HomeMy WebLinkAboutPHASE I & II CONTRACT DOCUMENTS NOTICE TO PROCEED
TO: Nelcon Date: 1/30/89
-P.O. Box 2667 Project : Lyman Creek
Missoula, MT 59806 Water System Improvements
You are hereby notified to commence WORK in accordance with
the Agreement dated January 2 f 19 89 , on or before February 9
1989 , and you are to—complete the work within 90 consecutive
calendar days thereafter . The date of completion of all WORK is
therefore May 10 1989
Owner
BY
Title
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PRO-
CEED is hereby acknowledged by
this the day of
lg—.
By
Title
Notice to Proceed : Page 1 of 1
NOTICE OF AWARD
TO: Nelcon , Inc .
P .O. Box 2667
Missoula, MT 59806
PROJECT Description: _ Lyman Creek Water System Improvements
For City of Bozeman
The OWNER has considered the BID submitted by you for the
above described WORK in response to its Advertisement for Bids
dated 11-4 19 88 and Information for Bidders .
You are hereby notified that your BID has been accepted for
items in the amount of $ 633 , 379 . 90
You are required by the Information for Bidders to execute
the Agreement and furnish the required CONTRACTOR ' S Performance
BOND, Payment BOND, and certificates of insurance within ten (10 )
calendar days from the date of this Notice to you .
If you fail to execute said Agreement and to furnish said
BONDS within ten ( 10 ) days from the date of this Notice, said
OWNER will be entitled to consider all your rights arising out of
the OWNER' S acceptance of your BID as abondoned and as a forfeiture
of your BID BOND. The OWNER will be entitled to such other rights
as may be granted by law.
You are required to return an acknowledged copy of this
NOTICE OF AWARD to the OWNER.
Dated this 23rd day of December 19 88
City of Bozeman
0 e
By
City 1
Title City Manager
ACCEPTANCE OF NOTICE
Receipt of the above notice of award is hereby acknowledged
this the day of 19
By
Title
Notice of Award: Page 1 of 1
S/S/GENGINEERING
& SURVEYING
Consulting Engineers and Land Surveyors
P.O. Box 861
2010 North 7th Avenue
Bozeman, Montana 59715
(406) 586-0588
February 9 , 1989
W . O . #86-511-1
Mr . Richard Nelson
Nelcon Inc .
P . O . Box 2667
Missoula , MT 59806
RE Lyman Creek Water System
improvements
Dear Mr . Nelson :
In response to your letter of rebruary 7 , 1939 , requesting a
" Winter Shutdown " and in light of the present conditions on the
site , the elaspe of contract time is suspended as of February 9 ,
J.989 . This action is taken in accordance with the provision of
Section 15 of the General Conditions of the Contract Documents
dated January 2 , 1989 .
S/S/G Engineering & Surveying will monitor the conditions on the
site and provide advance notice to you ,,risen conditions are
suitable for construction .
As of February 9 , i989 there are 90 consecutive calendar days
remaining .
S.i-n c.e,r e 1 y
'Gerald M. Gast-on , P . E .
ACCEPTANCE OF NOTICE
Receipt of the above " WINTER SHUTDOWN "
is hereby acknowledged by :
thi s the 14 may of
1989
By :
Title
7 -
USF&G
MURAMM
STATUS INQUIRY
OWNER.OBLIGEE OR ORIGINATING CO.&ADDRESS
000110 0250
CITY OF BOZE MAN � DATE
P .0- BOX 640 04/30/90
B 0 Z E M A N OUR BOND NO.
MT 59771 28-0120-10502-89-6
REIN5URER'S NO,
CONTRACTOR
NELCON, INC . P -0. BOX 2667
ADDRESS MISSOULA MT
DESCRIPTION
OF
CONTRACT
LYMAN CREEK 'WATER SYSTEM IMPROVEMENTS
OWNER
CITY OF 3OZEMAN
CONTRACT PRICE PERFORMANCE BONG L&M PAYMENT BOND -T EFFECTIVE DATE
$633, 380 $633,380 1;633,380 O1/02/8,
WITHOUT PREJUDICING YOUR RIGHT OR AFFECTING OUR LIABILITY UNDER BOND(S)DESCRIBED ABOVE.
