Loading...
HomeMy WebLinkAboutC.7-STORM SEPARATOR DETAILS 061121HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2021VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\1204\001\ACAD\SHEETS\C-5-DETAILS.dwg Plot Date: 6/10/2021 6:56 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONC-71204.001GALLATIN PARK MIXED USE325 GALLATIN PARK DRIVEHYDRODYNAMIC SEPARATOR DETAILSJRM06/11/21BOZEMANMONTANAFINISH GRADE AROUND UNIT TOBE 1" ABOVE RIM TO CAPTURELOW FLOW INTO GRATE.REMAINING WATER IS TOOVERFLOW INTO ROCK AREA ANDFLOW TO EXISTING STORM POND.