March 17, 2021
Gallatin Park Mixed Use
Traffic Calculations
Below are the average daily trips and peak hour trips as calculated use the 8th edition of the ITE Trip
Generation Report.
Office = 11.03 ADT per 1000 sf
Manufacturing = 3.82 ADT per 1000 sf
Residential Condo = 5.81 ADT per Dwelling Unit
Office = 2,500 sf
Manufacturing – 9,419 sf
Residential Units = 13 units
Office = 2500sf/1000 x 11.03 ADT = 28 ADT
Manufacturing = 9419sf/1000 x 3.82 ADT = 36 ADT
Residential = 13 units x 5.81 ADT = 76 ADT
Total Proposed ADT = 135 ADT
Gallatin Park Subdivision Traffic Calcs
According to Appending D of the 1999 Gallatin Park Subdivision Design Report by TD&H, Gallatin Park Drive
(formerly Silverado Drive) was expected to see 4660 ADT. Twenty-nine lots within access Gallatin Park Drive,
which allows 160 trips per day per lot.
The proposed 135 ADT is less than the planned 160 ADT per the design report.
If you should have any questions, please do not hesitate to contact me at 581-5730.
Sincerely,
_________________
Jeremy May, P.E.
Headwaters Engineering, Inc.