WE WOULD APPRECIATE SUCH OF THE FOLLOWING INFORMATION AS IS NOW AVAILABLE.
VERY TRULY YOURS.
BY
Robert T. Durand `'
APPROXIMATE DATE OF COMPLETION APPROXIMATE ACCEPTANCE FINAL CONTRACT PRICE
OF WORK(OR FINAL DELIVERY). DATE
1.IF CONTRACT COMPLETED,PLEASE STATE: S gs-0
2.IF CONTRACT UNCOMPLETED,PLEASE STATE: APPROXIMATE PERCENTAGE OR DOLLAR AMOUNT
OF CONTRACT COMPLETED ORDELIVERED
A
3.DO YOU KNOW OF ANY UNPAID BILLS FOR LABOR OR MATERIALS: ❑YES I NO
4.REMARKS;
It is understood that the information contained herein is furnished as
a matter of courtesy for the confidential use of the surety and is
merely an expression of opinion. It is also agreed that in furnishing
this information,no guaranty or warranty of accuracy or correctness is
made and no responsibility is assumed as a result of reliance by the
surety, whether such information is furnished by the owner or by an
architect or engineer as the agent of the owner.
PLEASE RETURN ORIGINAL OF THIS INQUIRY
IN ENCLOSED ENVELOPE TO: OWNER: 1.GL
(—USF✓;G INSURANCE
1 B.
8Y:
NAME: N EL E NA B• 0. SIGNAT
TITLE:
ADDRESS: P .0- BOX 6107 ,/l LHELENA, MT 59601 DATE: I(✓/ 27 .q6
GENERAL FORM STATUS INQUIRY THE LAN UAGE THIS FORM IS ACCEPTABLE TO THE
FEDERAL CASES TO BE SUBMITTED IN DUPLICATE. SURE ASSOCIATION OF AMERICA
STAMPED.ADDRESSED ENVELOPE TO BE ATTACHED.
FS 71(1-85)(HO)
ISSUE GATE(MMlOD/YY)
PRODUCER `
{ THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
"erry Payne & co . , Inc. NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT A6iEND,
f 0 . BOX 8747 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
12525 N . Reserve
{Missoula MT 59807-8747 COMPANIES AFFORDING COVERAGE
' I
6.
i COMPANY
LETTER A
mgany
INSURED COMPANY
LETTER
' C.Q n n e c t i
iNelcon, Inc . COMPANY ,.
; P .O . Box 2667 LETTER E+
I COMPANY —
Missoula MT 59806 LE fER
COMPANY
LETTER
THIS IS TO CERTIFY THAT POL CiES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED A13OVE FOR THE POLICY PERIOD INDICATED,`
NOTWITHSTANDING ANY Rc0UIRctaENT,TEkM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT',YITH RESPECT TO WHICH THIS CERTIFICATE MAY
of ISSUED OR MAY PERTAIN,THE iNSURANCE AFFORDED BY THE POLICIES DESCRIBE[)HEREIN IS SUoJECT TO ALL THE TERioS,EXCLUSIONS,AND CONDI-
TIONS OF SUCH POLICIES.
00
LTN TYPE OF Ih:SUR PfCc POLICY NUMBER-- 04IE FIiECnvE ?,,TC ENtO[i
DalE,r.11.,,L'O�Yt, u:�iEd.Ir.LliO ALL LIN,ITS IN THOUSAtJOS
GENERAL UAoILiTY --- —`
.. A ; c ,,,�Hc L cE,E;• L ,�I_IT, 1MP11096173000 01/01/89 01/01/90 l
A
�� 1ME11096173000
Q Q-0 f
_ ,
-----
t—
a� X �" 1MP11096173000 01 01 89 01 01 90
1 SCHEDULED AUTOS
HIRED AUTOS - -
%ON-0',7NED AUTOS � , �—
GARACH
EXCESS LI;.611-i fY
A X 1MP11096173000 01/01/89 01/01/90 2 , 000, 2, 000,
UThER Th,;N UMBRELLA FORi.t
B WCR,:ERS' 25 51 22 10/01/88 10/01/89 s7aTUTc» _
CGrdPcr�lS,;TIOP;
AND 100 ;EA r.�CCIDE`r)
EMPLOYERS'LIAc3ILITY Q_Q�
. �:�O 0 IOIJ`.h�C Eli(,M Ci1f'I.VitG
OTHER -- �
,
DESCRIPTION OF OPERATiONSi LOCATIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS Lyman Creek Water System—Tmprovement-
i
i
i ty of Bozeman SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX• t
ozeman, MT. 59715 PIRATION DATE THEREOF, THE ISSUING COMPANY WILL X,XXXXOCXX
and MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
S/S/G Engineering & Surveying %, LEFT, XKxXIXK�x } � �ryk
Xrl
P. O. Box 861 1 IXXx: XXXx•xxX;Xx;XXXX:X;X,XXX,�;xXk-:KXx-xx-iXAX.X-XjMs.
Bozeman, Montana 59715 f_jfAUTHORIZED REPRESENIATIVE -- —
t. Ter Payne . , Inc. (jm)
HOLDER-ID 013 ` 1 C
� z ISSUE DATE(MMIODIYY)
Fz , 09 27 89
PRODUCER
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
Terry Payne & Co . , Inc. NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND,
P .. O . Box $ 47 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
25 N . Reserve COMPANIES AFFORDING COVERAGE
VIISSoula MT 59807-8747
COMPANY
LETTERConnecticut Indemnity Co ,
COMPANY
INSURED LETTER
Nelcon, Inc . CO`.'PAN`,'
P . 0 . Box 2667 `—ER
Missoula MT 59806 _
i •LETTi ER
...i �� `� �^�TMga,� �, "' '� �+rn*-.+.vg+�;•u e'*'fi^' P'�a'sa' „ �� r+ ,� erc 4'.. y 7"'" a ^r^-n�'t`"�"{���' �xr� L'�,?T
THIS IS TO CERTIi Y THAT POLIO^ES CE fNSUPANCE LISTED BELOW HAS _,E I: SjFD TO :, N;V.1E9 AEO iE; CR yE?OL, Y P IIOD iNDICA T ED
NO T WI -iS i AN( INN • N'''RE0UIRF IEN'f,T A OR
1 R . . �. iOf ION OF N I 7f C,0 Hs RESPECT 71IS C_ATIFI T-M I
BE:S5 W .,. v ;E POL (L , ' i uiA L(S'i�ti$, 3?1D CC:N'�I.
3 T1(1, S
— ------.__ --— —--- ------- - _ ..--- --- —- -
_ W
A
XCESS_ASIL1T'Y
'.3'ORKE?S'CO41P=`dSA71ON I
r
1 A j �. .,, 318791 ;10/01/89 10/01/90 _5Q0
-,
_ n, �. ERS' LIABILITY y
�C1100
OTHE3
I I
I I
I
DESCRIPT'ON OF OPERATIONS;LOCATIONSIVEHICLES/RESTRICTIONS;SPECIAL ITEMS
Lyman Creek Water System Improvements
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX•
$/S/G Engineering & Surveying PIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
0 . BOX 861 MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
Zeman, MT 59715 _` LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
HOLDER-ID 002 �: f
Sj. �'�/�✓7-C r ,/,✓cam � !c��
�." 4 ' °.tia
CHANGE ORDER
Order No . One ( 1 ) _
Date : 4-28-89
Agreement Date : _1 -2 -89
NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 )
OWNER : City of Bozeman
CONTRACTOR : Nelcon Inc .
The following changes are hereby made to the CONTRACT DOCUMENTS :
Justification : Decrease the amount of water from S . Side to Lyman
Creek during June & July and gravel road access across new Dodge
property easement .
