HomeMy WebLinkAboutPHASE I & II CONTRACT DOCUMENTS NOTICE TO PROCEED TO: Nelcon Date: 1/30/89 -P.O. Box 2667 Project : Lyman Creek Missoula, MT 59806 Water System Improvements You are hereby notified to commence WORK in accordance with the Agreement dated January 2 f 19 89 , on or before February 9 1989 , and you are to—complete the work within 90 consecutive calendar days thereafter . The date of completion of all WORK is therefore May 10 1989 Owner BY Title ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PRO- CEED is hereby acknowledged by this the day of lg—. By Title Notice to Proceed : Page 1 of 1 NOTICE OF AWARD TO: Nelcon , Inc . P .O. Box 2667 Missoula, MT 59806 PROJECT Description: _ Lyman Creek Water System Improvements For City of Bozeman The OWNER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids dated 11-4 19 88 and Information for Bidders . You are hereby notified that your BID has been accepted for items in the amount of $ 633 , 379 . 90 You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR ' S Performance BOND, Payment BOND, and certificates of insurance within ten (10 ) calendar days from the date of this Notice to you . If you fail to execute said Agreement and to furnish said BONDS within ten ( 10 ) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER' S acceptance of your BID as abondoned and as a forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER. Dated this 23rd day of December 19 88 City of Bozeman 0 e By City 1 Title City Manager ACCEPTANCE OF NOTICE Receipt of the above notice of award is hereby acknowledged this the day of 19 By Title Notice of Award: Page 1 of 1 S/S/GENGINEERING & SURVEYING Consulting Engineers and Land Surveyors P.O. Box 861 2010 North 7th Avenue Bozeman, Montana 59715 (406) 586-0588 February 9 , 1989 W . O . #86-511-1 Mr . Richard Nelson Nelcon Inc . P . O . Box 2667 Missoula , MT 59806 RE Lyman Creek Water System improvements Dear Mr . Nelson : In response to your letter of rebruary 7 , 1939 , requesting a " Winter Shutdown " and in light of the present conditions on the site , the elaspe of contract time is suspended as of February 9 , J.989 . This action is taken in accordance with the provision of Section 15 of the General Conditions of the Contract Documents dated January 2 , 1989 . S/S/G Engineering & Surveying will monitor the conditions on the site and provide advance notice to you ,,risen conditions are suitable for construction . As of February 9 , i989 there are 90 consecutive calendar days remaining . S.i-n c.e,r e 1 y 'Gerald M. Gast-on , P . E . ACCEPTANCE OF NOTICE Receipt of the above " WINTER SHUTDOWN " is hereby acknowledged by : thi s the 14 may of 1989 By : Title 7 - USF&G MURAMM STATUS INQUIRY OWNER.OBLIGEE OR ORIGINATING CO.&ADDRESS 000110 0250 CITY OF BOZE MAN � DATE P .0- BOX 640 04/30/90 B 0 Z E M A N OUR BOND NO. MT 59771 28-0120-10502-89-6 REIN5URER'S NO, CONTRACTOR NELCON, INC . P -0. BOX 2667 ADDRESS MISSOULA MT DESCRIPTION OF CONTRACT LYMAN CREEK 'WATER SYSTEM IMPROVEMENTS OWNER CITY OF 3OZEMAN CONTRACT PRICE PERFORMANCE BONG L&M PAYMENT BOND -T EFFECTIVE DATE $633, 380 $633,380 1;633,380 O1/02/8, WITHOUT PREJUDICING YOUR RIGHT OR AFFECTING OUR LIABILITY UNDER BOND(S)DESCRIBED ABOVE. WE WOULD APPRECIATE SUCH OF THE FOLLOWING INFORMATION AS IS NOW AVAILABLE. VERY TRULY YOURS. BY Robert T. Durand `' APPROXIMATE DATE OF COMPLETION APPROXIMATE ACCEPTANCE FINAL CONTRACT PRICE OF WORK(OR FINAL DELIVERY). DATE 1.IF CONTRACT COMPLETED,PLEASE STATE: S gs-0 2.IF CONTRACT UNCOMPLETED,PLEASE STATE: APPROXIMATE PERCENTAGE OR DOLLAR AMOUNT OF CONTRACT COMPLETED ORDELIVERED A 3.DO YOU KNOW OF ANY UNPAID BILLS FOR LABOR OR MATERIALS: ❑YES I NO 4.REMARKS; It is understood that the information contained herein is furnished as a matter of courtesy for the confidential use of the surety and is merely an expression of opinion. It is also agreed that in furnishing this information,no guaranty or warranty of accuracy or correctness is made and no responsibility is assumed as a result of reliance by the surety, whether such information is furnished by the owner or by an architect or engineer as the agent of the owner. PLEASE RETURN ORIGINAL OF THIS INQUIRY IN ENCLOSED ENVELOPE TO: OWNER: 1.GL (—USF✓;G INSURANCE 1 B. 8Y: NAME: N EL E NA B• 0. SIGNAT TITLE: ADDRESS: P .0- BOX 6107 ,/l LHELENA, MT 59601 DATE: I(✓/ 27 .q6 GENERAL FORM STATUS INQUIRY THE LAN UAGE THIS FORM IS ACCEPTABLE TO THE FEDERAL CASES TO BE SUBMITTED IN DUPLICATE. SURE ASSOCIATION OF AMERICA STAMPED.ADDRESSED ENVELOPE TO BE ATTACHED. FS 71(1-85)(HO) ISSUE GATE(MMlOD/YY) PRODUCER ` { THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS "erry Payne & co . , Inc. NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT A6iEND, f 0 . BOX 8747 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 12525 N . Reserve {Missoula MT 59807-8747 COMPANIES AFFORDING COVERAGE ' I 6. i COMPANY LETTER A mgany INSURED COMPANY LETTER ' C.Q n n e c t i iNelcon, Inc . COMPANY ,. ; P .O . Box 2667 LETTER E+ I COMPANY — Missoula MT 59806 LE fER COMPANY LETTER THIS IS TO CERTIFY THAT POL CiES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED A13OVE FOR THE POLICY PERIOD INDICATED,` NOTWITHSTANDING ANY Rc0UIRctaENT,TEkM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT',YITH RESPECT TO WHICH THIS CERTIFICATE MAY of ISSUED OR MAY PERTAIN,THE iNSURANCE AFFORDED BY THE POLICIES DESCRIBE[)HEREIN IS SUoJECT TO ALL THE TERioS,EXCLUSIONS,AND CONDI- TIONS OF SUCH POLICIES. 00 LTN TYPE OF Ih:SUR PfCc POLICY NUMBER-- 04IE FIiECnvE ?,,TC ENtO[i DalE,r.11.,,L'O�Yt, u:�iEd.Ir.LliO ALL LIN,ITS IN THOUSAtJOS GENERAL UAoILiTY --- —` .. A ; c ,,,�Hc L cE,E;• L ,�I_IT, 1MP11096173000 01/01/89 01/01/90 l A �� 1ME11096173000 Q Q-0 f _ , ----- t— a� X �" 1MP11096173000 01 01 89 01 01 90 1 SCHEDULED AUTOS HIRED AUTOS - - %ON-0',7NED AUTOS � , �— GARACH EXCESS LI;.611-i fY A X 1MP11096173000 01/01/89 01/01/90 2 , 000, 2, 000, UThER Th,;N UMBRELLA FORi.t B WCR,:ERS' 25 51 22 10/01/88 10/01/89 s7aTUTc» _ CGrdPcr�lS,;TIOP; AND 100 ;EA r.�CCIDE`r) EMPLOYERS'LIAc3ILITY Q_Q� . �:�O 0 IOIJ`.h�C Eli(,M Ci1f'I.VitG OTHER -- � , DESCRIPTION OF OPERATiONSi LOCATIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS Lyman Creek Water System—Tmprovement- i i i ty of Bozeman SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX• t ozeman, MT. 59715 PIRATION DATE THEREOF, THE ISSUING COMPANY WILL X,XXXXOCXX and MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE S/S/G Engineering & Surveying %, LEFT, XKxXIXK�x } � �ryk Xrl P. O. Box 861 1 IXXx: XXXx•xxX;Xx;XXXX:X;X,XXX,�;xXk-:KXx-xx-iXAX.X-XjMs. Bozeman, Montana 59715 f_jfAUTHORIZED REPRESENIATIVE -- — t. Ter Payne . , Inc. (jm) HOLDER-ID 013 ` 1 C � z ISSUE DATE(MMIODIYY) Fz , 09 27 89 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS Terry Payne & Co . , Inc. NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND, P .. O . Box $ 47 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 25 N . Reserve COMPANIES AFFORDING COVERAGE VIISSoula MT 59807-8747 COMPANY LETTERConnecticut Indemnity Co , COMPANY INSURED LETTER Nelcon, Inc . CO`.'PAN`,' P . 0 . Box 2667 `—ER Missoula MT 59806 _ i •LETTi ER ...i �� `� �^�TMga,� �, "' '� �+rn*-.+.vg+�;•u e'*'fi^' P'�a'sa' „ �� r+ ,� erc 4'.. y 7"'" a ^r^-n�'t`"�"{���' �xr� L'�,?T THIS IS TO CERTIi Y THAT POLIO^ES CE fNSUPANCE LISTED BELOW HAS _,E I: SjFD TO :, N;V.1E9 AEO iE; CR yE?OL, Y P IIOD iNDICA T ED NO T WI -iS i AN( INN • N'''RE0UIRF IEN'f,T A OR 1 R . . �. iOf ION OF N I 7f C,0 Hs RESPECT 71IS C_ATIFI T-M I BE:S5 W .,. v ;E POL (L , ' i uiA L(S'i�ti$, 3?1D CC:N'�I. 3 T1(1, S — ------.__ --— —--- ------- - _ ..--- --- —- - _ W A XCESS_ASIL1T'Y '.3'ORKE?S'CO41P=`dSA71ON I r 1 A j �. .,, 318791 ;10/01/89 10/01/90 _5Q0 -, _ n, �. ERS' LIABILITY y �C1100 OTHE3 I I I I I DESCRIPT'ON OF OPERATIONS;LOCATIONSIVEHICLES/RESTRICTIONS;SPECIAL ITEMS Lyman Creek Water System Improvements SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX• $/S/G Engineering & Surveying PIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO 0 . BOX 861 MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE Zeman, MT 59715 _` LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE HOLDER-ID 002 �: f Sj. �'�/�✓7-C r ,/,✓cam � !c�� �." 4 ' °.tia CHANGE ORDER Order No . One ( 1 ) _ Date : 4-28-89 Agreement Date : _1 -2 -89 NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 ) OWNER : City of Bozeman CONTRACTOR : Nelcon Inc . The following changes are hereby made to the CONTRACT DOCUMENTS : Justification : Decrease the amount of water from S . Side to Lyman Creek during June & July and gravel road access across new Dodge property easement . Change to CONTRACT PRICE : Original CONTRACT PRICE : $633 , 379 . 90 Changes due to previous CHANGE ORDER : $_ _O . UO Current CONTRACT PRICE adjusted by previous CHANGE ORDER ( S ) : $633 , 379 . 90 The CONTRACT PRICE due to this CHANGE ORDER will be increased by : S 12 ,900 . 00 The new CONTRACT PRICE including this CHANGE ORDER will be $646 , 279 . 90 Change to CONTRACT TIME : The CONTRACT TIME will be increased by -5- calendar days . Original phases of completion still apply . Approvals Required : ( Signatur indicates acceptance ) : Contractor : , V , Project Engineer : Public Works Director : r City Manager : _ Change Order : Page 1 of CHANGE ORDER #1 LYMAN CREEK WATER SYSTEM IMPROVEMENTS W.O . 1#86-511-1 Page 2 INCREASE ITEM UNIT TOTAL NO. UNITS DESCRIPTION PRICE PRICE 115 760 CY 2" Minus Crushed Gravel Surface @ $ 12 .50/CY = $ 9,500.00 144 LUMP SUM Temporary Connection of Ex. - Diversion to new Transmission Main @ $ /LS = S 3,400 .00 TOTAL INCREASE $ 12 ,900 .00 Change Order: Page 2 of 2 CHANGE ORDER #,2` Work : 16412 " Tee , Installed 12 " Plug , Installed MJX Pipe Adaptor , Installed Adaptor Pipe to VCP , Installed 12 " Pipe , Installed CHANGE ORDER Order No . Two ( 2) Date : July 12 , 1989 Agreement Date : -2-89 NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 ) OWNER : City of Bozeman CONTRACTOR : Nelcon , Inc . The following changes are hereby made to the CONTRACT DOCUMENTS : Justification : See Attachment A Change to CONTRACT PRICE : Original CONTRACT PRICE : $633 , 379 . 