May 20, 1988
Gerald M. Gaston, P.E .
Sanderson, Stewart and Gaston Engineers
2010 North 7th Ave P .0.Box 861
Bozeman, MT 59715-0861
Re: Proposed improvements 'to Bozema,n ' s Lyman Creek Water Supply.
E .S . No. 86 -40 .
Dear Mr. Gaston:
The above referenced plans and specifications have been reviewed
by engineers of the Environmental Sciences Division and were
found to be satisfactory. Approval, of these plans is given
herewith and according to the following provisions :
That any change in the above referenced plans will. be submitted
to the Water Quality Bureau for review prior to the beginning of
construction, and,
That within 90 days after project construction, the engineer
shall certify to the department that the project was completed in
accordance with the plans and specifications approved by the
department . This certification shall be accompanied by a
complete set of "as built " drawings signed by the project
engineer, and,
That departure from any criteria set forth in the approved plans
and specifications without department approval is grounds for
injunction by the Department of Health and Environmental-
Sciences .
Sincerely,
Dan L. Fraser, P.E . , Supervisor,
Public Water Supply Section
Cc , City of Bozeman
Emery Nelson, R. S .
.;r�t:'i1Ua[-r)a>F'Csrrr[,tnl[r,'f.nlY[,r)vF'ft
rXHfB1T MAP
A 30,00' W10E ACC,SS EASEMENT' A(,PGSS TRACT A-I OF COS No. 917-A ti
TRACT A OF COS NO. 1144A ALL S I Tl1ATEp IN VIE NWI/4 OF SF,J T I ON 33
H THE WQ2 OF $E&TION 20, Tl5 R , FAA GALLATIN COUNTY, MONTANA
N Irif Con TO .,�..,„...,,... .....µ.,,....,'........,.....,, rlw 1/10 con 9EC 26
4ECL. 2e a 29
in
P
n
c n,
C 1 7"Y Or BOZEMAN
H A3`�3'31'f
N 32'Ili'03•F a
0
I+-aoa,Do
W Ira can SEC 20
l.-t1A,G8' C-W liln Con 3EC 2a /
SCALE:
aaa,eo �
1 �
I x.
tot o l FjW__
Robb �nsltl�en�ry /
VRACT 1
/ COS NO 1264A
f 11
f
I4,•tAol.�t'
/ SW I/rb CdRufC P.0 •.,.._ 6•'4 1/ra Con SEC 28
r
OF EX101ho ROADWAY
1�Q 7
W
rRAC r r
COS NO, 1144A
r N so•n3' IE'�
SEC COP TO SEcs
2a,2.O,3E a J3
....,.. —P�f ,13 MA•7T'33'�o• ..M-.,.. ....�.��....•��......W S 1�4 COP SEC 2e
0u'
C r FY OF BOO MAN C 3 R•t4.1 RK
7WACT A-1 or COS NO. 917-A
Centerline 0escript-ton of Access Easement
A 30.00 feet wide access easement Across Tract A-1 of COS No. 917-A and Tract X of COS
No. 1144A all situated in the Wi or Section 2e and the NWA of Section 33, T1S, R6L,
PMM, Gallatin County, MT, and being 1,5.00 feet on each side of the following described
centerline.
Regirrning at a point which is 501132129"E a distance of 10.00 feel; frm the 14 corner
of Section 28, TIS, RGE, i'MM, said point also being on tht; westerly line of said
Section 33; thence from Said true point of beginning along a curve to the left with a
radius of 24.89 feet a distance of 33,20 feet; thence N1053'16"E a dioanee of 556,57
feet; thence N01"37'11"W a distance of 278,20 feet; thence. along a curve to the right
with a radius of 1920.00 feet a distance of 14M.32 feet; thence N4?. WOVE a
distance of 468.60 feet; thence along a Curve to the left with a radius of 500,00 feet
a distance of 89,69 fact; thence N32"10'03"E a distance of 41.5.4o feet and N43"431310
a distance of 81.48 feet to a point on the easterly line of Tract 1 of Certificate of
Survey No, 1144A. Said poifit be.inq end or casement.