Change to CONTRACT PRICE :
Original CONTRACT PRICE : $633 , 379 . 90
Changes due to previous CHANGE ORDER : $_ _O . UO
Current CONTRACT PRICE adjusted by previous
CHANGE ORDER ( S ) : $633 , 379 . 90
The CONTRACT PRICE due to this CHANGE ORDER
will be increased by : S 12 ,900 . 00
The new CONTRACT PRICE including this
CHANGE ORDER will be $646 , 279 . 90
Change to CONTRACT TIME :
The CONTRACT TIME will be increased by -5- calendar days .
Original phases of completion still apply .
Approvals Required : ( Signatur indicates acceptance ) :
Contractor : , V
,
Project Engineer :
Public Works Director : r
City Manager : _
Change Order : Page 1 of
CHANGE ORDER #1
LYMAN CREEK WATER SYSTEM IMPROVEMENTS
W.O . 1#86-511-1
Page 2
INCREASE
ITEM UNIT TOTAL
NO. UNITS DESCRIPTION PRICE PRICE
115 760 CY 2" Minus Crushed Gravel Surface @ $ 12 .50/CY = $ 9,500.00
144 LUMP SUM Temporary Connection of Ex. -
Diversion to new Transmission
Main @ $ /LS = S 3,400 .00
TOTAL INCREASE $ 12 ,900 .00
Change Order: Page 2 of 2
CHANGE ORDER #,2`
Work :
16412 " Tee , Installed
12 " Plug , Installed
MJX Pipe Adaptor , Installed
Adaptor Pipe to VCP , Installed
12 " Pipe , Installed
CHANGE ORDER
Order No . Two ( 2)
Date : July 12 , 1989
Agreement Date : -2-89
NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 )
OWNER : City of Bozeman
CONTRACTOR : Nelcon , Inc .
The following changes are hereby made to the CONTRACT DOCUMENTS :
Justification :
See Attachment A
Change to CONTRACT PRICE :
Original CONTRACT PRICE : $633 , 379 . 90
Previous CHANGE ORDER total : $ 12 ,900 . 00
Current CONTRACT PRICE adjusted by previous
CHANGE ORDER( S ) : $646 , 279 . 90
The CONTRACT PRICE due to this CHANGE ORDER
will be increased by : $ 8 , 240 .80
The new CONTRACT PRICE including this
CHANGE ORDER will be $654 ,520 . 70
Change to CONTRACT TIME :
The CONTRACT TIME will be/ increased by -5- calendar days .
Approvals Required : ( Signatu indicates acceptance ) :
Contractor :
Project Engineer :
City Engineer : .
City Manager :
Change Order : Pagel of 2
ADD :
Item
No . Units Unit Total
Description Price____ _ Price
145 LS Remove Existing Vault , 2 , 100 . 00/LS 2 , 100 . 00
Replace 18 " Piping ,
Sleeve Floride &
Chlorine Line
146 LS Construct Lyman Creek 3 , 340 . 00/LS 3 , 340 . 00
Spring Access Road
147 LS Spring Excavation 2 , 230 . 00/LS 2 , 230 .00
148 LS 6 " X 12 " Reducer , 284 . 05/LS
12 " Coupling 284 . 00
149 LS Purchase 18 " Butterfly 1 , 959 . 00/LS 1 ,959 . 00
Va 1 ve
150 LS Excavation at Booster
Station & Backfill at 977 . 75/LS 977 , 75
18 " Valve
TOTAL ADDITIONAL $10 , 890 . 80
DELETE :
125 1 ea 18 " Butterfly Valve 2 , 650 . 00/EA 2 , 650 . 00
and Box
TOTAL DELETION $ 2 , 600 . 00
NET CHANGE TO CONTRACT ( INCREASE )
$ 8 , 240 . 00
Page 2 of 2
ATTACHMENT A
Item #
145 Revision requested by Water Department during
construction
146 Phase III work added to the Phase I & II contract .
& The road construction and spring excavation will allow
147 flow measurements at the spring .