90 Previous CHANGE ORDER total : $ 12 ,900 . 00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER( S ) : $646 , 279 . 90 The CONTRACT PRICE due to this CHANGE ORDER will be increased by : $ 8 , 240 .80 The new CONTRACT PRICE including this CHANGE ORDER will be $654 ,520 . 70 Change to CONTRACT TIME : The CONTRACT TIME will be/ increased by -5- calendar days . Approvals Required : ( Signatu indicates acceptance ) : Contractor : Project Engineer : City Engineer : . City Manager : Change Order : Pagel of 2 ADD : Item No . Units Unit Total Description Price____ _ Price 145 LS Remove Existing Vault , 2 , 100 . 00/LS 2 , 100 . 00 Replace 18 " Piping , Sleeve Floride & Chlorine Line 146 LS Construct Lyman Creek 3 , 340 . 00/LS 3 , 340 . 00 Spring Access Road 147 LS Spring Excavation 2 , 230 . 00/LS 2 , 230 .00 148 LS 6 " X 12 " Reducer , 284 . 05/LS 12 " Coupling 284 . 00 149 LS Purchase 18 " Butterfly 1 , 959 . 00/LS 1 ,959 . 00 Va 1 ve 150 LS Excavation at Booster Station & Backfill at 977 . 75/LS 977 , 75 18 " Valve TOTAL ADDITIONAL $10 , 890 . 80 DELETE : 125 1 ea 18 " Butterfly Valve 2 , 650 . 00/EA 2 , 650 . 00 and Box TOTAL DELETION $ 2 , 600 . 00 NET CHANGE TO CONTRACT ( INCREASE ) $ 8 , 240 . 00 Page 2 of 2 ATTACHMENT A Item # 145 Revision requested by Water Department during construction 146 Phase III work added to the Phase I & II contract . & The road construction and spring excavation will allow 147 flow measurements at the spring . 148 Revision to the piping at the existing reservoir to existing conditions . 125 , At the start of construction , the contractor performed 149 , the excavation to replace the existing 18- inch gate & valve with an 18-inch Butterfly Valve , the existing 150 system valves were not able to isolate the area of the valve to be replaced . The contractor was directed to backfill the excavation without being able to complete the item . The city has elected to purchase the valve and will place it at a different location at a later d CHANGE ORDER Order No . Three ( 3 ) Date : Septem er 28 , 1989 Agreement Date : 1-2- 9 NAME OF PROJECT : Lyman Creek Water System Improvements ( 86-511 -1 ) OWNER : City of Bozeman CONTRACTOR : Nelcon,,, Inc . The following changes are hereby made to the CONTRACT DOCUMENTS : Justification : Cover spring after flow measurement Include washed gravelfill , filter fabric cover , soil cover , and cleanup . Change to CONTRACT PRICE : Original CONTRACT PRICE : $633 , 379 . 90 Previous CHANGE ORDER total : $ 21 , 140 . 80 Current CONTRACT PRICE adjusted by previous CHANGE ORDER ( S ) : $654 , 520 . 70 The CONTRACT PRICE due to this CHANGE ORDER will be increased by : $ 6 , 112 . 50 The new CONTRACT PRICE including th.is CHANGE ORDER will be $660 , 633 . 20 Change to CONTRACT TIME : The CONTRACT TIME will be increased by -5- calendar days . Total Contract time is 110 days after this change order . Approvals Required : ( Signature indicates acceptance ) : Contractor : Project Engineer : City Engineer : City Manager : �# Change Order : Page 1 of 2 ADD : UNIT TOTAL NO . UNITS DESCRIPTION PRICE PRICE 151 LS Spring closure , gravel , fabric , native material cover and clean up 6 , 112 . 50 TOTAL ADDITIONAL $6 , 112 . 