Loading...
HomeMy WebLinkAboutL500_LANDSCAPE DETAILS 11-04-2020 ............. *NOTE: ALL DECIDUOUS SHRUBS AND TREES Q:• y TO BE FENCED FOR UNGULATE AND OTHER HERBIVORE PROTECTION. PRUNE TREE TO REMOVE TROY DEAD OR DAMAGED LIMBS AND SCHERER BRANCHES 270 r BED EDGING AND *NOTE:ALL DECIDUOUS SHRUBS AND TREES BED EDGING AND TREE STAKES AND TIES MULCH AS SPECIFIED MULCH AS SPECIFIED S�gPE ARG?: TO BE FENCED FOR UNGULATE AND OTHER PRUNE SHRUB TO REMOVE AS SHOWN. STAKES SHALL HERBIVORE PROTECTION. DEAD OR DAMAGED LEAVES BE DRIVEN INTO EXISTING, AND BRANCHES III= UNDISTURBED SOIL AND SHALL NOT PENETRATE THE ROOT BALL. STAKES TO BE TILL NATIVE SOIL TO 12"DEPTH,ADDING -III=III=III=III REMOVED AFTER TWO YEARS ELEVATION OF SHRUB TILL NATIVE SOIL TO 12"DEPTH,ADDING CROWN TO BE 3"ABOVE ORGANIC SOIL AMENDMENT SO AS TO ORGANIC SOIL AMENDMENT SO AS TO FINISHED ELEVATION OF TREE v 7 FINISHED GRADE ELEVATION ACHIEVE MIN.15%ORGANIC CONTENT IN ACHIEVE MIN.15%ORGANIC CONTENT IN CROWN TO BE MIN 3"AND SOIL C y MAX 6"ABOVE FINISHED GRADE TRIANGULAR SPACING X TRIANGULAR SPACING CIRCULAR SWALE TO RING TREE, v v CIRCULAR SWALE TO RING X 4'DIAMETER WITH 3"HIGH vo w v v SHRUB,2'DIAMETER WITH 3" MOUNDED RING OF SOIL v v� HIGH MOUNDED RING OF SOIL 0 v BURLAP TO BE REMOVED v o FROM TOP Y3 OF ROOT BALL. / ALL CONTAINMENT MATERIALS REMOVE WIRE CAGE FOLLOWINGl AROUND ROOTS TO BE REMOVED; I - I= PLANTING -I \\/\ / < III / III= PRIOR TO INSTALLATION Y3 NATIVE SOIL WITH Y3 SANDY LOAM - \\ \\/ Y3 NATIVE SOIL WITH Y3 SANDY -\ / _ X=PLANT SPACING.REFER TO PLANT LEGEND FOR SPACING AND Y3 DEBRIS FREE TOPSOIL _I LOAM AND Y3 DEBRIS FREE X=PLANT SPACING.REFER TO PLANT LEGEND FOR SPACING Y=SPACING BETWEEN ROWS.86%OF X TOPSOIL Y=SPACING BETWEEN ROWS.86%OF X (D-PLANT LOCATION III-III_ EXCAVATE HOLE 2X DIAMETER OF ROOT BALL EXCAVATE HOLE = ATI N20 c r Deciduous Tree Ball and Burlap Planting J 2X DIAMETER OF ROOT BALL Shrub Planting (-3--� Perennial Planting r4_\� >Ornamental Grass Planting U 500 3/8"=1'-0" 500 3/4"=1'4 500 1/2"=1'4° 500 1/2"=1'4" C) .� 2 2 z� cti c E 0) PAVEMENT EDGE-SEE PLANS SOD PER PLAN AND PAVING DETAILS FOR O O SOD OR SEED PER PLAN.SEE SOIL PREP 12 ADDITIONAL INFORMATION.SEE m NOTES ON SHEET L100 1"FACE REVEAL 4"MIN.TOPSOIL.SEE SOIL PREP SEE NOTE 3 3 NOTES ON SHEET L100 ALSO EDGING DETAILS AS APPLICABLE. /6"X 4"NATURAL STEEL 3/6"x 4"NATURAL STEEL EDGING EDGING TAC WELDED TO#4 REBAR DRIVEN MIN.18" SEED PER PLAN 6"DEPTH MINUS WASHED AGGREGATE EGATE 3"MIN.MULCH PER PLAN.V REVEAL AMENDED TOPSOIL FINAL BASE MATERIAL AT EDGING ELEVATION MIN.1"BELOW TOPSOIL,DEPTH VARIES DEPENDENT FINISH GRADE \ \ TOP OF STEEL EDGING.SEE SOIL ON LANDSCAPE TREATMENT.SEE Y2"REVEA %//_///\//\ — — PREP NOTES ON SHEET L100 SOIL PREP NOTES ON SHEET L100 WEED FABRIC PER PLAN — 1"REVEAL-SEE NOTE 2 NOTE: III III_ #4 REBAR,24"OC,MIN.18"DEPTH Z 4"STAPLES,18"OC SPOT WELD ON SITE SLOP 1. SLOPE PLANTED AREAS AWAY FROM PAVED AREAS. —III 2. FINISH GRADES AT PAVEMENT EDGES MUST BE AT A LEVEL SUCH THAT THE -III—III III TO STEEL EDGING ESTABLISHED LANDSCAPE SURFACE WILL BE ONE(1)INCH BELOW TOP OF V PLANTING BED. 18"AMENDED _ III UNCOMPACTED SUBGRADE; PAVEMENT FOR A MINIMUM DISTANCE OF SIX(6)FEET FROM THE EDGE. TOPSOIL.SEE SOIL PREP NOTES PREPARED SUBGRADE.REMOVE 45° —III—III ALL STONES OR OTHER DEBRIS - REMOVE ALL STONES OR OTHER 3. BASE MATERIAL AND COMPACTED SUBGRADE TO BE EXTENDED 2X THE V ON SHEET L100 -� GREATER THAN 1"DIA.AND TILL 1-L- --III- DEBRIS GREATER THAN 1"DIAM. DEPTH OF THE BASE MATERIAL(12") BEYOND THE EDGE OF THE PAVEMENT PREPARED SUBGRADE.REMOVE ALL EXISTING SOIL MIN.4"BEFORE - w_ 4�i�u-iTi-ui- AND TILL EXISTING SOIL MIN.4" SYSTEM.TAPER BASE MATERIAL TOWARD THE COMPACTED SUBGRADE AT A / / / / / / TT, -III—I Q \j/\\ STONES OR OTHER DEBRIS GREATER ADDING TOPSOIL OR AMENDMENTS. BEFORE ADDING TOPSOIL OR 45°ANGLE. THAN 1"DIA.AND TILL EXISTING SOIL AMENDMENTS —III— MIN.4"BEFORE ADDING TOPSOIL OR 90%-95 NOTE: AMENDMENTS. NOTE: COMPACTED -21. CONTRACTOR SHALL PROVIDE A 4"MINIMUM DEPTH OF TOPSOIL ON 1. CONTRACTOR SHALL PROVIDE A 4"MINIMUM DEPTH OF TOPSOIL ON SUBGRADE t ALL LAWN AREAS.TOPSOIL SHALL BE DRUM ROLLED OR ALL LAWN AREAS.TOPSOIL SHALL BE DRUM ROLLED OR _ o TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY. TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY. 0 5 Steel Edging at Turf/Planting Bed Transitions K Steel Edging at Turf/Native Seed Transitions r Planting Bed at Pavement Edge t 500 1.=1.4. 00 1.=1'-0" 500 3/4"=1'0„ N O R U O R t - a 4 10' A 1,_8 SHADE STRUCTURE DETAIL REMOVED N �� N Co 9 2'-10" 7 LOOP ARMRESTS ate Issu � or 2'-5" or 2" POLYSITE SLATS I I I I I I I I I=I I I I I=1 2'-1' -i i i-i i i-i i i-i i i-i a-i i i-i i t 09/25/20 coasri 1'-2" 1'-2" 1'9" A 11/04/20 RC-1 2-5 y1,_2�, r a 1,_8"A- 24"MIN. 2 TO NEAREST OBJECT LANDSCAPE FORMS"GRETCHEN"PICNIC LANDSCAPE FORMS'GRETCHEN" TABLE,ADA ACCESSIBLE MODEL WITH BENCH WITH POLYSITE SLATS AND POLYSITE SLATS.FRAME COLOR TO BE LOOP ARMS.FRAME COLOR TO BE Landscape "GRASS".POLYSITE SLAT COLOR TO BE "GRASS".POLYSITE SLAT COLOR TO ` Details DRIFTWOOD.SURFACE MOUNT BE DRIFTWOOD.SURFACE MOUNT 30"MIN TO NEAREST OBJECT Picnic Table Bench 10 Bike Rack I 500 3/8"=1'0" 500 3/8" 10= ' " 500 1/2"=1'0" ` O 3 m a