Loading...
HomeMy WebLinkAbouttraffic summary-032321 190 NORTHSTAR LANE BOZEMAN, MT 59718 406-581-5730 www.headwatersmt.net Page 1 of 1 March 17, 2021 Gallatin Park Mixed Use Traffic Calculations Below are the average daily trips and peak hour trips as calculated use the 8th edition of the ITE Trip Generation Report. Office = 11.03 ADT per 1000 sf Manufacturing = 3.82 ADT per 1000 sf Residential Condo = 5.81 ADT per Dwelling Unit Office = 2,500 sf Manufacturing – 9,419 sf Residential Units = 13 units Office = 2500sf/1000 x 11.03 ADT = 28 ADT Manufacturing = 9419sf/1000 x 3.82 ADT = 36 ADT Residential = 13 units x 5.81 ADT = 76 ADT Total Proposed ADT = 135 ADT Gallatin Park Subdivision Traffic Calcs According to Appending D of the 1999 Gallatin Park Subdivision Design Report by TD&H, Gallatin Park Drive (formerly Silverado Drive) was expected to see 4660 ADT. Twenty-nine lots within access Gallatin Park Drive, which allows 160 trips per day per lot. The proposed 135 ADT is less than the planned 160 ADT per the design report. If you should have any questions, please do not hesitate to contact me at 581-5730. Sincerely, _________________ Jeremy May, P.E. Headwaters Engineering, Inc. H:\1204\001\DOCS\Siteplan\traffic summary.doc