Loading...
HomeMy WebLinkAboutEmail Correspondence NWE-0323213/17/2021 Headwaters Engineering Inc Mail - RE: [EXTERNAL] Re: 325 Gallatin Park Dr. Utility Route https://mail.google.com/mail/u/0?ik=1bad760de6&view=pt&search=all&permthid=thread-f%3A1693856715100085786%7Cmsg-f%3A1694430125258…1/6 Jeremy May <jmay@headwatersmt.net> RE: [EXTERNAL] Re: 325 Gallatin Park Dr. Utility Route 1 message Haag, Nicholas <Nicholas.Haag@contractor.northwestern.com>Tue, Mar 16, 2021 at 4:41 PM To: Jeremy May <jmay@headwatersmt.net>, Codey McDonald <cmcdonald@northforkbuilders.com> The easement is something we pursue on our end and it is part of the process when we design the project aer the customer agreement has been signed and project paid for. Hope this clarifies it for you. ______________________ Nick Haag Project Engineer Contractor for NorthWestern Energy nicholas.haag@contractor.northwestern.com C 406-581-8966 Construction Center 1-83-FOR-BUILD (1-833-672-8453) Apply Online at www.northwesternenergy.com/construction Net Meter Info click for info Tariffs and Rates click for info 24-Hour Service 888-467-2669 121 E Griffin Dr I Bozeman, MT 59715 From: Jeremy May <jmay@headwatersmt.net> Sent: Tuesday, March 16, 2021 4:21 PM To: Haag, Nicholas <Nicholas.Haag@contractor.northwestern.com>; Codey McDonald <cmcdonald@northforkbuilders.com> Subject: [EXTERNAL] Re: 325 Gallatin Park Dr. Ulity Route CAUTION: This Email is from an EXTERNAL source outside of NorthWestern Energy. The Original Sender of this email is jmay@headwatersmt.net. Are you expecting the message? Is this different from the message sender displayed above? Do not click on links or open attachments unless you are sure you recognize the sender and you know the contents are safe. If you believe the email to be malicious and/or phishing email, please use the Report Phish button. 3/17/2021 Headwaters Engineering Inc Mail - RE: [EXTERNAL] Re: 325 Gallatin Park Dr. Utility Route https://mail.google.com/mail/u/0?ik=1bad760de6&view=pt&search=all&permthid=thread-f%3A1693856715100085786%7Cmsg-f%3A1694430125258…2/6 Nick, Aached is an exhibit that shows the power alignment I was referring to on the phone. It includes the removal of the extra J-can on the north corner and shows the proposed 10' PUE. Let me know if you see any issues. Do you guys have a process to file a PUE for this lot, or do you just want us to do it and send you the easement (once an applicaon has been submied and contract figured out)? Thanks for taking the me to discuss today. Jeremy May, P.E. Headwaters Engineering, Inc. 190 Northstar Lane Bozeman, MT 59718 jmay@headwatersmt.net 406-581-5730 This communication is the property of Headwaters Engineering, Inc. and may contain confidential or privileged information. If you have received this communication in error, please notify the sender and delete the communication. On Tue, Mar 16, 2021 at 7:39 AM Jeremy May <jmay@headwatersmt.net> wrote: Nick, This might be easier to discuss on the phone, but is the juncon can needed on the north side? Can the line just run from the new j-can on the west side straight to the transformer between the two northeast buildings? Also, do you consider primary line, the line to any transformer? Finally, what size and type of conduit is needed for the power and gas to the buildings? Since it is under the parking lot, it is good to know in case installaon ming does not work out. Thanks, Jeremy May, P.E. Headwaters Engineering, Inc. 190 Northstar Lane