ENGINEERING, INC,
Sanderson/Stewart/ taston
1mc
November 22 , 1988
W. Q. #86-511
Mr . Phill Forbes
City Engineer
P . 0. Box 640
Bozeman , MT 59715
RE : Lyman Creek Testing
Bear PhUl :
r checked. with OHES regarding the required testing needed on
Lyman Creek water . Mr . Jim Melstad stated that the new regulations
would be out in a month or two and that we should wait .
He did , however , mention that once the new safe drinking water-
regulations are out in final form any community having a surface
water source such as Lyman Creek will be given 18 months Wst ) to
prove to the DHSS why filtration is not needed . It this is the
case , I think that a testing program such as outlined in my letter
of February 17 , 1988 would be a good idea to initiate now.
Once the new improvements are installed , we will be monitoring tur-
bidity continually; pH and temperature are no big thine and can be
obtained during t;he daily visit , The only real cost would be coli-
form which is a good idea anyway.
Jim Melstad said he would keep nee posted as to the final
requirements and let me know of any change in sampling .
he yoy,
i
r
Gee ald M. Gasto f
GG/lg
Consulting Engineers and Land Surveyors
Billing,, Montana Sheridan, Wyoming Bozemao, Montana
Suite 200 Creekside Suite 301 2010 North 7th Ave.
1G31 South 24th Street West 45 Easl Loucks PC). Box 861 ,
59/02/091 821301 597110601
� Q�SU Y H THE CITY OF BOZEMAN /()J
G,3 35 NO, BOZEMAN AVE. RO, BOX 540 ;
r * CAHNEGlE BUILDING PWONt (4061 586.3321
BOZEMAN, MONTANA 59771-0640
` C0."z°,` December 1 , 98
Mr. Paul Kinshella ..R` I.ME-'1 t
sanderson/Stewart/Gaston DEC 0 5 1 t:
Engineering, Inc .
P . 0 . Box 861
Bozeman, Montana 59715
Project
RE : Lyman Creek Water System Improvemeats
Leer Mr . Rin hella :
This letter is written to appyQve the plans and
specifications prepared by your office , dated 27 October 1987
and revisad 24 October 1988 . Please foz;w:ard two additional
sots of th, plans and specifications to this office for
distribution tQ City staff ,
If there are: any further revisions or modifications
subsequent to this approval , I trust you will bvi ng tham to
IC1y attention .
Sincovely,
PY�illip Forbes
Diractor of Public Service
CC ! Wator Quality Bureau, DHEs
Fred Shields , Water « Sewer Superintendent
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK
2 7 — GI 'F? F.- R* 1 3. !T, R p W h i t. L IC n wl sw r. P C
...........
FAQSIPIXLE TRANSMITTAt-
J erey
il)OT h - Oalrnkollov 271 ly�.39
call. JA You
Thaink, YOU%
:,f w t a �. .•'r _ _ ;°,c" ( ; I 1 1 _ ,. " R F' W t'A i r. r. = r-1 0.10 :_ - = F' f~' FEll
all
7' r
i.
�u LL �glcil�T
1,� f
A'r s Piz SIFE
T` p
V Of M04.1",
4 F-7
�j�r %'
f �p PC�V; ,
LLell
LIL
27 SAKIUAR� 19
/S/G ENGINEERING
& SURVEYING
zo
Consulting Engineers and Land Surveyors
P.O. box 861
2010 North 7th Avenue
Bozeman, Montana 59715
(406) 586.0588
February 9 , 1.989 -r
imr . Richard Nelson
Nel con Inc .
P . G . Box 2667
Mi ssou is , MT 59806
RE : LYMan Creels Water SysterTj
Improvements
Dear fir . :`Vel son :
In response to your letter of February 7 , 1969 , reque :;'(.ing a
" Winter Shutdown " and in l i yr! 4 of %he present conditions on the
site , 'the elaspe of contract time is suspended as of Feurua3 ,y 9 ,
i989 . This acti o)t is taken in accordance with tite pr•ovi siun of
Section l.5 of the General Conditions of the Contract Documents
dated January 2 , 1989 .
