Loading...
HomeMy WebLinkAboutArcadiaGardensSitePlan_01031995 I' AE PIMG,45.3 f sa•r 1� INS 4748.3_ I I•m. owe / � _ 1 \ �\ `� \ �=kETENTIGN POND A 1310'22" O=CULVERT R= 1290.00 a--S L=296.58 -0=GUY ANCHOR I � \\ ❑=CATCH BASIN PROPOSED SEWER DIRECTION OF SEWAGE FLOW m s PROPOSED WATER \�\ •,/�A_I JJ,I,A, \ �- -_ =EXISTING SEWER � �YIn--.JD" -�'- =EXISTING WATER SPILL CURB &GUTTER I �- LOCATION OF SEWER SERVICE LOCATION OF WATER SERVICE �+ \ _ - - \ ' =UTILITY EASEMENT LINE � „ _- r� /�u• � \ #C q# - _ � P y�S k \ =EXISTING CONTOUR I I --- `JJ�..-. ,mil`✓//N \\\\ e \ .tee =NEW CONTOUR i I SPOT ELEVATION a - a ..ave �- J./ma V \ /j ✓. #� �Xx\ �EUEftcEnCr -�\ e>a ACCESS = V. /\ \ DRAINAGE DIRECTION 2 RIM-475997 •aaaa / /�\ \ / s� �� ./'� \\ #� wV.=4750.18 s1174 I I #77 3 / R=5300031` ma .� on�st - f /4�°nc" u'w%old IRRIGATION I I _ + DITCH I $ w _ _ - - - a,., / ° /A� y� '° 1 s�'\r _ Z e3-•62A / / T 4RIM=4762.33 INV.=4757.37 —MAN � "`BAC1 CURB & GUTTER(DETAIL #2) N. ' ��..d� I II .- V I � ne i• m �'J qai I -- 4 BENCHMARK INFORMATION •a \ �' R \\, ,•� lti _ 530 BENCHMARK di e aPva"as"GE v , .+�,wDo NORTHWEST BOLT\ ) HYDRANT STAMPED B.M. =14958 ®INTERSECTION OFN22p4 AVENUE&POOLE DRIVE ELEVATION=4768.42(CITY OF BOZEMAN DATUM) co L _� rwfiflfNi(arttncu)( \ \'. \ -� BENCHMARK 3 NORTHWEST BOLT ON HYDRANT STAMPED B.M. - u• --- '� ` _-�_ \ - HALFWAY BETWEEN ANNIE STREET&POOLE DRIVE ON WEST SIDE OF 22ry2 AVENUE > 1-25' I ELEVATION=4767.13(CITY OF BOZEMAN DATUM) � BENCHMARK d3 NORTHWEST BOLT ON HYDRANT STAMPED B.M. III �a'i / / • 1� y - - I NORTHWEST CORNER OF PROJECT ON THE S AN 21 � SOUTH SIDE OF ANNIE STREET RIM 4764.48 ELEVATION= 4752.56(CITY OF BOZEMAN DATUM) F-I _ -ne kaeAA C� w'amJOm.oi'v-eve I 25' g ,INV.=4754.38 l r w w� rs - GAGE :;eM SITE IMPROVEMENT DATA I ,� F II 0Uo9M J �.. eaa O�\ I 1 20-2 BEDROOMS 110 UNITS 892 SOFT./EACH - 12-3 BEDROOMS 10 UNITS 7167 SOFT. EACH ri 370 PARKING STALLS m \ h m L 2.25 PARKING STALLS PER UNIT DEVELOPM{NT PARKING STALL SIZE 9'%18' so / IDENTIFICATION 10 HANDICAPPED PARKING STALLS 131X78' #26 u•/ \ S� ` '�L - d A �M• #1 TOTAL LOT 463,744 SOFT 100% .47 PAVEMENT 1 27 BUILDING FOOTPRINT 70.25 6 15 % s. so � 8 0 :iwio.as LANDSCAPED 250,276 SOFT.54% 'i I' pOATL� Ttf. RETENTION PONDS 15871 SOFT.X 1"DEPTH 3.4% r V••r• 111E THE CONTOURS SHOWN ARE OF EXISTING GROUND ®� IRRIGATION \ 5::......c5••.7O DITCH II _\Z _ q \.. ' NOTES: a7' �� .� 39' I / "''� / �/ f• \ -- ---- �w � �' Q ROLL OVER CURB TO BE PROVIDED AT THE ENO OF EACH PARKING AREA TO ENSURE ADEQUATE L qa °� I #�� w*" •4 •�`� -/ °b�' / / \ o: MANEUVERABILITY&SNOW REMOVAL. ALL PARKING SPACES WALL BE STRIPED W TH 4" STRIPING. .•4,•�' I I =^ / \\",�/� / \ "`'' I - >1 15'MIN.TYPICAL PRIVATE STREET CORNER RADIUS, .z ALL PARKING ALLEYS AND DRIVEWAYS WILL BE / 55 \ GRADED TO CA VALLEY DRAINS. SPILL CURB&GUTTER WILL BE PROVIDED AROUND ALL LANDSCAPE ISLANDS&DRIVE AISLES.(SEE DETAIL) CARE MUST BE TAKEN WHEN THE SECURITY LIGHTS 3 H I I ARE INSTALLED IN PHASE 5 TO ENSURE THAT LIGHT ci �� •" �/ ` ilae M""/'/) #� I I I IS NOT ILLUMINATED TOWARDS OURSTON ROAD '`\ \ / �� �L. I 'r' DROP CURB IS TO BE LOCATED AT ALL RETENTION `8 ` sO r�t? MH/22 PONDS. s /V/ #�� M"._ i _ RIM=4768.I 8 3 \ ,t4 INV.=4759149 GRADING AROUND ALL BUILDINGS SHALL HAVE #(( A 6"MIN.FROM FINISH FLOOR TO FINISH GRADE ?9. s r N y &6"OF FALL IN THE FIRST 10'AWAY FROM FOUNDATION. rU` CONTRACTOR TO FIELD ADJUST ELEVATIONS IN ACCORDANCE WITH FOUNDATION ELEVATION ELEVATION CRITERIA AS "6e -- ` SPECIFIED ABOVE. 20' WIDE UTILITY EASEMENT - -- ! BIKE PATH CONSTRUCTION SHALL BE 4'WIDE,2"OF ASPHALT _ AND 4"OF 1'PIT RUN AND CONSTRUCTED BY THE DEVELOPER IN CONJUNCTION NTH OTHER SITE IMP rI - N89'15'17'E SIDEWALK TO BE CONSTRUCTED I D u I — I I O MH DEPARTMENT OF PLANNING DURSTION STREET— AND COMMUNITY DE LOPMENT GASTON ENGINEERING & SURVEYING CONSULTING ENGINEERS & LAND SURVEYORS BOZEMAN, MONTANA ARCADIA GARDENS SITE PLAN REVISION:1-1- ,2-23-95 1-9 -22-95 4-4-95,5-9-95,A-26-95 DRAWN BY.' DATE. 1-3-95 CHECKED BY..- GG DRAKINC NO: 94-626-5 AS-CONSTRUCTED 7-95 94-626 SHEET 2 of 6 ti -