Loading...
HomeMy WebLinkAboutGroundwaterMonitoringData_05122021Date Time Measured By MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 House Well 4/2/2021 11:00 AM HTM NA NA NA NA NA NA NA No Data 4/7/2021 9:00 AM SLH NA NA NA NA NA NA 7.23 No Data 4/15/2021 6:00PM HTM NA NA NA NA NA NA NA No Data 5/5/2021 1:15 PM SLH NA NA NA NA NA NA 7.21 No Data 5/12/2021 1:15pm HTM NA NA NA NA NA NA 8.23 17.1 Depth to Groundwater from Ground Surface (feet) Groundwater Monitoring Results: SUMMARY WGM Group Refer to Geotechnical Report Project:Annie Subdivision Phase 4 Project Number:201016 Location:Refer to Test Pit Location Map Date Installed: Monitored By: