Loading...
HomeMy WebLinkAboutTraffic Letter Rev082321__08232021 LAND SURVEYIN August 8, 2021 City of Bozeman Engineering Dept. Attn: Cody Flammond 20 E. Olive Street P.O. Box 1230 Bozeman, MT 59771-1230 RE: Traffic Estimate & Request for Waiver of Traffic Study Requirement, Oak & Cottonwood Apartments, Lots 4 & 5, Block 5, Flanders Creek Subdivision. Dear Cody, The Oak & Cottonwood Apartments project proposes the construction of 7, 3-story, 12-unit apartment buildings. The structures fit the ITE definition of Multifamily (Mid-Rise) Housing (ITE Land Use Code 221). The 101" Generation ITE Trip Generation Manual recommends a peak hourly trip generation factor of 0.44 trips per dwelling unit and average daily trip (ADT) generation rate of 5.44 trips per dwelling unit in a general urban/suburban setting. This equates to a peak hour trip generation of 37 trips and ADT generation of 457 trips for the 84 dwelling units proposed. The original Traffic Impact Analysis for Flanders Creek Subdivision estimated trip generation based on the existing R-O Zoning Designation assigned to the subject property. Significant development has occurred and regional transportation improvements have been installed since completion of the original TIS. Most notable would be the extension of Oak Street from Ferguson Avenue, widening of Durston Road and Cottonwood Road, completion of a roundabout at the intersection of Oak & Cottonwood and the installation of a traffic signal and turning lanes at the intersection of Durston Road and Cottonwood Road. Surrounding intersections and roadways have been analyzed more recently with a number of private development and City of Bozeman improvement projects. These projects include the Durston & Cottonwood Road Improvements Project, The New Bozeman High School, Northwest Crossing Subdivision, Flanders Mill Subdivision, Traditions Subdivision, Boulder Creek Subdivision, Norton East Ranch Subdivision. Development of the subject property has been contemplated in future traffic projections using assumed development density appropriate for the R-O Zoning designation. Given the size of this project and it's inclusion in recent TIS's contemplating regional traffic improvements we feel it is appropriate to request a waiver from the requirement of a Traffic Impact Analysis for this project. This project represents a minor contribution to the greater regional impacts analyzed and addressed by the larger recent development projects in the area. T: 406.581.4097 MCOTTERMAN@CADDISENG.COM PO BOX 11605,BOZEMAN, MT 59719 WWW.CADDISENG.COM If you need any further information related to this waiver request, please don't hesitate to contact me. Sincerely, "-Orma Ma , .L.S. \caddis\20\20006\traffic lettecdocx