50 Change Order : Page 2 of 2 t I EIVIF U i� S E P 2 7 1989 proliect l+ September 27 , 1989 �{ Mr. Paul Kinshella, P. E. v CONTRACTOR$ Gaston Engineering/Surveying P.O.Box 2667 P. 0. Box 861 Missoula, MT59806 Bozeman, Montana 59715 Re: Lyman Creek Water System CHANGE ORDER NO. 4 SPRING EXCAVATION 246 CY 3-Inch Minus $ 2 , 460. 00 8 hrs. Supt. @ $35./hr. 280. 00 Equipment 11 . 5 hrs. gravel placement $65./hr. 747 . 50 10 hrs. topsoil cover & cleanup $65 ./hr. 650. 00 Filter Fabric 200. 00 $ 4 , 337 . 50 Paint Building $ 605. 00 Electrical Disconnect 390. 00 Guard Posts 400. 00 6x12 Reducer Laborer 2 hr. @ $35.hr. 2 hr. @ $30./hr 130. 00 1, 525 . 00 20 CY 2-inch Road Mix $ 250 . 00 $ 250 . 00 $ 6, 112 . 50 We are requesting five extra days construction time. Respectfully, Glen Stensrud � GS/mac 4061721.1733 ADDENDUM NUMBER 1 Lyman Creek Water System Improvements For City of Bozeman The following changes shall be noted on the constuction specifica- tions and/or drawings and shall be noted by all interested bidders on the bid schedule (complete front page of bid schedule ) . Specifications : 1 . Add new revised Bid Schedule-enclosed. 2 . Add Paragraph 8 on SP-7 as follows : 8 . Construction Limits : The construction limit for the 16 " DIP Water Main from station 0 + 00 to 9 + 00 shall be 100 feet wide centered on the pro- posed water main alignment . The contractor shall not disturb any area outside of this area . The contractor shall route all equipment and material on this construction limit from the 9 + 00 plus stationing . Any rock or material that falls or rolls out of the easement shall be retrieved by equipment that mini- mizes the tracking of the area. All disturbed area on the Station 0 + 00 to 9 + 00 shall be returned to original con- tours and reseeded to pasture grass mix. The remainder of the line ( 9 + 00 to 61 + 00 ) shall have limits of ,100 feet cen- tered on the water line . Access material and equipment storage shall be as designated by the Engineer . 3 . Delete paragraph 07 . C. 4 ) ( 5 ) & ( 6 ) of Section 15-C requiring bacterial testing . 4 . Special Conditions 1 Schedule of Occupation etc . The wage rates for this contract are amended to include modification 1 and 3 . Contractor is required to use the latest applicable wage rates . 5 . Section 16-D page 4 - delete paragraph E. Construction Drawings : 1 . Sheet 8 of 14 A ) On the Pressure Reducing Vault : 1 . The height of the walls shall be 9 feet . 2 . The 16 " x 8 " reducers shall be flange by flange, not mechanical joint . 3 . The insulated covers shall have 2" x 6 " joists on 16 " centers or less . B ) On the Drain Outlet , the depth of 24" diameter RCP shall be 2 feet . Addendum 1 Lyman Creek Page 2 2 . Sheet 5 of 14 . A ) On the Inlet Control Structure, and the control valve vault , change the access lid from a Neenah R 1872 to a Caird 52441, MCI 305 or IFCO 772 . B) On the insulated wood panel covers the 2 " x 61' joints shall not exceed 16 " center to center . NOTE: This addendum must be acknowledged by signature on the front sheet of the bic proposal sheet . Contractor BY: Set Number ADDENDUM NUMBER 2 Lyman Creek Water System Improvements For City of Bozeman The following changes shall be noted on the constuction specifica- tions and/or drawings and shall be noted by all interested bidders on the bid schedule (complete front page of bid schedule ) . Specifications : 1 . Add new revised page 4 of 4 of the Bid Schedule . This item includes all work associated with the removal of the existing floride equipment and the installation of the new floride equipment . 