Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MPDES 9.18 ACF West Case Studies
1 Woven Non Woven Geogrid Composites ▪Separation Filtration Transmission Reinforcement Confinement Training Facility 1 2 3 4 5 6 2 Trench Drain o o o o o o o WALGREEN’S BREMERTON TUNNEL WINERY WHIRLPOOL DISTRIBUTION -FREDRICKSON 7 8 9 10 11 12 3 167 TO PUYALLUP WSDOT SR 18 WSDOT SR 20 DETOUR Walgreen’s Multiple layers of Geogrid to address potential liquefaction 13 14 15 16 17 18 4 Green River -US Army COE, King County 19 20 21 22 23 24 5 LAKE MARGARET KING COUNTY TACOMA NARROWS ISSAQUAH HIGHLANDS 2007 ISSAQUAH HIGHLANDS 2011 25 26 27 28 29 30 6 ISSAQUAH JANUARY 2017 January 2017 ISSAQUAH SEPTEMBER 2017 Blanket Mulch Biotic Soil Amendments Rolled Hydraulic BLM Yakima River 31 32 33 34 35 36 7 August 2012 February 2009 August 2008 December 2008 Northeast Novelty Hill Road, King County, WA -Snoqualmie Falls “When holding both products to similar standards and various conditions, it was concluded that mulch can deliver “equivalent,” if not superior, performance to a blanket.” 37 38 39 40 41 42 8 The combination of mechanical and chemical bonding creates erosion control with superior structure and adhesion to soil. Soil Test Identify needs Success rate Correct seed Enjoy $ Savings ADD TOP SOIL Soil Report Add a combination of processed straw, flexible flax fibers infused with Sphagnum peat moss, mycorrhizae, growth stimulant, soil conditioners VS.Peat Moss -the most popular green house growing medium in the world plus biotic soil amendments 43 44 45 46 47 48 9 49 50 51 52 53 54 10 VILLAS AT AUBURN 115,000CF SIMONDSCOURT 10.5’ HIGH 55 56 57 58 59 60 11 Plans Approved May 2017 Forebays: 1.Improve Sediment Removal 2.Reduce Costs of Maintenance MMaintenance Forebay 61 62 63 64 65 66 12 Individual Block Assembled Mattress Infiltration of 4,000 Inches per hour Storage within arch ADA compliant Beveled Edge Interlocking Shape HS –20 / H20 loading Leed Credits Easily Installed Easily Maintained 67 68 69 70 71 72 1302M062007D© 2012 Endpoint Solutions All Rights Reserved Ford Motors Louisville Kentucky Auto Manufacturing Plant The PaveDrain Difference ❑NO Maintenance after 2+ YEARS!!!❑78,000 lb. two axel fire truck ❑550 gallons in 75 seconds 4,000 Inches per hour!! HS20 & H20 Loading Loading Capacity and Massive Infiltration are Key! 73 74 75 76 77 78 14 Two years of runoff from adjacent asphalt surface Combination sanitation truck with 1500 gallon water tank –Maintenance PaveDrain VAC Head The PaveDrain Difference –Maintenance Continuous suction up to 3,400 CFM, only 1,500 CFM is used. 30” diameter Weight < 50 lbs. Handle for easy moving Spinning water nozzles displace 1,000 –2,500 psi. Combination Sanitation Truck –2 Laborers The PaveDrain Difference –Maintenance “The testing completed on the PaveDrain permeable pavement system show that this system is able to infiltrate rainwater and effectively be rejuvenated by the PaveDrainVacHead if it becomes clogged with sediment.” MONROE, WA REPORT WA-RD 852.1 VANCOUVER WA BOISE ID 79 80 81 82 83 84 15 ADA Compliant too!! Infiltration of 4,000 Inches per hour Storage within arch ADA compliant Interlocking Shape HS –20 / H20 loading Leed Credits Easily Installed Easily Maintained YouTube > 60 videos 85 86 87 88 89 90 16 Thought leadership BMP selection > 30 Agencies input Industry requests Identify potential issues CESCL training BMP Color Categories Perimeter Controls Slopes & Channels BMP Pocket Guide Manufactures Profile™ 91 92 93 94 95 96 17 Portland 503 771 5115 Medford 541 608 1648 Woodinville 425 415 6115 Fife 253 922 6641 Salt Lake City 801 521 5141 Saint George 435 272 3727 Idaho Falls 208 881 5070 Boise 208 863 7529 Anchorage 907 887 1707 ACFWest.com 97 98