Loading...
HomeMy WebLinkAboutACover_081620211A101SIMVIEW # ON SHEETVIEW SCALEDRAWING REFERENCESECTION VIEWCALL-OUT VIEWELEVATION VIEWVIEW # ON SHEETGO TO SHEETPOSITION REFERENCEPROJECT LEVELPROJECT GRIDACBDA1.1VIEW/SHEET REFERENCEA1.1DISCIPLINEDISCIPLINE SECTIONSHEET TITLEVIEW TITLETAG REFERENCERoom name101150 SF1t101WINDOW TAGWALL TAGSDOOR TAGROOM TAGSPOT ELEVATIONReferenceElevationWB-11iEQUIPMENT TAGFURNISHINGS TAGA1011SIMNameElevation01A10.2SIMDETAIL VIEW1i1i8'- 0"/MATCHLINE1A101MATCHLINEVIEW CON'TVIEW REFERENCE1View Name1/8" = 1'-0"??1iCASEWORK TAGINT. ELEVATION MATL. TAGEXT. ELEVATION MATL. TAGA.F.F.1t24' 0"CEILING TAGARCHITECTURALL'HEUREUX, PAGE, WERNER, PC15 5TH STREET SOUTHGREAT FALLS, MONTANA 59401PHONE:(406) 771 0770PROJECT TEAM:CONTACT: TIMOTHY PETERSON AIASTRUCTURALECLIPSE ENGINEERING113 WEST MAIN, SUITE BMISSOULA, MONTANA 59802PHONE: (406) 721-5733 CONTACT: TROY LEISTIKO, PE, SECIVILWOITH ENGINEERING405 3RD ST. N.W.GREAT FALLS, MONTANA 59404PHONE: (406) 761-1955 CONTACT: KODY SWARTZ, PEROBBY OSOWSKI 1713TIMOTHY M. PETERSONGREAT FALLSMTLICENSEARCHITE C TD S TATEOFMONTANAwww.lpwarchitecture.comPHONE | 406.771.077015 FIFTH ST. SOUTHGREAT FALLS | MT 59401SHEET NUMBER:PROJECTNUMBER:DATE:CHECKED BY:DRAWN BY:THIS DRAWING IS THE PROPERTY OF THE ARCHITECT. IT HAS BEEN PREPARED SPECIFICALLY FOR THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION, OR OWNER WITHOUT WRITTEN CONSENT OF THE ARCHITECT.© 2018 L'HEUREUX, PAGE, WERNER, PCNo.DateSubmittal Schedule Submittal 8/14/2021 12:04:22 PMCVR18-053TMPTMPCOVER SHEETTRADITIONS SUBDIVISIONTOWNHOMES8.8.2021General AbbreviationsAbbr DescriptionOSOI owner supplied & ownerinstalledPLAM plastic laminatePLY plywoodPRE-FIN prefinishedPT paintPVC polyvinyl chlorideQTY quantityRB rubber (vinyl) baseREF referenceREINF reinforce (ing, ed)REV revisionRO rough openingSC solid coreSCH scheduleSCHED schedule (ed)SCW solid core woodSHT sheetSIM similarSPEC specificationsSPEC'D specifiedSQ squareSTD standartSTOR storageSTRUCT structural (dwgs, specs)SV sheet vinylSYS systemT&G tongue & grooveTD trench drainTEL telephoneTO top of...TOW top of wallTYP typicalUNFIN unfinishedUNO unless noted otherwiseVB vapor barrierVCT vinyl composite tileVER verifyVERT verticalVIF verify in fieldW/ withW/D washer & dryerW/O withoutWB wood baseWC water closetWD woodWH water heaterGeneral AbbreviationsAbbr DescriptionFEC fire extinguisher cabinetFIN finish (ed, ing)FLR floorFO face of...FOC face of concreteFOS face of studFP fire proofFR fire ratedFRP fiberglass reinforced plasticFTG footingFUR furred (ing)GA gage, gaugeGC general contractorGWB gypsum wall boardHC hollow coreHM hollow metalHOR horizontalHT heightHTG heatingHVAC heating/ventilation/airconditioningID inside diameterINCL includedINSUL insulationINT interiorINTRVW interviewJT jointLAV lavitoryMAT'L material (s)MAX maximumMBR memberMECH mechanical (dwgs, specs)MFR manufacturerMIN minimumMISC miscellaneousMTL metalNIC not in contractNOM nominalNTS not to scaleO/ overOC on-centerOPNG openingOPP oppositeOS outside diameterOSCI owner supplied & contractorinstalledGeneral AbbreviationsAbbr Description(E) existing(N) newAB anchor boltABI alternate bid itemAC acousticalACCESS accessibleACT acoustical ceiling tilesADJ adjustableALT alternateARCH architect (ural)BIM building informationmodelingBLDG buildingBLKG blockingBM bench markBO bottom of...BOS bottom of structureCAB cabinetCJ conrol jointCLG ceilingCOL columnCONC concreteCONST constructionCONT continuous, continueCONTR contractorCPT carpetCSCI contractor supplied,contractor installedDEMO demolish, demoloitionDF drinking fountainDIA diameterDIM dimensionDTL detailDW dishwasherDWG drawingELEV elevationEQ equalESPJT expansion jointEXIST existingEXP exposedEXT estimateEXT exteriorFA fire alarmFBO furnished by othersFD floor drainFE fire extinguisherGeneral Project NotesNoteNumberDescription1 General Contractor shall verify dimensions and conditions of the existing building.2 The term "Contractor" refers to General Contractor unless otherwise noted.3 All shop drawing dimensions to be checked and verified in the field by the Contractor who will be responsible for same.4 All shop drawing dimensions to be checked and verified in the field by the Contractor who will be responsible for same.5 General Contractor is responsible for patching of all holes or damage encountered