Loading...
HomeMy WebLinkAboutA0.00_2350VaqueroCover_02-26-211i11NameElevationN1A101SIM/1A1011View Name1/8" = 1’−0"DRAWING TITLEGRAPHIC SYMBOLSBUILDING SECTION1A101SIMDETAIL SECTION1RefView NameEXTERIOR ELEVATION111RefView NameINTERIOR ELEVATIONDETAIL CALLOUTA1011SIMROOMNAME101ROOM NAME & NUMBERSTRUCTURAL GRIDREVISION CLOUD & NUMBER1DOOR NUMBER/TYPEWINDOW NUMBER/TYPEBENCHMARK ELEVATIONVIEW REFERENCEEXISTING CONTOURNORTH ARROWdzyn2architectscopyright 2020 dzyn2 architects, pllc drawings shall not be modified, copied, or used for purposes other than their intended use, without prior written consent from dzyn2 architects, pllc verify scale noted on drawings, as size reduction will affect scale of drawingsREV:PROJECT NAME:Michael E. Pentecost, AIAP.O. Box 10866Bozeman, mt. 59719Ph −406−539−5067Fax −406−566−5782ADDRESS:OWNER:LEGAL:A0.00COVER SHEET2350 VAQUERO PARKWAYTHE FLATS AT VAQUERO PARKWAYSITE PLANREVIEWFOUR FLY FELLOWS, LLCLOT 1, BLOCK 16 − BAXTER MEADOWS SUB − PHASE 2A1−30−21DRAWING INDEXSHEET NUMBER SHEET NAMEA0.00 COVER SHEETA0.01 NOTESA1.01 PLAN VIEWSA2.01 ELEVATIONSA2.02 PERSPECTIVE ELEVATIONSA3.01 SECTIONSA3.02 DETAIL SECTIONSS1.01 FOUNDATION PLANS1.02 MAIN LEVEL FLOOR FRAMINGS1.03 UPPER LEVEL FLOOR FRAMINGS1.04 ROOF FRAMING PLANE1.01 MAIN LEVEL ELECTRICAL PLANE1.02 UPPER LEVEL ELECTRICAL PLAN1. DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF SERVICE, ARE THE EXCLUSIVE PROPERTY OF THIS DESIGNER WHETHER THE PROJECT FOR WHICH THEY WERE PREPARED IS EXECUTED AND CONSTRUCTED OR NOT. THESE DOCUMENTS ARE NOT TO BE REPRODUCED IN ANY FORM AND THEY ARE NOT TO BE USED BY THE PROJECT OWNER NOR ANY OTHER ENTITY ON ANY OTHER PROJECTS OR FOR ANY EXTENSIONS OR ADDITIONS OR ALTERATIONS TO THE ORIGINAL PROJECT EXCEPT BY WRITTEN AUTHORIZATION AND PERMISSION FROM AND AGREEMENT WITH THIS DESIGNER.2. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN. LARGER SCALE DRAWINGS SHALL GOVERN SMALLER SCALE.3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AT THE JOB SITE AND SHALL NOTIFY THE DESIGNER OF ANY DISCREPANCIES, OMISSIONS, AND/OR CONFLICTS BEFORE PROCEEDING WITH THE WORK.4. CONTRACTOR MUST COMPLY WITH THE RULES AND REGULATIONS OF AGENCIES HAVING JURISDICTION AND SHALL CONFORM TO ALL CITY, COUNTY, STATE AND FEDERAL CONSTRUCTION, SAFETY AND SANITARY LAWS, CODES, STATUTES AND ORDINANCES. ALL FEES, TAXES, PERMITS, APPLICATIONS AND CERTIFICATES OF INSPECTION, AND THE FILING OF ALL WORK WITH GOVERNMENTAL AGENCIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.5. EACH TRADE WILL PROCEED IN A FASHION THAT WILL NOT DELAY THE TRADES FOLLOWING THEM.6. CONTRACTORS SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS AND/OR SPECIFICATIONS TO THE TRADES UNDER THEIR JURISDICTION.7. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE AND IN PROPER ALIGNMENT.8. ALL MATERIALS SHALL BE NEW, UNUSED AND OF THE HIGHEST QUALITY IN EVERY RESPECT, UNLESS NOTED OTHERWISE. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER’S RECOMMENDATIONS AND INSTRUCTIONS.9. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. WHERE THE TERMS "EQUAL TO", "EQUIVALENT" OR "APPROVED EQUAL" ARE USED, THE DESIGNER SHALL DETERMINE EQUALITY BASED ON INFORMATION SUBMITTED BY THE CONTRACTOR.10. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS FOR A PERIOD OF AT LEAST ONE (1) YEAR FROM APPROVAL FOR FINAL PAYMENT. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR THEIR WORK.12. CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF ACCUMULATION OF WASTE MATERIALS OR RUBBISH; PREMISES TO BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS. AT THE COMPLETION OF THE WORK, LEAVE THE JOB SITE FREE OF ALL MATERIALS AND BROOM CLEAN.13. PATCH ALL AREAS WHERE FLOOR IS NOT LEVEL OR TRUE PRIOR TO THE INSTALLATION OF FLOORING OR CARPETING. 14. TO INSURE PROPER AND ADEQUATE BLOCKING, ALL BLOCKING FOR CABINET WORK WILL BE THE RESPONSIBILITY OF THE CABINET CONTRACTOR.15. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL WALK THROUGH WITH THE DESIGNER AND COMPILE A "PUNCH LIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE WORK. FINAL PAYMENT WILL BE CONTINGENT UPON THE COMPLETION OF THESE ITEMS.16. ANY CHANGE WHICH RESULTS IN EXTRA COST SHALL NOT PROCEED WITHOUT WRITTEN AUTHORIZATION OF THE OWNER AND THE DESIGNER.17. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND HAS NOT BEEN CONSIDERED BY THE ARCHITECT OR ENGINEER. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE THROUGHOUT CONSTRUCTION.18. ANY AMBIGUITIES, DISCREPANCIES, OR CONFLICTS DISCOVERED THROUGH THE USE OF THESE DRAWINGS SHALL BE REPORTED IMMEDIATELY TO THE DESIGNER. FAILURE TO PROVIDE NOTICE TO THE DESIGNER PRIOR TO ANY CONSTRUCTION ACTIVITY SHALL RELIEVE THE DESIGNER OF ALL LIABILITIES AND/OR ANY OTHER CONSEQUENCE.19. CHANGES TO OR DEVIATIONS FROM THE DRAWINGS MADE WITHOUT THE EXPRESS WRITTEN CONSENT OF THE DESIGNER SHALL BE CONSIDERED TO BE UNAUTHORIZED AND SHALL RESULT IN THE PARTY MAKING SUCH CHANGES TO OR DEVIATIONS FROM THE DRAWINGS BEING HELD RESPONSIBLE FOR THE CONSEQUENCES RESULTING FROM SUCH CHANGES.GENERAL NOTESAREA SCHEDULENAME AREAMECHANICAL 33 SFUNIT 101 548 SFUNIT 102 547 SFUNIT 103 547 SFUNIT 104 548 SFUNIT 201 575 SFUNIT 202 569 SFUNIT 203 569 SFUNIT 204 575 SF The Flats at 2350 Vaquero Parkway 1Cover