HomeMy WebLinkAbout21- Affidavit - 09-28-21 Ntc of Passage of Resolution of Intent to Modify SILD 744 Boulder Creek AFFIDAVIT OF PUBLICATION NOTICE OF PASSAGE OF month; $8.22 per Philips -
RESOLUTION OF MEC Roadway 207--watt co cor-
STATE OF MONTANA, INTENTION TO MODIFY ridor lighting fixture for a total
SPECIAL IMPROVEMENT of$24.64;$6.85 per Cimarron
COUNTY OF GALLATIN
LIGHTING DISTRICT 20-Watt LED fixture for a total
NO.744 of$6.85; or$70.69 per month.
1, Ann Harms, Legal Specialist being first duly sworn, de- (BOULDER CREEK
g p g u y SUBDIVISION PHASES 1-3) All properties in the District
pro-
pose and say that I am theprincipal clerk of the publisher will io assessed for their pro-
p }' p CITY OF BOZEMAN, portionate share of the costs
on an
of the Bozeman Daily Chronicle, a newspaper in general MONTANA area basis of ePrann allytsand will
circulation, Bozeman, Gallatin County, Montana; that I NOTICE IS HEREBY GIV- be payable in equal annual
EN that on September 14, nual installments.The annual
2021, the City Commission costs of the Improvements at
know from my personal knowledge that the Legal# 107471 (the"Commission')of the City the initial Monthly Charge are
of Bozeman, Montana (the $848.28 per year for the entire
NOTICE OF PASSAGE OF RESOLUTION OF I "City"), adopted a Resolution District.The total area of the
of Intention No.5332 to Modify District to be assessed is 14.12
a printed copy of which is hereto annexed,was published in Special Improvement Lighting acres, or 615,157 square feet,
District No.744 (the "District") exclusive of parks and open
the entire issue of said newspaper for: 2 for the purpose of maintaining space.The initial costs of the
lighting and assessing the cost Improvements per acre shall
for maintenance and energy to be $60.18 or $0.001379 per
Boulder Creek Subdivision, square foot annually.
and paying maintenance and
Insertion(s) in the following issues: 09/19/21, 09/26/21 energy costs relating thereto. On an average size lot of
The modification adds one ad- 9,604 square feet the annu-
ditional streetlight on Abigail al estimated cost would be
Lane. $13.24, payable semiannually.
The annual assessments for
A complete copy of the Res- costs of the Improvements
olution of Intention(the"Reso- may be increased as ap-
lution") No.5332 is on file with proved by the Public Service
the City Clerk which more spe- Commission and may be in-
Total Cost: $160.00 cifically describes the nature creased to cover extraordi-
of the costs, the boundaries nary expenses of repair and
and the area included in the maintenance.The first year of
District,the location of the Im- special assessment billing will
provements and other matters include an additional amount
pertaining thereto and further not to exceed$500.00 for pub-
particulars. A list of properties lication and mailing associat-
in the District and the amount ed with creation bf the District
of the initial assessment ac- which shall be assess in the
companies this notice. The same manner as the Improve-
Resolution and accompanying ments resulting in a cost not
exhibits may be also viewed to exceed $95.49 per acre, or
on the City's website at www. $.00219 per square foot.
bozeman.net.
Subscribed and sworn b Ann Harms before me on: On Tuesday, October 5,
�' The district will pay the 2021 at 6:00 p.m., in the
On 28th day of September, in the year of 2021 maintenance and energy Commission Room at City
costs for twelve (12) KIM Hall 121 N Rouse Ave, Boz-
VRBI LED single function, eman, Montana, the City
aluminum shaft with domed Commission will conduct a
top bollard lights in polyester public hearing to hear and
powder coated finish mounted pass upon all written pro-
on 10" concrete foundations tests against the creation
(the "Fixtures") selected for or extension of the District,
pedestrian trails intersecting or the Improvements. Due
public streets; six (6) Spauld- to the City's Declaration of
Avu ing Lighting Cimarron Series Emergency for the Covid-19
LED streetlights mounted on Pandemic,this meeting may
Notary Public for the Si to of Montana Residing at 25'round tapered bronze steel be held online using Webex
Belgrade Montana poles with powder coated or other technology.
g bronze finish (the "Fixtures")
selected for various intersec- Written protests against the
tions; one (1) Cimarron LED creation or extension of the
streetlight mounted on a 25' District and the costs may be
`I`I I ICI I I round tapered bronze steel filed by an agent, person,firm
_�__J � _ Z rD �„ pole with powder coated or corporation owning real
=* �+ bronze finish (the "Fixtures") property within the proposed
LLO �� �? » o.- o,�'c'; my°�a d - selected for the walkway on District whose property is li-
LLzF- C7'- U a; •E c>,o ca p CU o Abigail Lane; two 3 Philips able to be assessed for the
(5wGgU W0 Z `� oft`cam o'�' m a>:E 9 ( ) P
N ZQui w rn w E E w m_o - 5£c v c�o Q dor I lights mountedEC LED on Roadway5'tall delivered corri- costs. uto the protests
Clerk at
cAO00L' NZ oU ° rev �,E.ca�c Cl c green, round, tapered steel City Hall, 121 N Rouse Ave,
Q f-¢CR. a w a ° M Y �, U 2= poles the "Fixtures" select- Bozeman, Montana not later
a a O Q =a� y Ca coCD
- P ( )
000-ZZQO u.0 T cU c ° n o m c 0 E `�•° Laner Oak Street he locations shown day,Ocail than Otober4,021,on Mon
W0E-Q~ ON 02 w°a) f0 ° a oa f° ` rasa on Exhibit A (the "Improve-
r,Wz_x O> U«s Ev Ed�� c6O)z °,
OC H v O m C N -z a ca°' c `u, ments"). The initial monthly Further information regard-
O z a-� m V 84 m°-- .�`-L E'.2 c a>,o a charges per fixture per month ing the proposed District or
Z -m w Zz m . a�`L E�a m c (the "Monthly Charge") are other matters in respect there-
a) o o cA p o.m o m m z estimated as follows: $1.02 of may be obtained from the
- - -_CO- per KIM LED 25-watt bollard City Clerk at City Hall, 121 N
fixture for a total of$12.24 per Rouse Ave, Bozeman, Mon-
month; $4.49 per Spaulding tana or by telephone at (406)
AD#147912 110-watt LED streetlight fix- 582-2320.
ture for a total of $26.96 per -
AD#147912
Dated:September 15,2021
BY ORDER OF THE CITY
COMMISSION
OF THE CITY OF BOZEMAN,
MONTANA
MIKE MAAS
City Clerk
MNAXLP