Loading...
HomeMy WebLinkAboutE1.0 ELECTRICAL SITE PLAN 1-4-20211222223337333422(TYP)55HFVENTRANCE SIGNSNOW STORAGESNOW STORAGESNOW STORAGESNOW STORAGESNOW STORAGESNOW STORAGE SNOW STORAGE SNOW STORAGESNOW STORAGESNOW STORAGE SNOW STORAGE SNOW STORAGE SNOW STORAGE SS2W1S1S2S2S2S2S2S1S26666666666666666666S2S2S2S2S2S2S2S2S2S2S2S2S2S2S21PC8999999999999999999W1W1W1W1W1W1W1W1W1W1W1W1W1W1W1W1W16GENERAL NOTES1.INSTALLATION SHALL COMPLY WITH WITH THE LATEST LOCAL CODES ANDSTANDARDS.2.COORDINATE ALL UTILITY ROUTING AND METER LOCATIONS WITH N.W.E. PRIORTO ROUGH-IN.3.REFER TO BUILDING PERMIT PACKAGE FOR LIGHTING CIRCUITING & CONTROLINFORMATION.4.REFER TO BUILDING PACKAGE FOR SPECIFICATIONS.5.SIZES OF EQUIPMENT ARE BASED ON BASIS OF DESIGN MANUFACTURER. ECSHALL COORDINATE WITH FINAL APPROVED SHOP DRAWING INFORMATION FORALL EQUIPMENT PRIOR TO ROUGH-IN.SHEET NOTES1.EXISTING N.W.E. (NORTHWESTERN ENERGY) PAD MOUNTED PRIMARY JUNCTIONBOX.2.NEW 1ΙΈ PRIMARY UNDERGROUND SERVICE BY N.W.E.3.PAD MOUNT SERVICE XFMR BY N.W.E. PROVIDE PAD & CONDUIT STUBS INACCORDANCE WITH N.W.E. REQUIREMENTS.4.SECONDARY FEEDER BY N.W.E. BETWEEN XFMR & METER BASE/DISCONNECT.REFER TO BUILDING DRAWING PACKAGE FOR CONTINUATION.5.PROVIDE CONCRETE POLE BASE PER 2/E1.1.6.PROVIDE AND INSTALL COMBINATION METER BASE/DISCONNECT AT THISLOCATION. COORDINATE METER INSTALLATION WITH N.W.E. AND REFER TOBUILDING PACKAGE FOR CONTINUATION INTO UNIT.7.SECONDARY PEDESTAL BY N.W.E.8.CONNECT TO CONEX INTERIOR LIGHTING UPSTREAM OF PHOTOCELL. REFER TOBUILDING PLANS FOR ADDITIONAL INFORMATION.9.CONNECT TO LIGHTING CIRCUIT AT ADJACENT UNIT. SEE BUILDING PLANS FORADDITIONAL INFORMATION.XELECTRICALSITE PLANE1.01ELECTRICAL SITE PLANSCALE: 1"=30'-0"NBozeman, Montanat. 406.551.3669www.beartoothlightingdesign.comINFRASTRUCTURE 12.7.2020REVISIONS2. CORRECTIONS #2 01/04/2021---------DRAWN BY: RoseCHECKED BY: MooreBOZEMAN, MT HOUSING FIRST VILLAGE HRDCPLAN1. CORRECTIONS 01 11/04/2020