Loading...
HomeMy WebLinkAboutPHASE PLAN 061121WS WS WS S S SS SS SS SSSSSS SS SSEEGG G GGGGEWS WS WS WS WS WS WS WS WS WS WS WS E E E E EGG GGG8 SS8 SS8 SS8 SS8 SS8 W8 W8 W8 W8 W8 W11"X17": 1"= 40 ftN GRAPHIC SCALE1 inch = ft.0( IN FEET )10202020HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2021VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\1204\001\ACAD\SHEETS\PHASING.dwg Plot Date: 6/10/2021 10:59 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONPH-11204.001GALLATIN PARK MIXED USE325 GALLATIN PARK DRIVEPHASE PLANJRM03/202106/11/21BOZEMANMONTANAPHASE 1PHASE 3PHASE 4PHASE 2PHASING NOTES:ALL UNDERGROUND UTILITIES, WATER SERVICES,SEWER SERVICES, ASPHALT FOR PARKING LOTAND APPROACHES ONTO GALLATIN PARK DRIVEWILL BE INSTALLED WITH PHASE 1.PHASE 1:INSTALLATION OF ALL WATER & SEWER SERVICES,POWER, GAS AND COMMUNICATIONS, STORMSWALE, TRASH ENCLOSURE, BOULDER RETAININGWALL, STORM SEPARATOR AND OUTLET, PARKINGLOT ASPHALT AND CURB, ACCESSES ONTOGALLATIN PARK DRIVE, STRIPING FOR A MINIMUMOF 8 SPACES ADJACENT TO PHASE 1 (CANINCLUDE ONSTREET), STRIPING OF HANDICAPSPACES. PHASE 1 WILL INCLUDE THE DUPLEXBUILDING ADJACENT TO GALLATIN PARK DRIVE ASWELL AS THE ADJACENT SIDEWALK, ONE BIKERACK, AND GARAGE APPROACHES ANDLANDSCAPING WITHIN THE PHASE 1 BOUNDARY,LANDSCAPING OF THE GALLATIN PARK DRIVEBOULEVARD, LANDSCAPING OF THE RESIDENTIALOPEN SPACE.PHASE 2:CONSTRUCTION OF THE FOUR-PLEX IN THEMIDDLE OF THE OF THE PROPERTY, ADJACENTSIDEWALK AND GARAGE ACCESSES, STRIPING OFMINIMUM OF 9 PARKING SPACES AS WELL ASCROSS WALKS AND SIDEWALKS NECESSARY TOACCESS THE SPACES, HANDICAP PARKING SIGNS,THE BIORETENTION POND, ONE BIKE RACK, BIKEREPAIR STATION, AND LANDSCAPING WITHIN THEPHASE 2 BOUNDARY.PHASE 3:CONSTRUCTION OF THE FOUR-PLEX IN THENORTHEAST CORNER OF THE SITE, ADJACENTSIDEWALK, STRIPING OF THE 10 SPACESADJACENT TO THE BUILDING, AND LANDSCAPINGWITHIN THE PHASE 3 BOUNDARY.PHASE 4:CONSTRUCTION OF THE TRI-PLEX BUILDING ONTHE NORTH SIDE OF THE PROPERTY, ADJACENTSIDEWALK AND GARAGE ACCESSES, STRIPING OFAT LEAST 8 PARKING SPACES, AND THE REMAININGLANDSCAPING WITHIN THE PHASE 4 BOUNDARY.BIORETENTION COMPLETED IN PHASE 2PHASE 1