING ONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E PHASING PLAN PHASE 1 | EXISTING NEW NORTH CENTRAL - PREVIOUSLY CONSTRUCTED BUILDING DEMOLISHED DURING PHASE PHASE 2 | PHASE 3 | PHASE 4 | BUILDING 4 ONE 11 2.0 BUILDING ONE 11 (EXISTING) MOUNTAIN VIEWEAST BUILDING THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 BUILDING 4 ONE 11 2.0 BUILDING MOUNTAIN VIEWWEST BUILDING ONE 11 (EXISTING) MOUNTAIN VIEWEAST BUILDING THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 BUILDING 4 BUILDING 3-5 ONE 11 2.0 BUILDING MOUNTAIN VIEWWEST BUILDING ONE 11 (EXISTING) MOUNTAIN VIEWEAST BUILDING THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TR A C Y A V E N U E GR A N D A V E N U E WI L L S O N A V E N U E BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 1A11,812 sf BLOCK 3LOT 2A15,987 sf BLOCK 3LOT 3A17,721 sf BLOCK 3LOT 4A25,242 sf BLOCK 3LOT 5A25,221 sf WEST BEALL STREET NO R T H T R A C Y A V E WEST VILLARD STREET NO R T H W I L L S O N A V E 14' A L L E Y WEST LAMME STREET NO R T H G R A N D A V E BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 BUILDING 4 BUILDING 3-4BUILDING 3-5 BLOCK B, LOT A-1(PROPOSED AGGREGATION)41,233 sf BLOCK A, LOT 2A19,443 sf BLOCK A, LOT 3A28,026 sf ONE 11 2.0 BUILDING MOUNTAIN VIEWEAST BUILDINGMOUNTAIN VIEWWEST BUILDING NO R T H T R A C Y A V E WEST BEALL STREET NO R T H W I L L S O N A V E WEST VILLARD STREET PROFESSIONALENGINEERS &SURVEYORS NO R T H C E N T R A L MA S T E R S I T E P L A N STAHLYENGINEERING& ASSOCIATES WH I BO Z E M A N , M O N T A N A C1.1.4 PHASE 4CIVILSITE PLAN