Loading...
HomeMy WebLinkAboutMPDES SWPPP Admin 7.18_F2/23/2019 1 BMP BREAKDOWN – CONVEYANCE BMPS SECTION 7 SEDIMENT AND RUNOFF CONTROL •DIVERSION OF RUN-ON •PERIMETER CONTROLS •CONVEYANCE BMPS •INLET PROTECTION RUNOFF CONVEYANCE •THESE BMPS PREVENT THE MORE DEVASTATING TYPES OF EROSION BY KEEPING WATER AWAY FROM BARE SOILS •ALLOWS YOU TO RESPONSIBLY CONVEY WATER TO A COLLECTION POINT •PLANNING AHEAD TO INCORPORATE CONVEYANCE CAN BE A SIMPLE SOLUTION TO AVOIDING MANY PROBLEMS RUNOFF CONTROLS BMPS KEEP CLEAN WATER – CLEAN! (AWAY FROM DISTURBED AREAS) DIVERSION DIKES AND SWALES 1 2 3 4 5 6 2/23/2019 2 USE WASHED ROCK LINING CHANELS,DIKES AND SWALES Fun for parties –Not great for worker’s comp GRASS LINED CHANNELS WATER BARS PIPE SLOPE DRAINS 7 8 9 10 11 12 2/23/2019 3 LEVEL SPREADER & VEGETATED SPRAY FIELD OUTLET PROTECTION INTERCEPTION AND DISSIPATION •REDUCES VELOCITY OF RUNOFF AND DISSIPATES ENERGY, WHICH REDUCES EROSION •INTERCEPTS AND DETAINS SMALL AMOUNTS OF SEDIMENT •REDUCES SEDIMENT TRANSPORT •MAY NOT BE PLACED IN STREAMS OR WETLANDS CHECK DAMS CHECK DAMS TRIANGULAR SILT DIKE 13 14 15 16 17 18 2/23/2019 4 SPRING BERM OVER VS. THROUGH STRAW BALE BARRIER ALTERNATIVES TO STRAW BALES SEDIMENT FENCE IS •A BMP •A BARRIER •A SAIL IN THE WIND IS NOT •FILTER FABRIC (BUT CAN BE) •PERIMETER IDENTIFICATION (BUT CAN BE) •THE FIRST LINE OF DEFENSE SEDIMENT FENCE •USE FOR CONTAINMENT, NOTFILTRATION •INSTALL ALONG CONTOUR •OFTEN INSTALLED INCORRECTLY •USE AS SECONDARY BMP NOT PRIMARY BMP 19 20 21 22 23 24 2/23/2019 5 Contour Installation J-hook Installation SEDIMENT FENCE KY ESC Field Manual SEDIMENT FENCE INSTALLATION JOINING AND ENDING SEDIMENT FENCE SEDIMENT FENCE FAILURE PROPER SEWN-IN-POCKET INSTALL WHAT IS CORRECT? 25 26 27 28 29 30 2/23/2019 6 WATTLES WATTLES -STAKING CHALLENGES WITH WATTLES REUSABLE WATTLES COIR LOGS TERRATUBES 31 32 33 34 35 36 2/23/2019 7 COMPOST BERMS & SOCKS COMPOST FILTER SOCKS & FILTER BERMS •USE COARSE COMPOST COMPOST FILTER SOCKS •COARSE COMPOST •MINIMUM SOCK SIZE 12 INCHES •POLISHES WATER •CAN PRODUCE AN INITIAL SPIKE IN NTU BLOWN COMPOST BERMS AND SOCKS STORM DRAIN INLET PROTECTIONBMP C220 INLET PROTECTION CATCH BASIN INSERTS Overflow capacity Below Grade 37 38 39 40 41 42 2/23/2019 8 KEEP THE LOADING ON THE SURFACE Blocksomand Company SEDIMENT TRAP TEMPORARY SEDIMENT POND SEDIMENT POND ENHANCEMENTS THINGS TO REMEMBER… •SOURCE CONTROL •KEEP CLEAN WATER CLEAN •BMP COMBINATIONS •USE MULTIPLE BMPS TO INCREASE EFFECTIVENESS COMPLETION OF SECTION 4More BMPs to Come 43 44 45 46 47 48