148 Revision to the piping at the existing reservoir to
existing conditions .
125 , At the start of construction , the contractor performed
149 , the excavation to replace the existing 18- inch gate
& valve with an 18-inch Butterfly Valve , the existing
150 system valves were not able to isolate the area of the
valve to be replaced . The contractor was directed to
backfill the excavation without being able to complete
the item . The city has elected to purchase the valve
and will place it at a different location at a later d
CHANGE ORDER
Order No . Three ( 3 )
Date : Septem er 28 , 1989
Agreement Date : 1-2- 9
NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 )
OWNER : City of Bozeman
CONTRACTOR : Nelcon,,, Inc .
The following changes are hereby made to the CONTRACT DOCUMENTS :
Justification : Cover spring after flow measurement Include
washed gravelfill , filter fabric cover , soil cover , and cleanup .
Change to CONTRACT PRICE :
Original CONTRACT PRICE : $633 , 379 . 90
Previous CHANGE ORDER total : $ 21 , 140 . 80
Current CONTRACT PRICE adjusted by previous
CHANGE ORDER ( S ) : $654 , 520 . 70
The CONTRACT PRICE due to this CHANGE ORDER
will be increased by : $ 6 , 112 . 50
The new CONTRACT PRICE including th.is
CHANGE ORDER will be $660 , 633 . 20
Change to CONTRACT TIME :
The CONTRACT TIME will be increased by -5- calendar days .
Total Contract time is 110 days after this change order .
Approvals Required : ( Signature indicates acceptance ) :
Contractor :
Project Engineer :
City Engineer :
City Manager :
�#
Change Order : Page 1 of 2
ADD :
UNIT TOTAL
NO . UNITS DESCRIPTION PRICE PRICE
151 LS Spring closure , gravel ,
fabric , native material
cover and clean up 6 , 112 . 50
TOTAL ADDITIONAL $6 , 112 . 50
Change Order : Page 2 of 2
t I EIVIF U
i� S E P 2 7 1989
proliect
l+ September 27 , 1989 �{
Mr. Paul Kinshella, P. E. v
CONTRACTOR$ Gaston Engineering/Surveying
P.O.Box 2667 P. 0. Box 861
Missoula, MT59806 Bozeman, Montana 59715
Re: Lyman Creek Water
System
CHANGE ORDER NO. 4
SPRING EXCAVATION
246 CY 3-Inch Minus $ 2 , 460. 00
8 hrs. Supt. @ $35./hr. 280. 00
Equipment
11 . 5 hrs. gravel
placement $65./hr. 747 . 50
10 hrs. topsoil cover
& cleanup $65 ./hr. 650. 00
Filter Fabric 200. 00
$ 4 , 337 . 50
Paint Building $ 605. 00
Electrical Disconnect 390. 00
Guard Posts 400. 00
6x12 Reducer
Laborer 2 hr. @ $35.hr.
2 hr. @ $30./hr 130. 00
1, 525 . 00
20 CY 2-inch Road Mix $ 250 . 00
$ 250 . 00
$ 6, 112 . 50
We are requesting five extra days construction time.
Respectfully,
Glen Stensrud �
GS/mac
4061721.1733
ADDENDUM NUMBER 1
Lyman Creek Water System Improvements
For
City of Bozeman
The following changes shall be noted on the constuction specifica-
tions and/or drawings and shall be noted by all interested bidders
on the bid schedule (complete front page of bid schedule ) .
Specifications :
1 . Add new revised Bid Schedule-enclosed.
2 . Add Paragraph 8 on SP-7 as follows :
8 . Construction Limits :
The construction limit for the 16 " DIP Water Main from station
0 + 00 to 9 + 00 shall be 100 feet wide centered on the pro-
posed water main alignment . The contractor shall not disturb
any area outside of this area . The contractor shall route all
equipment and material on this construction limit from the 9 +
00 plus stationing . Any rock or material that falls or rolls
out of the easement shall be retrieved by equipment that mini-
mizes the tracking of the area. All disturbed area on the
Station 0 + 00 to 9 + 00 shall be returned to original con-
tours and reseeded to pasture grass mix. The remainder of the
line ( 9 + 00 to 61 + 00 ) shall have limits of ,100 feet cen-
tered on the water line . Access material and equipment
storage shall be as designated by the Engineer .
