HomeMy WebLinkAboutGroundwaterMonitoringData_05122021Date Time Measured By MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 House Well
4/2/2021 11:00 AM HTM NA NA NA NA NA NA NA No Data
4/7/2021 9:00 AM SLH NA NA NA NA NA NA 7.23 No Data
4/15/2021 6:00PM HTM NA NA NA NA NA NA NA No Data
5/5/2021 1:15 PM SLH NA NA NA NA NA NA 7.21 No Data
5/12/2021 1:15pm HTM NA NA NA NA NA NA 8.23 17.1
Depth to Groundwater from Ground Surface (feet)
Groundwater Monitoring Results: SUMMARY
WGM Group
Refer to Geotechnical Report
Project:Annie Subdivision Phase 4
Project Number:201016
Location:Refer to Test Pit Location Map
Date Installed:
Monitored By: