Loading...
HomeMy WebLinkAboutSitePlanNarrative_03-04-21Site Plan Review - Narrative For Bozeman Cohousing 3120 Wagon Wheel Road March 4, 2020 Table of Contents Project Narrative 1 Access 2 Woonerf Design 3 Parking 3 Recycling and Waste 3 Snow Storage 4 Utilities 4 Landscape 4 Open space 5 Parks 6 Stormwater 6 Lot Aggregation 7 Car Share 7 Departures 8 Apartment Building, Limited 8 Slope to Stormwater Features 8 Project Narrative Project narrative describing the project type, proposed use scope, size (dwellings, building size(s), building height(s), number of buildings, number of total parking spaces) intent, and phasing, if applicable. The project is a 43-dwelling neighborhood conceived using the cohousing model. Cohousing is developed and facilitatively designed with future residents to foster strong community ties and with a focus on sustainability. While there are Page 1 of 8 Site Plan Review - Narrative hundreds of cohousing communities in North America, this will be the first cohousing community in Bozeman. Roughly 70% of the future residents, many citizens of Bozeman, contributed to this site plan design in a series of workshops. Because this neighborhood was facilitatively designed to meet the needs, goals, and aspirations of the future residents, you will notice some innovative/divergent development strategies. Working in communication with Chris Saunders and Lance Lehigh (1/29/20 meeting and emails) and in response to feedback from the City (DRC Comments from two informal reviews), the design team has sought to align these strategies with city needs. The 43 dwellings are to be constructed within 12 buildings. Eight are two-story buildings, each about 4500 square feet and each containing four dwellings in both side-by-side (a.k.a. rowhouse) and stacked flat configurations. One building with three studio-condos located above the garages. And, one apartment limited residential building including eight dwellings and common facilities serving all residences. An additional 500 square foot maker-space is attached to garages. An existing barn will remain while the existing single-family home will be demolished. The future residents of the community, who are funding the development and are instrumental in the design process, are individuals and families that live and work in Bozeman. The proposed neighborhood will provide workforce housing. Many current members of Bozeman Cohousing are making sacrifices to make the required financial commitments. For example, one member family recently sold their home and moved into a smaller apartment, which demonstrates how much we believe in the idea of cohousing. The members include daycare workers, fixed-income retirees, college professors, young adults with special needs, and government employees. Increases to the cost of this project will have significant negative effects on the Bozeman residents creating this project, many of whom would be priced out if project costs escalate. A lot of work and thought has been put into the site plan and it strives to provide for the needs of future residents while respecting the City’s requirements. As current residents of Bozeman, we want to do our fair share while also achieving the goals and aspirations of this neighborhood that is expanding the possibilities for neighborhood sustainability and community vitality. Access Two means of access to the site are provided upon request of Chris Saunders and Lance Lehigh and the subsequent DRC comments. The primary vehicular access aligns with Concord drive. The secondary site access is designed as a woonerf to accommodate intermixed regular pedestrian and bicycle traffic and emergency vehicle access using a combination of concrete and asphalt. Page 2 of 8 Site Plan Review - Narrative Pedestrian and emergency vehicle access extends into the central open space as a greenway and terminates in a Y turn-around to provide emergency vehicle access to all buildings. This strategy provides essential emergency access, while facilitating the clustering of parking, which maximizes open space, increases social cohesion, increases pedestrian safety, and reduces embodied carbon, urban heat island effect, and stormwater runoff. Woonerf Design The woonerf provides pedestrian, bicycle, and emergency access into the site. The design consists of a combination of concrete and asphalt to provide a pedestrian-friendly environment while supporting the needs of emergency vehicles. The utilities run under the woonerf and the woonerf provides access to the utilities in an emergency or for maintenance. East of the parking area, the woonerf transitions to a greenway designed with a combination of concrete and Grasspave2, which accommodates the pedestrian intent and supports emergency vehicle access. We have included language in the CC&R documents describing that the Condominium Owners Association will repair and replace the Grasspave2 product if damaged by the City of Bozeman. We have included the Grasspave2 maintenance documentation that describes the straightforward steps to repair or replace the plastic Grasspave2 product. Snow removal on the Grasspave2 surface is often another concern and we have included the GrassPave2 snow removal guide. Parking A total of 79 parking spaces are provided onsite. Under Table 38.540.050-1 a total of 99 spaces would be required without reductions. The project includes three shared cars reducing the required parking by 15. Lastly, an additional 1750 square feet of landscape area is to be provided between the Wagonwheel right-of-way and the garages that are beside the studio-condos, reducing the parking requirement by 5 spaces, therein reducing the total parking requirement to the number provided onsite. The number of parking spaces provided exceeds the future residents’ needs by over 20% including both their vehicle ownership and guest parking. Recycling and Waste The recycling and trash enclosure is planned to accommodate four 450 gallon totes with side pickup. The group will utilize recycling, reuse, and composting measures in daily activities, reducing the need to haul off refuse. Given these measures and the overall sustainability focus of future residents, large dumpsters Page 3 of 8 Site Plan Review - Narrative are not anticipated to be needed. Furthermore, they are not desired due to the noise created when emptying them. Snow Storage Snow storage is accommodated north of the vehicular entry and parking, north of the main parking area, in the central landscaped area between the isles of parking, in front of the common house, and in the central open space. Utilities City utilities are to be pulled from Wagon Wheel Rd. and brought onto the site underneath the woonerf (secondary access) and continues under the emergency vehicle access. Based on conversations with city staff, mostly through Lance Lehigh, we have adjusted the surfacing over the utilities. Concrete and asphalt will be used on the woonerf on the western side of the site through the parking area. On the eastern side of the site where only pedestrian and emergency vehicles will access, the utilities are covered by a combination of concrete and GrassPave2. The community has included language in the CC&R documents for the condominium owners association maintenance agreements that state the COA will repair and replace the GrassPave2 product in the event it is damaged due to maintenance conducted by the city. Per the DRC comments, the water main is stubbed out to the northern property line for a second future looped connection. Landscape The landscape design of the cohousing community consists of a combination of private, semi-private, common spaces, and native buffers. Community Approach: ​The landscape in the cohousing community plays a vital role in socialization and community building through hands-on gardening and teamwork. In addition to being an enjoyable activity for residents, it is seen as a vital community-building activity. Taking pride in their residences and common spaces, the community intends to work together to install most of the landscape elements themselves. The landscaping is planned to be additionally curated and enhanced over time by the community. Page 4 of 8 Site Plan Review - Narrative Existing Landscaping: ​The existing property has functioned as a small hobby farm for many years. The landscape on the eastern portion of the property extending to the creek and east fence line, features existing livestock paddocks, fencing, and shelters. The paddock areas and slope have been over-grazed and invaded with weeds. The sloped area also boasts various existing large shrubs and tree species. Portions of the riparian area immediately adjacent to the creek bed are delineated wetlands and are indicated on the site survey. There are several existing creek crossings, in the form of rudimentary pedestrian bridges. The western portion of the property features existing hedgerows, manicured lawn, brush-hogged pasture grasses, and a few mature trees. There are two existing wells on site, which are intended to be used for irrigation purposes. Boulevard Treatment: ​The Boulevard along Wagon Wheel Rd. is proposed to be a planted bioswale, featuring drought-tolerant perennials, shrubs, and trees. Stormwater treatments: ​Stormwater runoff will be treated throughout the development via rain gardens and bioswales. Trails: ​A natural fines trail will be installed running north-south, and located west of the northernmost parking area. Native Plantings: ​The majority of the development’s turf areas will feature native grasses, to be maintained in a naturalistic manner. Native and naturalized, drought-tolerant, and deer-resistant plantings will be featured throughout the development. Hardscape: ​The site will feature internal sidewalks connections and various permeable and impervious hardscape features. These features will include a common terrace, atrium plaza, common workspace/flex space plaza, and the secondary access route. Erosion Control: ​Erosion control measures will be implemented during revegetation, particularly on the eastern slope. Irrigation: ​Smart irrigation techniques will be implemented, utilizing drip irrigation wherever possible, minimizing sprinkler usage, and avoiding sprinkler overspray onto hardscapes. Open space Private open space is provided for every ground floor dwelling in the back and front yards and exceeds the required 150 square feet. Upstairs flats are provided with a private balcony exceeding 36 square feet. The remaining open space Page 5 of 8 Site Plan Review - Narrative required for upstairs flats (12 x 75sf = 900sf) is greatly exceeded by the common terrace and central open space. Parks Based on conversations with Addi Jadin and approval by the Parks Board on August 13th, 2020, cash-in-lieu is being provided to meet the parkland requirement of Section 38.420. Stormwater The site is located on a relatively flat terrace adjacent to Mathew Bird Creek. The majority of the site is gently sloped toward the center of the northern property boundary. The eastern quarter of the property is sloped toward Mathew Bird Creek. The hillside adjacent to the stream is steep with 30-40 percent slopes. The site may receive a small amount of offsite drainage from the