3 . Delete paragraph 07 . C. 4 ) ( 5 ) & ( 6 ) of Section 15-C requiring
bacterial testing .
4 . Special Conditions 1 Schedule of Occupation etc . The wage
rates for this contract are amended to include modification 1
and 3 . Contractor is required to use the latest applicable
wage rates .
5 . Section 16-D page 4 - delete paragraph E.
Construction Drawings :
1 . Sheet 8 of 14
A ) On the Pressure Reducing Vault :
1 . The height of the walls shall be 9 feet .
2 . The 16 " x 8 " reducers shall be flange by flange, not
mechanical joint .
3 . The insulated covers shall have 2" x 6 " joists on 16 "
centers or less .
B ) On the Drain Outlet , the depth of 24" diameter RCP shall
be 2 feet .
Addendum 1
Lyman Creek
Page 2
2 . Sheet 5 of 14 .
A ) On the Inlet Control Structure, and the control valve
vault , change the access lid from a Neenah R 1872 to a
Caird 52441, MCI 305 or IFCO 772 .
B) On the insulated wood panel covers the 2 " x 61' joints
shall not exceed 16 " center to center .
NOTE: This addendum must be acknowledged by signature on the
front sheet of the bic proposal sheet .
Contractor
BY:
Set Number
ADDENDUM NUMBER 2
Lyman Creek Water System Improvements
For
City of Bozeman
The following changes shall be noted on the constuction specifica-
tions and/or drawings and shall be noted by all interested bidders
on the bid schedule (complete front page of bid schedule ) .
Specifications :
1 . Add new revised page 4 of 4 of the Bid Schedule . This item
includes all work associated with the removal of the existing
floride equipment and the installation of the new floride
equipment .
2 . Special Provisions page SP-5 paragraph w. Change the last
sentence from "not including gate valve and boxes" to
"including gate valves and boxes . "
NOTE : This addendum must be acknowledged by signature on the
front sheet of the bid proposal sheet .
Contractor
BY :
Set Number
BID
Proposal of , (hereinafter
called "BIDDER" ) , organized and existing under the laws of the
State of doing business as _
To the _ City of Bozeman
(hereinafter called "OWNER" ) .
In compliance with your Advertisement for Bids , BIDDER hereby
proposes to perform all WORK for the construction of Lyman
Creek Water System Improvements_
in strict accordance with the CONTRACT DOCUMENTS, within the time
set forth therein , and at prices stated below.
By submission of this BID, each BIDDER certifies , and in the
case of a joint BID each party thereto certifies as to his own or-
ganization , that this BID has been arrived at independently,
without consultation, communication, or agreement as to any matter
relating to this BID with any other BIDDER or with any competitor .
BIDDER hereby agrees to commence WORK under this contract on
or before a date to be specified in the NOTICE TO PROCEED and to
fully complete the PROJECT within 90 — consecutive calendar
days thereafter . BIDDER FURTHER AGREES TO PAY AS LIQUIDATED
DAMAGES, THE SUM OF $ 400 . 00 for each consecutive calendar day
thereafter as provided in Section 15 of the General Conditions .
BIDDER acknowledges receipt of the following ADDENDUM:
*Insert "a corporation" , "a partnership" , or "an indi-
vidual" as applicable.
BID: Page 1 of 4
BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for
the following unit prices or lump sum:
WATER SYSTEM IMPROVEMENTS
LYMAN CREEK
BID SCHEDULE
NOTE: BIDS shall include sales tax and all other applicable taxes and fees.
ITEM UNIT TOTAL
NO. UNITS DESCRIPTION PRICE PRICE
101 7885 CY 'Type 1 'Trench Excavation and
Type A Backfill @ $ /Cy = $
102 100 CY Type 2 Trench Excavation and
Type A Backfill @ $ /CY = $
103 8 HR Exploratory Excavation @ $ /HR = $
104 500 CY Type 2 Pipe Bedding @ $ /Cy = $
105 6114 IF 16-Inch Class 52 Ductile
Iron Pipe @ $ /LF = $
106 185 LF 4-Inch Class 52 Ductile
Iron Pipe @ $ /LF = $
107 27 EA 16-Inch Bends, 17-11jo,
7-2210, and 3-450 @ $ /EA = $
108 3 EA 16 x 16 x 16-Inch Tee @ $ /EA = $
109 1 EA 16 x 16 x 6-Inch Tee @ $ /F-A = $
110 2 EA Pressure Reducing Vaults
and Piping @ $ /EA = $
111 1 EA Connection to Existing 18-
Inch Asbestos Cen-ent Water
Line @ $ /EA = $
112 1900 LF Surface Restoration and
Reseeding @ $ /LF = $
113 4214 IF Road Subgrade Construction @ $
114 2 EA Drain Outlets (24-Inch RCP) @ $ /EA = $
BID: Page 2 of 4
ITEM UNIT TOTAL
NO. UNITS DESCRIPTION PRICE PRICE
115 1115 CY 2-Inch Minus Crushed Gravel Road
and Turnaround Surfacing @ $ ICY = $
116 40 LF Connection to Diversion
Structure with 16-inch DIP @ $ $
117 1000 CY Diversion Dike Construction @ $ /CY = $
118 1000 CY Pond Excavation @ $ /CY = $
119 LUMP SUM Diversion Structure Concrete @ $ /LS = $
120 1 EA Diversion Vacuum Air-Relief
Vault and Valves @ $ /F-A _ $
121 96 IF 12-Inch CSP Drain Pipe @ $ _ /LF = $
122 160 CY 1-Foot Mean Diameter Rip Rap @ $ /CY = $ —
123 70 LF 30-Inch CSP @ $ __ /LF _ $ —
124 68 LF 16-Inch DIP Diversion Drain @ $ /LF = $
125 1 EA 16-Inch Butterfly Valve and box @ $ /EA _ $
125A 1 EA 1.8-Inch Butterfly Valve and box @ $ /LA = $
126 10 EA Bentonite Cutoff walls @ $ /EA _ $
127 LUMP SUM Pipe Gallery @ $ _ $
128 LUMP SUM Inlet Control Structure @ $ /LS = $
129 LUMP SUM Control Valve Vault @ $ /LS = $
130 LUMP SUM Major Yard Piping @ $ /LS = $
131 LUMP SUM Reservoir Cutlet Control
Structure @ $ /LS = $
132 LUMP SUM Chlorine Building @ $ /LS = $
133 LUMP SUM Electrical & Control Wiring @ $ /LS _ $
134 LUMP SUM Control & Instrument Equipment @ $ /Is = $
135 LUMP SUM Chlorination System @ $ /IS = $
136 LUMP SUM Plant Water & Drainage System @ $ /LS = $ —
BID: Page 3 of 4
ITEM UN IT TOTAL
NO. UNITS DESCRIPTION PRICE PRICE
137 LUMP SUM Northside Booster Station
Irrprovements @ $ /LS = $
138 LUMP SUM Floating Reservoir Cover @ $ /IS = $
139 LUMP SUM Site Grading & Surface Gravel @ $ /IS = $_!
140 350 LF Fencing @ $ /LF = $
141 LS Floride System. Remove existing equipment
and install new equipment @ $ /LS = $
142 Minor Yara Piping (Ccnplete
in Place)
a) 350 LF 12-inch PVC Plater Line @ $
