Loading...
HomeMy WebLinkAboutResolution 3287 Authorize City Manager to sign CO#1 for 1998 sewer improvements COMMISSION RESOLUTION NO. 3287 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH PLANNED AND ENGINEERED CONSTRUCTION (PEC), INC., HELENA, MONTANA. WHEREAS, the City Commission did, on the 6th day of July 1998, authorize award of the bid for 1998 sanitary sewer improvements to Planned and Engineered Construction (PEC), Inc., Helena, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Planned and Engineered Construction (PEC), Inc., as contained in Change Order No.1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 3rd day of May 1999. ~/m~ ALFR M. STIFF, Mayor ATTEST: ~ ;!d/~~ ROBIN L. SULLIVAN Clerk of the Commission RECEIVED iljAH 3 " 'i88S CHANGE ORDER ORDER NO. 1 DATE 2/1/99 AGREEMENT DATE: August 18r 1998 NAME OF PROJECT 1998 Sanitary Sewer Improvements OWNER City of Bozeman CONTRACTOR P.E,C'r Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 586 lineal feet of additional 8" lining work. 406 lineal feet of 10" lining work. Reinstate 62 service, internally. Justification: Budget available to perform additional work Attachments: Letter from City of Bozeman to TD&H, 8/18/98. Letter from P.E.C. to TD&H, 8/27/98. Original CONTRACT PRICE: $ 111 r647.40 Current CONTRACT PRICE adjusted by previous CHANGE ORDER:$ 111 r647.40 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) by: $ 46r636.00 The new CONTRACT PRICE including this CHANGE ORDER will be $ 158r283.40 CHANGE of CONTRACT TIME: N/ A The CONTRACT TIME will be (increased)(decreased)by N/ A calendar days. The date for completion of all work will be unchanged from original . R=mmendoo~~~l- ~;~~ Ordered by: t P. E,C) '). I i Accepted by: \- -l S _dVobs\B96-24\OITcDocs\Chageorl.wpd