From:Griffin Nielsen <GNielsen@BOZEMAN.NET>
Sent:Thursday, March 4, 2021 9:55 AM
To:derek@mad-eng.com
Cc:chris@mad-eng.com
Subject:RE: The Flats CIL of WR
Hi Derek,
The request is in my queue, I’ll response back once I have a chance to review.
Thanks,
City of Bozeman MT
Griffin Nielsen, PE| Engineering Department
406.582.2280
gnielsen@bozeman.net
From: derek@mad-eng.com <derek@mad-eng.com>
Sent: Wednesday, March 3, 2021 11:00 AM
To: Griffin Nielsen <GNielsen@BOZEMAN.NET>
Cc: chris@mad-eng.com
Subject: RE: The Flats CIL of WR
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hi Griffin,
I just wanted to follow up on the email below and see if you’ve had a chance to review the CIL-WR for The Flats
Development.
Please feel free to contact me with any questions.
Thank you,
Derek Dennehy, EI
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office
406.586.5740 fax
derek@mad-eng.com
2
From: derek@mad-eng.com <derek@mad-eng.com>
Sent: Monday, March 1, 2021 4:37 PM
To: 'Griffin Nielsen' <GNielsen@BOZEMAN.NET>
Subject: RE: The Flats CIL of WR
Hello Griffin,
I hope you enjoyed your time off. I wanted to follow up on the email below regarding CIL-WR for The Flats Site
Plan. Brian stated that there is a demand offset credit of 1.27 AF, and that you would take care of the remainder of the
fee calculation.
Can you provide guidance for this?
Thank you,
Derek Dennehy, EI
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office
406.586.5740 fax
derek@mad-eng.com
From: derek@mad-eng.com <derek@mad-eng.com>
Sent: Wednesday, February 24, 2021 1:11 PM
To: 'Brian Heaston' <bheaston@BOZEMAN.NET>
Cc: 'chris@mad-eng.com' <chris@mad-eng.com>; 'Griffin Nielsen' <GNielsen@BOZEMAN.NET>
Subject: RE: The Flats CIL of WR
Sounds good, I will wait to hear from Griffin. Thanks Brian.
Derek Dennehy, EI
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office
406.586.5740 fax
derek@mad-eng.com
From: Brian Heaston <bheaston@BOZEMAN.NET>
Sent: Wednesday, February 24, 2021 12:34 PM
To: derek@mad-eng.com
Cc: chris@mad-eng.com; Griffin Nielsen <GNielsen@BOZEMAN.NET>
Subject: RE: The Flats CIL of WR
3
Prasifka’s book was published in 1994 and is not represented of contemporary water use. We’re working on updating
water adequacy manual which will streamline the CILWR program, just not ready yet. Hopefully in the next couple
months it’ll be done.
CILWR was provided with the 2A, based on a volume calculation of 22.57 gal/sq ft. Subject property is 18,337 sq ft
producing an demand offset credit of 1.27 AF.
Griffin will take care of the rest of the fee calculation.
From: derek@mad-eng.com <derek@mad-eng.com>
Sent: Wednesday, February 24, 2021 11:45 AM
To: Brian Heaston <bheaston@BOZEMAN.NET>
Cc: chris@mad-eng.com
Subject: The Flats CIL of WR
Brian,
I’m writing in regards to CIL of WR for The Flats Site Plan application. The Flats is a “live-work” concept, with a small
commercial space (approximately 550 SF) on the main level and a one-bedroom living space of around the same size on
the second floor. There will be two buildings, each with four commercial units and four one-bedroom units.
The legal description for the property is Lot 1, Block 16 of Baxter Meadows Phase 2A. Can you check to see if a water
rights credit exists for this property?
Do you have an established water use estimate for a general office building in terms of square footage? If not, we have
provided an estimated commercial use based on design guidelines outlined in ‘Water Planning Supply’, by David W.
Prasifka. The expected value for water usage for a general office building less than ten years old is 0.093 gpd/sf. This
amounts to a total of 409 gpd for the eight commercial units (0.093 gpd/sf * 550 sf/unit * 8 units). This equates to 0.46
ac-ft./yr.
For the residential usage, we used the typical MF use of 0.124 ac-ft./yr. (0.124 ac-ft/yr. * 8 units). This amounts to a total
of 0.99 ac-ft/yr. (includes irrigation).
This places the total water usage for the development at 1.45 ac-ft./yr. Please let me know if this is acceptable and feel
free to provide any feedback.
Thank you,
Derek Dennehy, EI
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office
406.586.5740 fax
derek@mad-eng.com
4
City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9)
and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this
email, its sender and receiver, and the contents may be available for public disclosure and will be retained
pursuant to the City’s record retention policies. Emails that contain confidential information such as information
related to individual privacy may be protected from disclosure under law.
City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may
be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender
and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record
retention policies. Emails that contain confidential information such as information related to individual privacy may be
protected from disclosure under law.