Loading...
HomeMy WebLinkAboutA4.4ExtElevationsBldgI_08-25-21212212MT-13BCLERESTORY WINDOWMT-1515' - 9"10' - 8"MT-13RMT-13B212212MT-13RCLERESTORY WINDOWTRANSPARENCY CALCULATIONHEIGHT OF TRANSPARENCY:MIN.: 9' - 0"MAX.: 14' - 2"AREATOT. FACADE: 286 SFTRANSPARENCY: 72 SF = 25 % OF TOT. FACADEALLOWABLE : 15% OF TOT. FACADE9' - 0"14' - 2"RAW STEEL RAIN CHAIN, TYP.MT-15MT-13BGARAGE SCONE TYP.OBSCURED GLASS GARAGE DOORMT-6MT-13RMT-13RSLIDING DOORCLERESTORY WINDOWMT-6MAX.88"MT-1515' - 1"16' - 9"MT-13BA9.4.1492' - 0"15' - 0 1/2"CLERESTORY WINDOWMT-6MT-13RMT-15MT-13BMT-13RUTILITY METERELEVATIONS GENERAL NOTES:1. SLOPE ALL GUTTERS TOWARD DOWNSPOUTS, 1" TOTAL.2. EACH FRONT DOOR TO HAVE ADDRESS ILLUMINATED BY FRONT PORCH LIGHT3. WINDOW SILLS @ 3'-0" AFF, UON AND @ 3'-6" AFF IN KITCHEN COUNTERTOP, UON.4. WHEN ADJACENT TO DOOR, ALIGN TOP PF WINDOW WITH TOP OF DOOR.5. SEE DETAIL 12/A9.5.3 FOR DOWNSPOUT DETAIL6. SEE SCHEDULE FOR COLOR ACCENTSSheet Title:DateDrawn ByProject NumberM.B & E.BBYREVISIONSArchitect:STUDIO CO+HAB, LLC914 W Babcock StBOZEMAN, MT 59715651.336.0394erik@studiocohab.com8/25/2021 4:47:52 PMA4.4Exterior elevationsBuilding IBozemanCohousingBozeman Coho, LLC8/25/20211904BOZ3120 Wagonwheel Rd.Bozeman, MT, 59715Formal Site Plan - 3rd SubmittalFormal Site Plan -3rd Submittal1/8" = 1'-0"3Building I - Side (East) Elevation1/8" = 1'-0"4Building I - Side (West) Elevation1/8" = 1'-0"1Building I - Front (South) Elevation1/8" = 1'-0"2Building I - Back (North) ElevationMATERIAL KEYNOTES LEGENDKeynote value Keynote textMT-6 COMP. SHINGLE ROOFINGMT-13B BOARD AND BATTEN. 16" O.C - DARKGREYMT-13R BOARD AND BATTEN. 16" O.C - REDMT-15 CORRUGATED POLYCARBONATE