5/S/G Engineering & Sur•veyi ng will rnorti for file conditions on the
site and provide advance notice to you when conditions are
suitable for construction .
As of February 9 , 1989 there are 90 consecutive calendar days
remaining .
Sincerely , .�--
f "Gerald 14. Gas ":on P . E,
ACCEPTANCE OF NOTICE
Receipt, of the above " WINTER SHUTDOWN "
is hereby acknowledged by :
ay o T �,��
February 15 , 1989
F E 1989
CONTRACTORS
Sanderson/Stewart/Gaston
CONTRACTOAS
P o Box 2667 PO Box 861 ProjfM
Missoula, MT59806 Bozeman, MT 59715
Attention: Paul Kinshel.l.a, P.F.
Re: Lyman Creek Water System
:improvements
Bear Paul :
In response to your letter dated February 13 , 1989,
NELCON, Inc. will be present at the preconstruction
meeting as scheduled.
Answers to your questions are as follows :
1 . Superintendent:
Ray Aldrich - 721-1.733
NELCON Office -- 721-1733
5,.g,bcontractors :
Townsend Electric
Vogl, Brothers Construction
Gundle Lining Co.
Sunshine Painting
Anderson Precast
2 . Project schedule is attached
3 . Material Sunpl,iers:
Northwest Pipe
If you have any questions or need further information,
please contact our office. Thank you.
Sincerely yours,
NELCON, Inc.
Richard L. Nelson
President
Enc. 1
4061721.1733
E;1
ti
5�
� o
O
m
110
Ld
it #
pl
0
u
0
C L -
.........� 5
PRE -CONSTRUCTION CONFERENCE T
Project : L man Creek Water System 7mprove;lexxts
P l a c e : Bozeman C i tt Lnaineers .
Date : 2 W-2 2--8 9 „„ .- ,,,..
1 . NAME OF OWNER :__City of Bozeman
ADDRESS : .,.G. Box 640 ; Bozeman MT
CONTACT PERSON : Philli.2 Forbes PHONE : (406 ) 586, 3321
ATTORNEY : PHONE : f } W
2 . NAME OF CONTRACTOR : Nelcon Inc.
ADDRESS . P. O. Box 2667; Mi8soula, MT ,...
CONTACT PERSON : Dick Nelson PHONE : ( 406 ) 721 -1733 WY
SUPERINTENDENT : PHONE :
J08 SNACK : PHONE :
3 . ENGINEER : S/S /G Enqineering & Surveyin
ADDRESS :—P .O. Box 861; Bozeman , MT
CONTACT PERSON Paul Kinshella or PHONE : ( 406 ) 556 - 0588
Jerry Gaston
INSPECTOR : PHONE :
4 . GRAN•rOR
ADDRESS :
CONTACT PERSON : PHONE : ( )
S • GRANTOR :
ADDRESS :
CONTACT PERSON : PHONE : f )
PROCON _ 1
6 . PERSONS IN ATTENDANCE
NAME ORGANIZATION ADDRESS/PHONE
--jerry Gaston S G Engineering Engineg-ring P .O . Box 861 Bozeman
PHONE : 406 S86-058'8
ri P .O. Box 861 Bozeman
PHONE : 406 556-0588
RS7n, 1 -_ ne11 ty . of Bozeman Box 640 - Bozeman MT
PHONE . 406 586�3321
r,ar,c l:y of-Bozeman Box 640 • Bozeman MT
PHONE : 406 586--3321
_._L.a.rry WO.Qdw.ard _. _Q,-ty of 13ozeman_ Box 640; Bozeman, MT
WON 406 586- 3321
r..ecl. Ski e_lrls City of Bozeman Box 640 ; Bozeman, MT
PHONE , 406 586-332.1,
..Phil,lip J. forbes C1,ty of 13ozeman� Box 640 ; Bozeman, MT
H0N „ : 406 W83 -1
And e City O� B. ozeman Box 640 ; Bozeman, MT
.. y. Kerr ... „ - ....,.. .__ .
