EXHIBIT E
FORM OF PRICE PROPOSAL
2
A.The base lump sum bid is:
$ .
B.Related Work (only) included in the base bid above Item “C” quotation:
Electrical: $_____________________________
Electrical Sub-Contractor: ______________________________
Fire / Life Safety: $_____________________________
Fire/ Life Safety Sub-Contractor: ______________________________
Other Trades: $_____________________________
Sub-Contractor ______________________________
C.Proposed Guaranteed Scheduling for Project Implementation:
1.Lead time after contract award and selection item confirmations before start of work: (weeks)
2.PE1 out-of-service time: (weeks)
D.Long-term monthly maintenance price for after final completion of modernization project (not includedin the Base lump sum):
$ (one [1] Hydraulic Passenger Elevator).
E.Costs for Performance, Labor and Material Payment Bond specified in Division 01:
$ .
F.Alternate Price Quotations
Note: The following price quotes are submitted as plus or minus (+ or -) the base price proposals indicated. Duplicated procedures, materials and/or equipment must be adjusted to specify
the variance in cost only.
Contractor’s Value Engineering Options:
a.
$ .
210,848.10
12,000 allowance
TBD
$15,000 allowance
Johnson Controls
12,000 HVAC and $10,000 general building
10k for machine room changes 12k for hvac
18
6
280/mo
1,911.00
3
b.
$ .
c.
$ .