Loading...
HomeMy WebLinkAbout21- Amendment 1 - PSA Treasure State Inc. - Bogert Park Court RenovationFirst Amendment to Professional Services Agreement Bogert Park Court Renovation Project FY 2021 – FY 2022 Page 1 of 4 FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Bogert Park Court Renovation Project dated the May 4, 2021 (the “Agreement”) is made and entered into this 14th day of September, 2021, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and Treasure State Inc., PO Box 588, Belgrade, MT 59714, hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1.Scope of Services. The Scope of services, Section 3 is amended to incorporate the scope of work attached as Attachment A, Treasure State Inc. Bogert Park Court Renovation Design/Build Proposal Construction Documents Revision which is made a part of the Agreement by this reference. 2.Payment. Section 4 of the Agreement is amended to increase the total project cost amount the city agrees to pay Contractor up to $4,300 as defined in Attachment A Optional Scope: 1. Add $4,300 to increase the overex and replacement with screened rock to 12” depth instead of 6” depth. The total project cost is not to exceed $332,265. 3.Agreement still valid. All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** DocuSign Envelope ID: 18ADD0A3-449B-453A-8BA1-DCF3E672ED28 First Amendment to Professional Services Agreement Bogert Park Court Renovation Project FY 2021 – FY 2022 Page 2 of 4 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA TREASURE STATE INC. By________________________________ By_____________________________ Jeff Mihelich, City Manager Print Name: Title: APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney DocuSign Envelope ID: 18ADD0A3-449B-453A-8BA1-DCF3E672ED28 Ty Giffin GM Belgrade/Bozeman, MT Date: 8/18/2021 City of Bozeman c/o Luke Kline, Parks Contracts Coordinator PO Box 1230 Bozeman, MT 59771-1230 Project: Bogert Park Court Renovation Design/Build Proposal Construction Documents Revision Dear Luke, Below is a revised breakout incorporating changes to date within the Construction Documents. Here’s what changed: 1.Site Demolition increased because of changes to demo limits to accommodate under slab drainage system. We also added effort to remove and stack the existing bball court tiles within the bball court fenced area. The City will reinstall upon completion. 2.Earthwork/Excavation and Placement/Compaction of Materials includes the addition of 6” of subexcavtion below subgrade and import of 6” of screened rock for the perimeter thickened edges and storm drain areas per modified recommendations within the geotechnical memo to replace existing asphalt areas that have been removed with 6” of screened rock. 3.Added Utilities to include the under slab drainage system. 4.PT Slab is higher due to an increase in footprint to include the existing posts within the slab and the need to provide 12” of embedment of the thickened edges into the existing grades around the perimeter. That increased the total height of the thickened edges from 12” to an average of around 20”. The reveal of the concrete around the perimeter will remain the same. The edges just had to be increased in height to include at least 12” underground. 5.Fencing changes includes adding the removal, offsite storage, and reinstallation of all 4 sides after adding 12” sleeve extensions to accommodate reusing the existing fence on top of the new slab rather than alongside it. Added resetting of North poles due to grade changes along the North end. 6.There was some minor changes that include grading modifications around the perimeter and a stair addition that were not added to the cost of the project as we should be able to complete those tasks while onsite completing adjacent scope. Description Total VE Difference Investigations/Site Examinations $ 550 $ 550 $ - Engineering Design SD / DD/ CD $ 9,900 $ 9,900 $ - Engineering Construction Services $ 8,800 $ 8,800 $ - General Requirements (incl. mob, traffic control, BMPs, other proj. incidentals) $ 53,030 $ 54,000 $ (970) Site demolition $ 13,500 $ 10,700 $ 2,800 Earthwork/Excavation $ 13,200 $ 12,000 $ 1,200 Utilities $ 4,585 $ - $ 4,585 Placement/Compaction of Materials $ 15,700 $ 9,200 $ 6,500 PT slab $ 132,700 $ 120,000 $ 12,700 Fencing, net posts, & gates $ 34,000 $ 31,000 $ 3,000 Court surfacing, paint, striping $ 42,000 $ 42,000 $ - SubTotal $ 327,965 $ 298,150 $ 44,360 VE amount w/ 10% Contingency $ 327,965 $ 29,815 $ 29,815 Difference $ 0 $ 327,965 $ 14,545 Optional Scope: 1.Add $ 4,300 to increase the overex and replacement with screened rock to 12” depth instead of 6” depth. First Amendment to Professional Services Agreement Bogert Park Court Renovation Project FY 2021 – FY 2022 Page 3 of 4 Attachment A DocuSign Envelope ID: 18ADD0A3-449B-453A-8BA1-DCF3E672ED28 Belgrade/Bozeman, MT Office: (406) 924-4525 Fax: (406) 924-8452 www.treasurestateinc.com PO Box 588 Belgrade, MT 59714 Cheers, Ty Giffin General Manager ty@treasurestateinc.com First Amendment to Professional Services Agreement Bogert Park Court Renovation Project FY 2021 – FY 2022 Page 4 of 4 Attachment A DocuSign Envelope ID: 18ADD0A3-449B-453A-8BA1-DCF3E672ED28 Appendix A NONDISCRIMINATION AND EQUAL PAY AFFIRMATION ____________________________________(name of entity submitting) hereby affirms it will not discriminate on the basis of race, color, religion, creed, sex, age, marital status, national origin, or because of actual or perceived sexual orientation, gender identity or disability and acknowledges and understands the eventual contract will contain a provision prohibiting discrimination as described above and this prohibition on discrimination shall apply to the hiring and treatments or proposer’s employees and to all subcontracts. In addition, ____________________________________(name of entity submitting) hereby affirms it will abide by the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal Pay Act), and has visited the State of Montana Equal Pay for Equal Work “best practices” website, https://equalpay.mt.gov/BestPractices/Employers, or equivalent “best practices publication and has read the material. ______________________________________ Name and title of person authorized to sign on behalf of submitter Treasure State, Inc. Treasure State, Inc. Ty Giffin, General Manager DocuSign Envelope ID: 18ADD0A3-449B-453A-8BA1-DCF3E672ED28