NE : 0 a "6_ I
Richard L. Nelson Nelcon Inc . Sox 2667; Missoula, M'I
-1733
.4;L10 Benson Nel,con Inc. I3ox 2667 ; Missoula, MI
N ;0 2 173-3
7 . RESPONSIBBILITY OF CONSULTING ENGINEER
Does not supervise the Contractor ' s employees equipment or opera-
tion . Assures City obtains ' s desired facility. Prepares change
Orders and payment estimate . Inspects project .
Provzci.es construct, provides gCity .
construction stakes �'ov'.i.des testing for
8 . RESPONSIBILITY OF OWNER ( Governing Body )
Approves change orders and pay estimates . Request funds from
Funding agencies .
PRECON - 2
6 . PERSONS IN ATTENDANCE
NAME ORGANIZATION ADDRESS/PHONE
t Q Montana Power 1006 W Main; Bnz.emen, MT
P}iONE : 06 S$
--Dan Q i ver US West 2707 W Main; Bozeman, MT
PHONE : 906 23 0
NW Pipe _
PHONE . 800 .. 774
TONE :PHONE
... H ONE . mm
Fib ONE ,
P H
PHONE -- y
7 . RESPONSIBILITY OF CONSULTING ENGINEER
Does not supervise the Contractor ' s ernployees equipment or opera-
tion . Assures City obtains ' s desired facility. Prepares change
orders and payment estimate . Inspects project .
8 . RESPONSIBILITY OF OWNER ( Governing Body)
Approves change orders and pay estimates . Request funds from
funding agencies .
PRECON 2A
9 . RESPONSIBILITY OF CONTRACTOR
Furnishes material , labor , and equipment necessary to construe
per plans and specifications . Notifies engineers of discrepancies.
Complete job schedule .
10 . RESPONSIBILITY OF GRANTOR
N/A
11 , GENERAL DISCUSSION ON CONTRACT
Alternate Specifications : Provide. submittal
Initiate Construction : as Rer schedule
Completion Time : 90 da s
L i quated Damages ,_ $400 ._0J/clay_ _
Request for Extension of Time : in writing
Procedure for Making Partial Payment : r, 47.
Guarantees on Completed Work : I13ini1Tlum of 1y
Other :
12 . CONTRACTOR SCHEDULE
Work Schedule :
PRECON 3
Equipment to be Used :
Material Deliveries and Storage : arrange with Cit
13 . SUBCONTRACTORS
Townsend Electric PHONE (800 ) 345 -- 2279
Gundle PHONE ( ) -
Vogl
14 . STATUS OF MATERIAL FURNISHED BY OWNER
stack waste material on 5 acres at reservoir
15 . CHANGE ORDERS : Required for overruns and underruns . Use unit
-rites from bid , or if not-_app icab e ne ntiate unfit an or
fql � sum. Contractor warned inat no -payment for chances unless
um
_ Y approved . Ca f'ar verbal a roval if holdin u work ,
f'
lb . STAKING OF WORK : as per sL a. ki,nq request
17 . PROJECT INSPECTION
Consulting Engineer : s/S/Gncinee.ra.n & Survey; W„c�
3 g in
Owner : Responsible for eleventh month ins ection
18 . FINAL ACCEPTANCE OF WORK : is on ;Final estimate
19 . LABOR REQUIREMENTS
*EEO/MEE
*DAVIS BACON : recluired
PRECON - 4
*FEDERAL REQUIRED :
*STATE LOCAL REQURED :
*UNION :
*REPORTS REQUIRED : r�er�i eCI oil
20 . RIGHTTOF-WAYIEASEMENTS
*Areas Not Available to Contractor : as n
*Contractor ' s Responsibility: om, y. with r5'
*Coordination with Railroads , Highways , and Others :
*Project Signs and Posters : + � pia
21 . HANDLING DISPUTES
as Per S ecificati n, & Conk
PRECON - 5
REVIEW AND CONCURRED WITH :
w
antra or
ngineer
Board Member
Beard Member .�
raptor
Al f
i er
mac• �
Cher
t e-r .�
SSG/1983
GMG/dip
PRECON - 6 END
..............
............
LZLLe
................
....................................
............ ..........
..........
..................
.............
.......................
