Loading...
HomeMy WebLinkAboutC1.3DrainagePlan_08-23-21 / / N H � Q � W ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS m z � SCALE AASHTO MATERIAL COMPACTION / DENSITY a MATERIAL LOCATION DESCRIPTION CLASSIFICATIONS REQUIREMENT o CURB INLET D M' m �' FN FILL:FlLL MATEMM FOR LAYER b' / I TBC 4705.6 STARTS FROM ME TOP OF THE•C LAYER ANY SOIL/ROCK MATERIALS,NATIVE PREPARE PER STE DESIGN N L - ENGINEER'S PLANS PAVED A ro THE BOTTOM OF F_EVBIE PAVEMENT SOILS,OR PER ENGINEER'S PLANS. INV 4701.3 DFINISHEDGRAM NSA IN SENTONS MAY HAVE Z 15" STORM 1 inch- 21Y NOTE THAT PAVEMENT SUBBASE MAY BE CHECK PLANS FOR PAVEMENT STPoNGEIIT MATERIAL AND / SEWER PART OF ME'D'LAYFA SUBGRADE REQUIREMENTS.TS. PREPARARON REQUIREMENTS m AASHTO M145' BEGIN COMPACRONS AFTER 12•(300 mm)OF GRANULAR WELL-GRADED U SSMH INIMALSTART FlLL FlLL MATERIAL Ent IAYER'C' A-1,A-2-4,A-3 MATERIAL OVER ME CHAMBERS IS REACHED. RIM 4706. STARTS FROM ME TYIP OF ME SOIL/AGGREGATE MIXTURES,G35R COMPACT ADDIRONAL LAYERS IN 8'(ISO mm) } EMBEDMENT STONE('B'LAYER)TO 16- FINES OR PROCESSED AGGREGATE. MAX ills M A MIN.95R PROCTgt OUSITY Z H INV IN 4693. XT'G URN 8" WATER MAIN C (-..)ABOVE THE TOP OF THE OR FOR-GRADED MATVRIM AND B5% ., INV OUT 469 GUT R CHAMBER.NOTE THAT PAVEMENT MOST PAVEMENT SUBBASE AASHTO M43' REMIAATRE�PoADLSw.�R UERR GR FOR OSS VEH�ICLEGWWETOHT� O U ¢" D.I. WATER SUBBASE MAY BE A PART OF ME'C' MATERIALS CAN BE USED IN LIEU OF � EXT'G LITE SERVICE \ 8" SAN SWR MAIN 'A THIS LAYER. 3,357,4,467,5,56,57,6, NOT TO EXCEED 12.000111(53 LNI DYNAMIC W POLE BASE / W W �, W 87,88,7.78.8.BB.9.10 FORCE NOT TO EXCEED 2Q000 Ibe I.MN). W fRBEDMENi STONE:FlLL SDRROONDING K Ia 111E CHMIBERS FROM THE FOUNDATION AA$HTO M43' W B SIYTNE('A'uYER)TO ME'C'uYER CLEAN,CRUSHED,ANGULAR STONE 3,357,4,467,5,58,57 NO COMPACTION REWIRED. .N. A80£. EXT'G SIDE PCCSIDEWALK 4" SAN SWR S S S -= L S S Faue°AnDN STONE:FILL BELOW Ld SIDEWALK O SERVICE � A CHAMBERS FROM THE SUBGRADE UP M CLEAN,CRUSHED,ANGULAR STONE ,AS 46.5. MTV CA FLAT U RIXL ro '� 3,357,4,467,5,56,57 ACHIEVE A MT SURFACE' THE FOOT(BOTTOM)OF ME CHMIBER. NLET / EXT'G^ADA_\ DO 05.4 GALLOWAY STREET o -� 30" NYLOPLAST DRAIN BASIN (90' wide R/W- Prwately Matr,t°o-,ed) PLEASE NOTE: CURB INLET WITH D.I. FRAME AND GRATE. N E 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. CONCRETE COLLAR NOT REO'D` & S/W 18" STORM FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4(AASHTO M43) RIM 4707.4 SEWER STONE". �p NTgN / 8" ADS INV IN 4705.35 9 24" ADS INV OUT 47020 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" CHRIS G. / II IN ui' • (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. BUDESKI INFILTRATION BASIN A ` N".10B25 PE / 3 ADS STORMTECH SC-740 4 _ 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A EN ,f` CHAMBERS. OBSERVATION •ID u„ T FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD S�' NA PORT EAST END. DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 'co / BOTTOM OF CHAMBER 4702.0 8" ADS INV ` 4705.5 _SS DRAWN BY: CGB ZLET TADS GEOSYNTHETICS 601T NON-WOVENREVIEWED BY: DAD GEOTEXTILE ALL AROUND CLEAN, CRUSHED, PAVEMENT LAYERADS ROOF DRAIN ANGULAR STONE IN A & B LAYEPIPING. 5=0.5% cn I (DESIGNED BY SITE PROJECT ENGINEER:CGB DESIGN ENGINEER) CURB `4 � 4 ❑ I PERIMETER STONE .ro aorroH of NF.B�FAUaENr.FOR ONPAT.D DESIGNED BY:CGB / /TBC 4701.30 8" ADS INV ❑ ❑ e NV 4701.30 _ (SEE NOTE 6) °N5`"°'F°°m"O fA0"(o�mmA""Y 4705.E :, EXT'G CURB I C�__ •N°�"O 18' MIN■ TER EXCAVATION WALL V V 6' MIN �� ❑ ❑ (CAN BE SLOPED 8' MAX 3 `/ ❑ ❑ OR VERTICAL O I 30' ��� III ) DEPTH OF STONE TO BE ° I rDETERMINED BY SITE ` F o 0 0 0 �L1 ' WITH NYLOPLAM DRAIN BASIN "�.I \ - DESIGN ENGINEER 6' MIN N a° ` WITH D.I. FRAME AND GRATE. IA \ \ `CONCRETE COLLAR NOT REQ'D I - -- ---- --- ----J I.F4 µ1- RIM 4708.2 �f w a ° - 8" ADS INV IN 4705.35 8" ADS ROOF DRAIN 12' MIN -I SC-740 A 6` MIN 12' TYP a ,� a` 24" ADS INV OUT 4704.0 S PIPING. S= 0.5% END CAP SUBGRADE SOILS JJJ IS ` INV IN 4705.4 (SEE NOTE 4) C/] EXT'G CURB / & GUTTER INFILTRATION BASIN B s 00 NOTES. 4 ADS STORMTECH SC-740 CHAMBERS. OBSERVATION ir-�I PORT SOUTH END. 'I `'P` I 1. SC-740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL /BOTTOM OF CHAMBER 4704.0 "li �II 1u,1. STORMWATER COLLECTION CHAMBERS", OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION C� III { CHAMBERS". `(3 8" ADS INV IF-�I ®1 p.( W / h 2. SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC 'mod 4705.55 1 /-1 WS. P€ FS " F-i ,. CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". PI W g / 8" ADS INV 8" ADS INV 3. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR �� 8" WATER/MAIN 4705.E �'�� 4701 -1 FOUNDATION, EMBEDMENT, AND FILL MATERIALS. �_1 F-I EXT'G CURB / �` 4. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND �Tw 15" SAN & GUTTER ..4/ / {I THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. ICI SWR MAIN 8" ADS ROOF DRAIN �I 111 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. PIPING. S= 0.2% EXT'G / I PARKING 6. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE V USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR V AT THE SITE DESIGN ENGINEER'S DISCRETION. O SSMH RIM 4707.90 EXT'G CONCRETE ,� (7.3 ADS SC-740 STORMTECH-TYPICAL DETAIL E"I DRIVEWAY NTS O 30 BOOT WIDE PAVED ALLEY EDGE OF / OBSERVATION (Privately Maintained) PAVEMENT PORT PER INFILTRATION BASIN C. ADS SPEC / CLEANINSTALL OVERSIZE- COBBLES (6+) ROCK TO OPSOIL AND _ _ _ _ _ _ / NATIVE GRAVELS. GRAVEL - - - - - - - T - - - - T T � LANDSCAPING AREA - AS SHOWN/ ry VARIES CONSOLIDATED PERIMETER 18' MIN STONE PER ADS SPECIFICATIONS (TYP) / HIGH CAPACITY INFILTRATOR 1 I����1yy oo ADS - STORMTECH SC-740---_ 30' h+i 12' MIN 51' 12' MIN ~ INSTALL FREE DRAINING ROCK FROM _�6' MIN y, BOTTOM OF INFILTRATOR TO 12" INTO <r <k - , T,.r Go EXT'G GRAVEL LAYER. GEOTECHNICAL ENGINEER SHALL BE ON-SITE DURING EXCAVATION TO VERIFY FREE DRAINING q�'i ,�'� ,�'�z�,�'�z�,� � '"� ��•, GRAVEL MATERIAL DEPTH. �k�7-��k�-�;, �-�;, 7-�� � g 0 al G 6,5' MIN -I" ® U Pa EXT'G NATIVE F GRAVEL LAYER NOTE: a INSTALL PER STORMTECH i SPECIFICATIONS - DETAIL S BEET cL3 ADS SC-740 STORMTECH-PROJECT SPECIFIC DETAIL C1.3 NTS THE FLAPS o DRAINAGE PLAN PROJECT:20-113 Q DATE:02/26/21