Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A315Details_09022021
MWP FASTENED TO 2" POSTS, SPACING AS REQUIRED BY MWP MANUFACTURERLOCKING STEEL SWING GATE. SEE SWING GATE DETAIL.NOTE: 1. SEE CIVIL AND LANDSCAPE FOR LOCATION OF TRASH ENCLOSURE.2. SEE ENLARGED PLAN FOR EQUIPMENT ENCLOSURE.12-'-0" AT TRASH ENCLOSURE20'-0" AT TRASH ENCLOSURE8' GATE WIDTHPIPE BOLLARDS, SEE CIVIL, SPACE 3' MAX O.C.7'-0" AT TRASH ENCLOSUREPREFINISHED METAL FLASHING WITH DRIP EDGES, SLOPED AWAY FROM ENCLOSURE2" GALVANIZED POSTS HOLD MWP ABOVE GRADE, PROVIDE SHEET METAL FLASHING WITH DRIP EDGEFINISHED GRADEMP1W3R2SEE PLUMBINGSTANDING SEAM LINES BEYONDEAVE TRIM AND GUTTER, MATCH ROOF COLORSECOND FLOOR110'-0"W2CONCRETE OVER STEEL DECK, SEE STRUCTURALFLOOR STRUCTURE, SEE STRUCTURALCEILING ASSEMBLY, SEE RCPFLOOR PER FINISH PLANFIRST FLOOR100'-0"W2HOLD WALL MWP ABOVE FINISH GRADE, WITH METAL FLASHING DRIP EDGE8"CONCRETE FACED EXTERIOR INSULATIONSEE CIVIL FOR EXTERIOR FINISH AND SLOPESWALL FINISH, WALL BASE, AND FLOORING PER FINISH PLANSTRUCTURAL SLAB AND FOUNDATION, SEE STRUCTURALLAP WEATHER TAPE OVER FLASHINGSTANDING SEAM LINES BEYONDHOLD WALL MWP ABOVE ROOF SLOPE, WITH METAL FLASHING DRIP EDGER2LAP WEATHER TAPE OVER FLASHINGW2W1STANDING SEAM LINES BEYONDSTANDING SEAM LINES BEYONDHOLD WALL MWP ABOVE ROOF SLOPE, WITH METAL FLASHING DRIP EDGEROOF RAKE TRIM, MATCH ROOF COLORR1R1LAP WEATHER TAPE OVER FLASHINGNOTE:1. ALL COMPOONENTS TO BE PRIMED AND PAINTED.2. SEE SPECIFICATION FOR COMPONENTS.3. FOOTING WIDTH TO BE 4X POST WIDTH, MINIUM DEPTH TO BE 36".4. GATE TO BE MANUALLY OPERATED AND LOCKABLE.5. DRILL HOLES FOR DROP CANES IN OPEN AND CLOSED POSITION OF GATE.2" CLEARANCE, TYP2" HINGECLCL2" CLRSEE ENCLOSURE WALL SECTIONFOOTING DEPTH3'-0" MINDROP CANESLATCH12" X 18" X 12" CONCRETE BASE FOR DROP CANE, SEE NOTE 5.CLEARANCE3" LATCH1 1/2" TOP RAIL BEHIND MP4" X 4" X 11 GAUGE POSTGATE UPRIGHT, 1 3/4" X 14 GAUGE, BEHIND MPMP1 TO MATCH ENCLOSURE WALLSWELD ON BOX HINGES1 1/2" BOTTOM RAIL, BEHIND MPSEE ENCLOSURE PLAN FOR ENCLOSURE WALL INFORMATIONCLNOT FOR CONSTRUCTION - PRELIMINARY DESIGNREVISIONS6/9/2021 12:58:22 PMDETAILSA31505-14-2021© 2020 | ALL RIGHTS RESERVED100% CONSTRUCTIONDOCUMENTSDESIGNED BY | DesignerDRAWN BY | AuthorPARCEL DISTRIBUTION FACILITYUPS BOZEMAN, MONTANA | Project# UPS_BOZEMAN | L:\UPS_BOZEMAN\BIMCAD\Revit1 06.09.2021 SITE PLAN 011/2" = 1'-0"A3151TRASH ENCLOSURE - PLAN VIEW1 1/2" = 1'-0"A3152ENCLOSURE - WALL SECTION1 1/2" = 1'-0"A3154EAVE AT FIRE RISER1 1/2" = 1'-0"A3156EXT WALL AT SECOND FLOOR LEVEL1 1/2" = 1'-0"A3157MWP TERMINATION AT FIRE RISER1 1/2" = 1'-0"A3158ROOF TO WALL AT FIRE RISER1 1/2" = 1'-0"A3155ROOF TO WALL TRANSITION1/2" = 1'-0"A3153DOUBLE SWING GATE109-02-2021FINAL SITE PLAN