� S/S/G &
ENGINEERING
SURVEYING
�
Consulting Engineers and Land surveyors
P.O_ Sox 861
2010 North 7th Avenue
.., Bozeman, Montana 58715
(406) 586-0588
May 5 , 19dy
W . O 511 - 1
Mr . Richard Nelson
Nelson inc .
P . O . Box 2667
Missoula , MT 59806
RE ; Lyinan Creek Water System
Improvemenrs
hear Mr . Ne 1 son ,
Your Notice of Start of Construction is effective as of May 1 ,
1989 . The elasne of contract time has be'qun as of May 1 , 1989
beginning the 90 consecutive calendar days remaining . This aCt ion
is taker) in accordance with the provision of Section 15 of the
General Conditions of the Contract Documents dated January 2 ,
i989 .
Sincerely ,
Paul Ki ;rshella , P . E .
PK /cab
ACCEPTANCE OF NOTICE;
Receipt or above "Spring Start Up "
is hereby acknowledged by :
th i s the
� Tday 4of
Title :
05/22/89 1€);44 V713 875 6010 { CiUNDLE L I N I N('; --- .`.i.a(:i BOZEMAN 2tr1
• � ,�d1� Lining Sy�t+��ta Inctnc NO. 10771.
03 u nn d Ll ce Cp: -
1'4103 C u,W1c3 Rd. Phone:;r'is)4a1,0501
HoustcAl,Tuxas 7707:3 T01 Free:(800)-AUy 20038
U.S.A. Telex 46.101$I c.,UF4DLE HOU
Pax!f r 131 M. Fg1U
TO: ,�> DATE: i �n
ATTN=
FROM: Gundle Lining SyStt.ms Inc.
FAX NU: ("113) 875-6010 Am
CONTACT., .� � ��.�^ /°-5 i --p
1-4
i
Total pages including cover page
V0 UPJIi,) 1,0,;NPLL• L I N I M(� (, bllLk,NAN
Gtindle Lining Systems Inc
If &was
19103 dUntl1e ad. Phone(71a1 4434M4
Houston,TorAa 17073 Toll Ffev:(ti00)435.LPrM
U.S.A. TOM 4620281 GUNOLE HOU
Fax:(7131 875,4010
May 19, 198g
Mr. Ceral,d Gaston
SSG Engineering
2010 N. 7th Avenue
Bozeman, MT 59715
Dear Mr. Gaston:
In response to your conversation with Mr. Steve Baer, Gundl,e
can certify that; our HDPE liner can meet the properties an.
questions:
1 . Melt Index Value of . 1 to .2; g/10 min. 0r . 3 g/10 min.
MAXIMUM, instead of . 5 to 1. 1 g/10 rein.. as specified. A
lower melt index is better for HDP1. ,Liners because it
means a higher molecular chain it$ Composition. A higher
molecular chain provide's a greater resistance to
p011k1ta,nts that may break down the linen.
2 . A carbon }slack dispersion of as A-1, A-21 or B-1 range
instead of A--1. The oa'rbon black dispersion testing is
very subjective, and it is al.Most impossible to obtain an
A-1 level of dispersion. consistentl.y, Gundl,e' s dispersion
range of A-1, A-2, or B-1. is eXcepted in the hazardous
waste industries by such campa11.Jes as Chemical Waste
Management, Inc.
3 . A sea& shear strength of 90% and peel value of 50% of
parent sheets tensile yield value instead of 100% for
sho4r and 80% for peel . When: welds are tested in peel and
shear, they will never exhibit tensile strength values as
high as the parent sheet.. The overlap of the sheets at
the -weld prevel-its the Sample from being stressed in a
single plarle and the angle of the samples endures
additional bending stress in the material. In peel, tests,
the induced bending stresses are even higher than in an
shear test.
4 , A low temperature brittleness of --440C max. instead of
7000. Even though Gundle is confident that the liner will
withstand eXtreme temperature, it is impossible for the
testing machiTie to give accurate results at such low
temperatures.
Gunn dLtac;
Mr. Gerald Gaston
May 19 , 1989
Page 2
5 . A juncture resistance of 440 lb. min. itstead of 450 lb.
min. Gundle can only certify that the liner can resist up
to 440 lk», of puncturing forco can the 100 mil .