Woodridge Addition to the south. There are two major existing sub-basins for the site, and most drainage currently flows northward towards the center of the northern property line. The stormwater drainage plan for this project has been developed to exceed stormwater drainage design criteria required by the City of Bozeman Design Standards and Specifications Policy (City Standards), dated March 2004. Minimum design criteria per the design standards included: · Stormwater runoff from the development site shall be limited to the predevelopment runoff rates. Adequate on-site stormwater detention shall be provided for design storm runoff exceeding the pre-development rate. · Stormwater storage and treatment facilities shall be designed to remove pollutants. · Storm sewer facilities shall be designed to handle a 25-year storm event. · The drainage plan shall include, to the greatest extent feasible, low impact development practices that infiltrate, evapotranspire, or capture for reuse the runoff generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable precipitation. The Design Standards reference a modified Rational Method to calculate detention storage for the 10-year, 2-hour storm event and the standard Rational Method to calculate peak runoff of the 25-year storm event. The Bozeman Cohousing design team has elected to implement a stormwater management system that substantially exceeds City of Bozeman minimum design criteria. The overarching project design goal is to fully infiltrate the Page 6 of 8 Site Plan Review - Narrative 100-year, 6-hour storm event. This translates to approximately seventy (70) percent greater rainfall depth (e.g. 0.81 inches vs. 1.35 inches) in which to base stormwater storage and infiltration design in comparison to City Standards. Stormwater conveyance infrastructure is designed based on the 25-year event as calculated using the Rational Method per City Standards. The conveyance design conservatively assumes that the storage and infiltration infrastructures do not attenuate peak flow rates. The proposed design substantially complies or exceeds the City’s objective that “the drainage plan shall include, to the greatest extent feasible, low impact development practices that infiltrate, evapotranspire, or capture for reuse the runoff generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable precipitation.” For project design purposes and to promote infrastructure longevity, the “0.5 inches of rainfall from a 24-hour storm” is used as a metric for pre-treatment in advance of stormwater runoff entering cobble infiltration galleries that serve as the primary feature for infiltrating large storm events. Lot Aggregation The site consists of two tracts. It is our intention to aggregate the two tracts into one lot. Car Share This development is planning to have three car share vehicles to reduce the number of vehicles on the site and thus our parking requirements. This project is atypical in that it is being driven by future homeowners and not a developer. With roughly 70% of the homes already pre-sold we are in a unique position to understand the real needs and desires of future residents. A recent survey of future residents shows that 28% have a strong intent to participate in the car share with another 36% considering participating. We have a team that is working to create this car share and meet the requirements of the City of Bozeman. To date, the team has identified multiple vehicles that will be used for the carshare, has research insurance options, is exploring software for a reservation system, and is developing policies. The community (Bozeman Cohousing) has identified three parking spaces for the car share, which are shown on the site plan. A complete list of the responsibilities is provided in the document entitled “Car Share Responsibilities”. Page 7 of 8 Site Plan Review - Narrative Departures Apartment Building, Limited 38.360.070.A.4.b A length of up to 160' may be granted for the Apartment Building, Limited based on lot size, which exceeds 164,000sf (3.76 acres). 38.360.070.A.4.c The additional building length meets the intent of providing additional design flexibility for this unique cohousing project. Specifically it allows eight homes to access common facilities without exposure to the elements, which is particularly beneficial for elderly residents and residents with limited mobility. The configuration also provides access to this enclosed atrium space for all residents, greatly increasing their access to shared amenities. The proposed design is consistent with the mass and scale of the medium density zoning district. Specifically the proposed design deploys strategies such as broken down massing and varied materials to integrate the character of the apartment building, limited building with adjacent buildings on and off site. Furthermore, the orientation of the lengthened facades of the building face interior to the project and toward the rear of the neighboring property's garage. Slope to Stormwater Features City of Bozeman Engineering Standards require that detention basins have side slopes of 4:1 or flatter. The proposed design provides dispersed stormwater management that largely facilitates storage via subsurface cobble infiltration galleries. Shallow above-grade rain gardens are proposed for supplementary above grade storage with desired side-slopes of 2:1 or flatter. The rain garden features have a maximum physical depth of 3-feet and a maximum design storage depth of approximately 1.6-feet for the 10-year, 6-hour storm event as documented in the Stormwater Drainage Plan. Page 8 of 8