in work done by himself or any other trade or contractor.6 General Contractor shall be responsible for the complete repair and refinishing of all work to match existing conditions as a result of necessary cutting,patching, or demolition by all trades while performing the work.7 General Contractor to provide all required blocking, anchorages for accessories, mill work, trim, grab bars, mechanical and electrical items.8 Construction limit line is approximate, access to other areas as required by work is acceptable by approval of Architect and Owner.9 In general, repetitive features drawn to more than one scale are shown in full only once and repetitions are not completed in every detail as shown in theoriginal instance.10 Details which occur both right- and left-hand are shown only once.11 Partitions are located by one of the following methods: a) Where possible, by relationship to adjacent structure. b) Typical relationship to large scaledetails. c) By dimension from structure or partition already located.12 Metal Corner Bead/'J' Mould around all edges of gypsum board walls abutting other materials. Leave 1/4" gap from wall for sealant.13 Where columns and stud walls align, gypsum board to be continuous over columns.14 Gypsum board in toilet and shower areas to be W.R. gypsum board.15 Where condition of finish arises that no detail or note covers, match detail to existing situation of similar condition.16 Rubber base shall be installed on all gypsum board walls and toe space, unless otherwise detailed or scheduled.17 Patch floors as required to leave level, smooth surface required for installation of floor finish.18 Seal openings in floor around ducts, pipes, vents, soil-pipes, traps, conduit, etc.19 All penetrations through walls above ceiling and below structure are to be closed tight around penetration. Contractor to coordinate.20 All mechanical & electrical lines to be installed tight to structure where possible in all instances.21 General Contractor to provide all concrete pads necessary for mechanical and electrical. Location to be provided as necessary by mechanical andelectrical subcontractors.22 In painted or finished rooms, all horizontal and vertical piping and conduits shall be furred to match room finish as indicated or scheduled.23 When duct work, pipes and mechanical units are exposed in painted rooms, they will be painted as directed by Architect.24 Paint all exposed steel unless otherwise noted.25 Heating, plumbing and electrical plans where shown diagrammatically are intended to indicate capacity, size and location and general arrangements. Allnecessary features of construction will be required as if shown in detail.26 Where mechanical and electrical equipment locations conflict electrical fixtures location shall take preference.27 Where plumbing occurs in stud wall with horizontal or vertical piping, studs shall be constructed deep enough to accommodate the piping. Same for allelectrical panels.28 No materials or tools may be left in spaces not requiring work. Any dirt or materials dropped enroute to work areas must be cleaned in the existingbuilding.29 Damage to existing: Any and all damages caused by the contractor and or people under direct supervision of the contractor shall be replaced and orrepaired at contractors expense with no cost infraction on owner.1/4" = 1'-0"Project SymbolsSheet IndexSheet Number Sheet NameCVR COVER SHEETA0.1 PROJECT INFORMATIONC0.1 GENERAL CIVIL NOTES AND SHEET INDEXC1.0 EXISTING CONDITIONSC2.0 SITE PLANC3.0 GRADING PLANC7.0 CIVIL DETAILSS1.1 GENERAL NOTESS1.2 LEGEND AND ABBREVIATION LISTS1.3 TYPICAL DETAILSS1.4 TYPICAL DETAILSS1.5 TYPICAL DETAILSS2.1 FOUNDATION PLANS2.2 UPPER FLOOR AND LOWER ROOFFRAMING PLANS2.3 UPPER ROOF FRAMING PLANS2.4 SHEARWALL PLANSS4.1 FOUNDATION DETAILSS4.2 FRAMING DETAILSS4.3 ROOF FRAMING DETAILSA1.1 MAIN FLOOR PLANA1.2 UPPER FLOOR PLANA3.1 BUILDING SECTIONSA4.1 WALL SECTIONSA6.1 EXTERIOR ELEVATIONSA6.2 EXTERIOR ELEVATIONSA7.1 INTERIOR ELEVATIONSA8.1 DOOR/WINDOW TYPES/ROOF PLANE1.1 ELECTRICAL POWER AND LIGHT PLANSTRADITIONS SUBDIVISION TOWNHOMESBOZEMAN, MONTANARevision ScheduleNo. Revision DateCONSTRUCTION SET (8.8.2021)OPEN SPACE = 5,782 SF x 10% = 578.2 SF (WE HAVE 5,225 SF)PARKING= 4 DWELLING = 4 SPOTS x 2 UNITS = 8 3 DWELLING = 3 SPOTS x 3 UNITS = 9TOTAL NEEDED = 17 PROVIDING 17 ONSITE AND 3 OFFSITE (ROSA WAY)