6. A 7. 6cm minimum overlap of the owhot wedge,, seam weld
itstead of 12 cm. Due to the configuration of the wedge
welding machine and the tendency of the two liners to
separate as the machine passes over the two liners to he
seamed, a 7 . 6 cm or 3 inch minimum overlap is obtoi„nable.
TIlis should fully explain Giandle certification capacity for the,
tests in giiestions, and 1 hope it will answer any question;
that you have concerning our HDPF liners.
Sincerely,
m Suh
Project Specialist
JS : ams
June 5 , 1989
W .O . # 86- 511 -1
Phillip Forbes
Director of Pub 'I i c Works
P . 0 . Box 640
Bozeman , MT 59715
RE : Lyman Creek Water System
Dear Mr . Forbes ,
The enclosed Statement of Compliance by Nelson , Inc . for work done
on Lyman Creek water system improvements for the weeks of 4-20-89 ,
5 -5-89 , 5 -1I -89 , 5 -17 -89 , 5 -26 -89 , 6-2 -89 , and 6-9 -89 have been
reviewed by our office and found to be satisfactory .
Nelcon , Inc . is paying the standard prevailing rate of wages
including fringe benefits and is complying with MCA Section
18-2 -403 , preference of Montana Labor 'in Public Works , providing
for giving preferences to the employment of bona Fide Montana
residents . The amount of hours worked per week by employees 'is
also correct .
When additional Statement of Compliance has been received by
Gaston Engineering & Surveying , we shall review them and send them
to your office .
Sincerely,
Julian Dodge
Enclosures
JD/zdb
e C 5
!hill.: \1T i',7
U6,, 3,,,�i) 11: 49 V713 873 0014 55G BOZEMA)� f jwq
Gundle Uning Systems laic
wuu nn dLIoe
191011 GS.:,aie Ad. Pharr-(71.3)443-85,3S
H*Wtein.Texas T707,3 Totf tree:(806)435,n,C3d"3
U-SA `fefex 4820281 GUAiDL.1=HOU
F=. (713)87s;43 10
DATE: June Zg' 1989
ro. S/SIG CONSULTING EXM—EEKS
AX NO: (406) .586- 0589 (HSAx:UATj
ATTN_ MP1. GERALD EAST 7, RECEIVED
JUN 2 1989
" Proiect
FROM: Gundle Lining Sy,.,tor'► s Inc_
FAX NO' (713) 875-6010
vUC�..1N�,.�i3": ix*kh1AV l4tc-�� ��SL,XS�1lJ�IS
GZITMIDLE �r qua
GERAL D,
Mil z3 OUP'. S;`aoi2oSEl� TOP-OF, }r3T.0 DESY('Y. PLF--SF ADVISE SOON Afi ' OS.gt'SLE.
Total paqes including cover page
788
'0 i 3 'IS9 I�: 4i1 �`"!13 'I7� C311111 GUNDLE LINING fy� SS{ B�3ZI,Sl.�\' E�j I;lt' 2
m 05
PtN�ER CAP
1/20 x 2.1/2Y W �2` 1/2" l�P SMIX
CAP 3° p IA. SHEAVE
3A IA. MOVE
Al
r
3/16M sz. TIM ION CAmg
Eu Lq, VCIGHT 1
h �� L _ 1
3/8" L. BMT
No. 6 MIX CuMcrm
Ai s
{} SEE DE:I'L z SEE DETAIL-12
E ,� AiDH SKIRT
S
i
a 1 III 1E7AiL-5 100 VIL aKLM Z COS
Y 1 LIMM (FULL P�i1CN)
R � 1
\ SEE OETA I L-4,
r
In
1� RUMW (12' WIC
HIT ANOM #" O.C. SEE DUAIL 3 ('TYP)
SECTION C-C 1 > TY Irx
(not to wait)
aA rf- 06-23-89
DRAWING No. 8007-C �
„* APPROV BY.. MH
Gundle Lining Systems Inc
GG u ( ;
19103 Gundle Rd, Phone,(713)443-W64
Houaton,Texas 77073 Toll Free:($W)43&2008
U.S.A. Teiex:4620281 GUNDLE HOU
Fax;(713)875-6010
TIECEV
.duly 7, 1989 J U L i a 19��
S/S/G Engineering & Surveying
P.O. Box 861
2010 North 7th Avenue
Bozeman, Montana 59715
RE. Lyman Creel: Reservoir
Gundle Job No. 8007
.Dear Mr, Gaston:
As per your request, this letter is being provided to confirm that Gundle Lining
Systetrrs, Inc. and Columbia Reservoir Systems, Ltd. have reacted an agreement on
the use of any patents associated with the installation of the floating nlen-ibrane
cover for this project.