b) 2 EA Freezeless Hydrants @ $ /EA = $
c) 2 EA 12-inch Gate Valves @ $ /EA = $
d) 160 LF 3/4-inch PVC Water Line @ $ /LE' _ $
e) 50 LF 3/4-inch Copper water Line @ $ ILIF _ $
r ) 35 LF 12-inch Ccpper water Line @ $ _/LE = $ _
g) 1 EA 3/4-inch Corp Stop @ $ /EA = $ _
h) 1 EA 12-inch Corp Stop @ $ /EA = $
143 1 EA Spare Equipment @ $ /EA = $
TOTAL BID $
figures
words
Respectfully submitted:
BY:
Signature Address
Title Date
License Number (if applicable)
(SEAL - if BID is by a corporation)
ATTEST
BID: Page 4 of 4
PLAN HOLDERS JST for LYW�N, CREEK
(as of lb�-,ember 2, 1988)
Billings Builders Exchange HoL-zi Sutherland
2024 3rd Ave. N. Box 578
Billings Mr 59101 Billings, Mr 59103
Butte Builders Exchange �rthwest Pipe, & Fitting
1230 Harrison Box 1258
Butte, KP 59701 Billings, 1,2 5910"
Great Falls Builders Exchange Phillip Forbes-Dir of Pub Works
Box 2027 Box 40
Great Falls, MT 59403 Bozeman, Mr 59714
Plan Librarl/Builders F/charc7e C4 Neal Corp
601 tiv Vil and 1630 Lily Ave
Bozeman, INIT 59715 El Ca. on, CA92021
,14ontana Contractors' Asscc. Warrer, M--vars
Boy. 4519 1420 L*i-Gilman suite 216-1
heiena, L',T 59604 Issam-Ih, v�A 98027
`*�Iissoula Builders Lccllhang,,�� 'U'S Pine- & Foundar�,7
P.O. Box 3109 630D Southcenter Blvd Suit-e 201
114issoula, ,,T 59715 Tukwila,'
1-�A 98188
SISIG Engineering Falls
Box 8 6 lSt & giver. Driv-=
Bcze-z.ra,n, Mr 59715 Grs-,t Fall, -,'4f 59401
Pioneer Readv t-Iix a-a- Ccnst
North '7t�-i A�7e 1GU S 32n-I Sz. Wvzst
N2 -9-10-1
Bozeman, %2 :59715 c
' in --, I
SLme Construct-icr. Don -,::I It n g
485 �achariah !-- lox 716
Bozaman, 11CLO 59715: I%ff 59644
Gilman Excavazi= a- 'Con
ssc(:-- te-d G-ner:,! -�-crs
Butte, NT 501701 3ox 'i266
ichnston zl;IcaVaticn
505 Blau: ire PL 'vzater 4crks Sale
Eozeman, %11, 5,9715 4295 Kea-rnev
F-
Clause -avation De n 1',er, C-0 -0216
848 LMain Su-L ta 23 Treat=ent 'EcpmLp-m--nt
Billings, mll :191c ;
-.! - x 1349
L-a=.an Co-struct-Ion .,nancond,a, IMP 59711
Box 6427 C4, Ccnstr,,.:cft ion
59406 Box 279
Lincoln, 59639
2,3x 2667 a��arstar
M. sczouia, `"!P 39805
R.0 8x 2-1-349
Dana -,,\ejnsr nil 1 iA:.'q S, r,I-T' 5 9-!'j 4
Sol' 23167
c-cce
Billings, -Nal' -7-9101
Coo Cons.. 59104
Bi
'2ox llincs,], R. ii. Srbov;�-ir
04 2ox 4410
, D-910
Barnard
Ccnsz. Soze--�em, -�T 597-:2
103 Cc=. .e---:-ia1 1-1'r Chet Sons
-"T ''50�;715 Bcx 1055
Service -Ic Lew:Lstown, M11, 3,94-57
BOY, 11916 Kenny Cons--rIUC::i--:I
Bozeman, °,LTI 59715 aDx 330
Hardin, -'�:T 59034
Coleman Const tz i nq ar Z--;ectr;Lc
2600 Webstar Lane 9(;7 8r4da-3r Dr.
Dillon, L�Ir -5-9725 Bcze��,an,-k"I-L 59713