2 . Special Provisions page SP-5 paragraph w. Change the last sentence from "not including gate valve and boxes" to "including gate valves and boxes . " NOTE : This addendum must be acknowledged by signature on the front sheet of the bid proposal sheet . Contractor BY : Set Number BID Proposal of , (hereinafter called "BIDDER" ) , organized and existing under the laws of the State of doing business as _ To the _ City of Bozeman (hereinafter called "OWNER" ) . In compliance with your Advertisement for Bids , BIDDER hereby proposes to perform all WORK for the construction of Lyman Creek Water System Improvements_ in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein , and at prices stated below. By submission of this BID, each BIDDER certifies , and in the case of a joint BID each party thereto certifies as to his own or- ganization , that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor . BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within 90 — consecutive calendar days thereafter . BIDDER FURTHER AGREES TO PAY AS LIQUIDATED DAMAGES, THE SUM OF $ 400 . 00 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions . BIDDER acknowledges receipt of the following ADDENDUM: *Insert "a corporation" , "a partnership" , or "an indi- vidual" as applicable. BID: Page 1 of 4 BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following unit prices or lump sum: WATER SYSTEM IMPROVEMENTS LYMAN CREEK BID SCHEDULE NOTE: BIDS shall include sales tax and all other applicable taxes and fees. ITEM UNIT TOTAL NO. UNITS DESCRIPTION PRICE PRICE 101 7885 CY 'Type 1 'Trench Excavation and Type A Backfill @ $ /Cy = $ 102 100 CY Type 2 Trench Excavation and Type A Backfill @ $ /CY = $ 103 8 HR Exploratory Excavation @ $ /HR = $ 104 500 CY Type 2 Pipe Bedding @ $ /Cy = $ 105 6114 IF 16-Inch Class 52 Ductile Iron Pipe @ $ /LF = $ 106 185 LF 4-Inch Class 52 Ductile Iron Pipe @ $ /LF = $ 107 27 EA 16-Inch Bends, 17-11jo, 7-2210, and 3-450 @ $ /EA = $ 108 3 EA 16 x 16 x 16-Inch Tee @ $ /EA = $ 109 1 EA 16 x 16 x 6-Inch Tee @ $ /F-A = $ 110 2 EA Pressure Reducing Vaults and Piping @ $ /EA = $ 111 1 EA Connection to Existing 18- Inch Asbestos Cen-ent Water Line @ $ /EA = $ 112 1900 LF Surface Restoration and Reseeding @ $ /LF = $ 113 4214 IF Road Subgrade Construction @ $ 114 2 EA Drain Outlets (24-Inch RCP) @ $ /EA = $ BID: Page 2 of 4 ITEM UNIT TOTAL NO. UNITS DESCRIPTION PRICE PRICE 115 1115 CY 2-Inch Minus Crushed Gravel Road and Turnaround Surfacing @ $ ICY = $ 116 40 LF Connection to Diversion Structure with 16-inch DIP @ $ $ 117 1000 CY Diversion Dike Construction @ $ /CY = $ 118 1000 CY Pond Excavation @ $ /CY = $ 119 LUMP SUM Diversion Structure Concrete @ $ /LS = $ 120 1 EA Diversion Vacuum Air-Relief Vault and Valves @ $ /F-A _ $ 121 96 IF 12-Inch CSP Drain Pipe @ $ _ /LF = $ 122 160 CY 1-Foot Mean Diameter Rip Rap @ $ /CY = $ — 123 70 LF 30-Inch CSP @ $ __ /LF _ $ — 124 68 LF 16-Inch DIP Diversion Drain @ $ /LF = $ 125 1 EA 16-Inch Butterfly Valve and box @ $ /EA _ $ 125A 1 EA 1.8-Inch Butterfly Valve and box @ $ /LA = $ 126 10 EA Bentonite Cutoff walls @ $ /EA _ $ 127 LUMP SUM Pipe Gallery @ $ _ $ 128 LUMP SUM Inlet Control Structure @ $ /LS = $ 129 LUMP SUM Control