This agreement satisfies any requirements of the specifications for this project,
Sincerely,
SPECIALI"Y APPLICATIONS DIVISION
Myron M..Harris, Y.E.
Design Engineer
MH/kc
Gundle Liming Systems 03unn
19903 Gu'rex P 7 Phone: ;(00 )435- 0 rjEC S tl ED
Haugtpn,'F�exas 77073 Tall Free;(600)435�2008
U.S.A. Telex;4620281 GUNDLE HOU
Fax:(713)875.6010 J U LProlect
�fiOA
July 12, 1989
Mr. Gerald Gaston
SSG ENGINEERING
2010 N. 7th Avenue
Bozeman, MT 59715
Dear Mr. Gaston:
RE: Lyman Creek Water Reservoir
Gundle Join No. 8007
Enclosed, please find the revised drawings and work schedule for the Lyman Creek Water
Reservoir. I have also enclosed two company brochures, two quality assurance/quality
control manuals and two different videos on Gundle Lining Systems .for your reference.
If you have any questions regarding Lyman Creek or any future projects, please do not
hesitate to contact me at (800) 435-2008 ext. 424.
Sincerely,
SPECIALTY APPLICATIONS DIVISION
Steve Baker
SB/kc
c: Contracts Adr in.
Job #-. (data: �
uoo;znn
.. ,..,. ...... . .................... .._ .... . __ . _
u oW -�
n
NSI
m
_. _.
w _y)
FOFIMNODSO87 PAWOLY PNNTEO M TFXA9 BYS4VTHWEPT DATA COAP.17ut&rA.n9gp
.7-
FT-1 C7
July 12 , 1989
W . O . # 86 -511 -1
Mr . Phillip Forbes
Director of Public Works
P . 0 . Box 640
Bozeman , MT 59715
RE : Lyman Creek
Dear Phill , Spring Development
Enclosed Please find a copy of a letter from Gundle regarding
their arrangements with Columbia Rese-rvoir System Ltd . rt appears
this question of "what and who " will be doing the reservoir cover
has finally been answered . Also Please note , I have received
drawings from Gundle regarding the floating cover and have given
a set to Ron Portnel . I will be getting a schedule from Gundle
regarding assembly of the cover and will forward a copy to your
office .
As You know , we have finished pioneering the road to the spring
and have completed the spring excavation . At the present time the
spring source remains uncovered because of our excavation . The
water Supply has stabilzed and we are in the process of measuring
th spring quantity . It appears that a rectangular weir will suf -
fice in indentifying the flow . By next week my schedule is to
have a portable weir constructed and installed at the spring site .
Although there are not large rainbow trout at the spring , you may
want to accompany us on one or two of the trips ,
We are well ahead of ( less than ) the budget figures I gave you
regarding to spring investigation . Costs 'for step one and two
( pioneer road and spring excavation ) will be included in this next
Pay estimate as a change order . And , yes , Your assumption that
the price I quoted for our -services was to replace the cost deve -
loped in 1986 for this work .
Will keep You posted as to our progress and proposed schedule for
Lyman Creek Spring .
Since ely ,
Gerald M . G st n , P . E .
