Loading...
HomeMy WebLinkAboutA2.01_2352VaqueroElevations_02-26-21WALL AREA=27’−2 x 15’−0 = 407 SFREQ’D GLAZING AREA= 102 SFACTUAL GLAZING AREA= 106 SFACTUAL/REQ’D = 104%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA= 8’−7 x 15’−0 = 129 SFREQ’D GLAZING AREA= 32 SFACTUAL GLAZING AREA= 60 SF(INCLUDES DOORS)ACTUAL/REQ’D = 187%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA=27’−2 x 15’−0 = 407 SFREQ’D GLAZING AREA= 102 SFACTUAL GLAZING AREA= 106 SFACTUAL/REQ’D = 104%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.182021b21a2223242526a26b27286c6b6a6d5c5b5a432c2a2b1c1d1a1b35BLACK METAL CAP FLASHINGWHITE HARDI LAP SIDING − 7" REVEALBLACK HARDI PANEL ACCENTBLACK METAL FACIAKYNAR COATED GALV METALWOOD FRAMED AWNINGS W/METAL FACIAPC METAL BALCONY W/TREX FLOORINGWALL AREA=27’−2 x 15’−0 = 407 SFREQ’D GLAZING AREA= 102 SFACTUAL GLAZING AREA= 106 SFACTUAL/REQ’D = 104%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA= 8’−7 x 15’−0 = 129 SFREQ’D GLAZING AREA= 32 SFACTUAL GLAZING AREA= 60 SFACTUAL/REQ’D = 187%(INCLUDES DOORS)REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA=27’−2 x 15’−0 = 407 SFREQ’D GLAZING AREA= 102 SFACTUAL GLAZING AREA= 106 SFACTUAL/REQ’D = 104%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.2833343510d10c11c11a11b10b10a1213363738394014c14b14a15d15c15b15a331214MAIN LEVEL PLAN0"UPPER LEVELPLAN16’ − 4 3/4"MAIN T.O.W.15’ − 0"UPPER T.O.W.25’ − 5 7/8"T.O.FDN−2 1/4"4’ − 0 1/2"WALL AREA= 36’−0 x 15’−0 = 540 SFREQ’D GLAZING AREA= 135 SFACTUAL GLAZING AREA= 133 SFACTUAL/REQ’D = 99% REFER TO WINDOW SCHEDULE FOR ALL WINDOW HEAD HEIGHTS ABOVE FINISH FLOOR15’ − 0"9’ − 1 1/8"44c44d44e44b44a434241a41b41c41d41e32’ − 0"44hWALL AREA= 14’−6 x 15’−0 = 217 SFREQ’D GLAZING AREA= 54 SFACTUAL GLAZING AREA= 77 SFACTUAL/REQ’D = 142%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA= 7’−0 x 15’−0 = 105 SFREQ’D GLAZING AREA= 26 SFACTUAL GLAZING AREA= 9 SFACTUAL/REQ’D = 34%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.WALL AREA= 14’−6x15’−0 = 217 SFREQ’D GLAZING AREA= 54 SFACTUAL GLAZING AREA= 68 SFACTUAL/REQ’D = 142%REFER TO WINDOW SCHEDULE FOR HEAD HEIGHTS OF ALL WINDOWS.2329a29b303132a32e32d32c787d7c7b7a832bdzyn2architectscopyright 2020 dzyn2 architects, pllc drawings shall not be modified, copied, or used for purposes other than their intended use, without prior written consent from dzyn2 architects, pllc verify scale noted on drawings, as size reduction will affect scale of drawingsREV:PROJECT NAME:Michael E. Pentecost, AIAP.O. Box 10866Bozeman, mt. 59719Ph −406−539−5067Fax −406−566−5782ADDRESS:OWNER:LEGAL:A2.01ELEVATIONS2352 VAQUERO PARKWAYTHE FLATS AT VAQUERO PARKWAYSITE PLANREVIEWFOUR FLY FELLOWSLOT 1, BLOCK 16 − BAXTER MEADOWS SUB, PHASE 2A2−26−211/4" = 1’−0"1WEST ELEVATION1/4" = 1’−0"2EAST ELEVATION1/4" = 1’−0"3NORTH ELEVATION1/4" = 1’−0"4SOUTH ELEVATION