Valve Vault @ $ /LS = $ 130 LUMP SUM Major Yard Piping @ $ /LS = $ 131 LUMP SUM Reservoir Cutlet Control Structure @ $ /LS = $ 132 LUMP SUM Chlorine Building @ $ /LS = $ 133 LUMP SUM Electrical & Control Wiring @ $ /LS _ $ 134 LUMP SUM Control & Instrument Equipment @ $ /Is = $ 135 LUMP SUM Chlorination System @ $ /IS = $ 136 LUMP SUM Plant Water & Drainage System @ $ /LS = $ — BID: Page 3 of 4 ITEM UN IT TOTAL NO. UNITS DESCRIPTION PRICE PRICE 137 LUMP SUM Northside Booster Station Irrprovements @ $ /LS = $ 138 LUMP SUM Floating Reservoir Cover @ $ /IS = $ 139 LUMP SUM Site Grading & Surface Gravel @ $ /IS = $_! 140 350 LF Fencing @ $ /LF = $ 141 LS Floride System. Remove existing equipment and install new equipment @ $ /LS = $ 142 Minor Yara Piping (Ccnplete in Place) a) 350 LF 12-inch PVC Plater Line @ $ b) 2 EA Freezeless Hydrants @ $ /EA = $ c) 2 EA 12-inch Gate Valves @ $ /EA = $ d) 160 LF 3/4-inch PVC Water Line @ $ /LE' _ $ e) 50 LF 3/4-inch Copper water Line @ $ ILIF _ $ r ) 35 LF 12-inch Ccpper water Line @ $ _/LE = $ _ g) 1 EA 3/4-inch Corp Stop @ $ /EA = $ _ h) 1 EA 12-inch Corp Stop @ $ /EA = $ 143 1 EA Spare Equipment @ $ /EA = $ TOTAL BID $ figures words Respectfully submitted: BY: Signature Address Title Date License Number (if applicable) (SEAL - if BID is by a corporation) ATTEST BID: Page 4 of 4 PLAN HOLDERS JST for LYW�N, CREEK (as of lb�-,ember 2, 1988) Billings Builders Exchange HoL-zi Sutherland 2024 3rd Ave. N. Box 578 Billings Mr 59101 Billings, Mr 59103 Butte Builders Exchange �rthwest Pipe, & Fitting 1230 Harrison Box 1258 Butte, KP 59701 Billings, 1,2 5910" Great Falls Builders Exchange Phillip Forbes-Dir of Pub Works Box 2027 Box 40 Great Falls, MT 59403 Bozeman, Mr 59714 Plan Librarl/Builders F/charc7e C4 Neal Corp 601 tiv Vil and 1630 Lily Ave Bozeman, INIT 59715 El Ca. on, CA92021 ,14ontana Contractors' Asscc. Warrer, M--vars Boy. 4519 1420 L*i-Gilman suite 216-1 heiena, L',T 59604 Issam-Ih, v�A 98027 `*�Iissoula Builders Lccllhang,,�� 'U'S Pine- & Foundar�,7 P.O. Box 3109 630D Southcenter Blvd Suit-e 201 114issoula, ,,T 59715 Tukwila,' 1-�A 98188 SISIG Engineering Falls Box 8 6 lSt & giver. Driv-= Bcze-z.ra,n, Mr 59715 Grs-,t Fall, -,'4f 59401 Pioneer Readv t-Iix a-a- Ccnst North '7t�-i A�7e 1GU S 32n-I Sz. Wvzst N2 -9-10-1 Bozeman, %2 :59715 c ' in --, I SLme Construct-icr. Don -,::I It n g 485 �achariah !-- lox 716 Bozaman, 11CLO 59715: I%ff 59644 Gilman Excavazi= a- 'Con ssc(:-- te-d G-ner:,! -�-crs Butte, NT 501701 3ox 'i266 ichnston zl;IcaVaticn 505 Blau: ire PL 'vzater 4crks Sale Eozeman, %11, 5,9715 4295 Kea-rnev F- Clause -avation De n 1',er, C-0 -0216 848 LMain Su-L ta 23 Treat=ent 'EcpmLp-m--nt Billings, mll :191c ; -.! - x 1349 L-a=.an Co-struct-Ion .,nancond,a, IMP 59711 Box 6427 C4, Ccnstr,,.:cft ion 59406 Box 279 Lincoln, 59639 2,3x 2667 a��arstar M. sczouia, `"!P 39805 R.0 8x 2-1-349 Dana -,,\ejnsr nil 1 iA:.'q S, r,I-T' 5 9-!'j 4 Sol' 23167 c-cce Billings, -Nal' -7-9101 Coo Cons.. 59104 Bi '2ox llincs,], R. ii. Srbov;�-ir 04 2ox 4410 , D-910 Barnard Ccnsz. Soze--�em, -�T 597-:2 103 Cc=. .e---:-ia1 1-1'r Chet Sons -"T ''50�;715 Bcx 1055 Service -Ic Lew:Lstown, M11, 3,94-57 BOY, 11916 Kenny Cons--rIUC::i--:I Bozeman, °,LTI 59715 aDx 330 Hardin, -'�:T 59034 Coleman Const tz i nq ar Z--;ectr;Lc 2600 Webstar Lane 9(;7 8r4da-3r Dr. Dillon, L�Ir -5-9725 Bcze��,an,-k"I-L 59713