Enclosure
GG/zdb
S Ll I- V
701 �1_1' 2�7:5
DEPARTMENT OF NATURAL RESOURCES
.AND CONSERVATION
STAN STEPHENS,GOVERNOR 1520 EAST SIXTH AVENUE
I^, . �h\ ^I�^/^, �^` /n, �.,.,...,..,....-...-��.,,,.�....�.....--�,,,,,,
�W -� °• ti �IWIIIYtIIIMWIIYrYIYI� STATE E OF MON I/ \I V/ 1
a
DIRECTOR'S OFFICF(406)4-44-6600 HELENA,MONTANA 59620.230I
.y TEL.EFAX NUMBER(406)444-6721
07/27/89 AUG 1 1 1989
City of Bozeman Project #
Phillip Forbes , P . E,
' PO Box 640
Bozeman , Mt 59715
I
RE: Lyman Creek water System Improvement
Dear Phillip Forbes , P. E. '
I
i The 1989 Montana Legislature has approved a loan authority of
$ 386 , 893 . 00 for your water system project .
The Department will be able to provide .loan funds during the
Current constructiQn season and iS acc rding,�y scheduling the
sale of State of Montana Coat, Severance Tax Bonds in September
1,989 and 1990 . Our underwriter has also told us that interest
rates will, most likely be close to the seven percent we
anticipated in the application . In order to establish the size
of the state issues , the Department needs a resolution of intent
to issue a bond for sale to the Department from each project
sponsor and a preliminary budget which includes the non-construct:-
ion casts and a contingency amount to cover unexpected cost
fluctuations . Project sponsors should submit resolutions of
intent: and a preliminary budget: before they plan to begin their
projects .
i
A model resolution of intent is enclosed as well as a budget form.
The resolution of intent is our assurance that you understand the
terms of the loan and the costs involved and are intending to
complete the steps necessary to issue a local bond to finance
the project . The budget will probably not differ too much from
the one submitted with your application but you will want to make
a few changes . We have included two attorneys as budget Stems ,
The local attorney will be needed if you purchase land or
negotiate easements for your project . You may choose to use an
attorney if you anticipate PSC proceedings for a rate increase .
We have also listed a band attorney in the event one is required
i and suggest that you budget $1. , 000 . 00 for local, attorney fees ,
$2 , 500 . 00 for a bond attorney. The budget should include three
( 3 ) percent for issuance costs . The issuance costs should be
on the amount in the loan column . You should also include in the
budget an amount for the reserve requirement you expect to fund
from bond proceeds . The reserve is one semi-annual payment and, can
C£NTRALIZFJJ SLHVICES CONSOVATION DI5TRICT5 ENERGY OIL AND CAS WAI7CA RESOURCES
DIVISION DIVISION 0IVI510N DIVISION DIVISION
14D51 444-570D (.09,4ALP991 „nM e,A.aca, JIM,„lade una,..,ee.I
Phillip Forbes, P. E.
City of Bozeman
07/27/89
Page 2
be funded completely with rates over a three-year period or
completely or partially from proceeds . The Reserve amount should
also be based only on the amount in the loan column. You may elim-
inate the inflation contingency if you plan to construct this year
or feel your costs will hold through the anticipated construction
period . The construction contingency can be a percentage of the
lump sum construction cost or different for each construction line
item. Please indicate the method you choose on the budget form.
Try to come as close as you can to a complete cost estimate. if
the project has been or will be reduced ill scope, the reduction
must not affect priority activities . The budget form should be
signed by the Mayor and the Project Engineer if one is under
contract . Please be sure to indicate in the space provided
on the budget form if you plan to borrow the grant amount .
The Department disburses loan funds as a lump sum when the bond
has been issued and the purchase documents signed by the sponsor
and the Department . The purchase transaction takes place when
the construction contracts are signed. in some cases the
construction contracts can be submitted a short time after bond
closini, :pith Department permission. Water and sewer p+lans and
specifications must be approved by the Department of Health and
Environmental Sciences as well as the Department of Natural
Resources and Conservation. An amortization schedule to help
you determine rates needed to amortize the loan has been included.
We have been conservative and used an eight ( 8 ) percent interest
rate for the schedules . If you have an outstanding bond, you
should review that bond resolution as to the coverage requirements .
Most require that annual net: revenues (gross revenues less operating
costs ) yield 125% of the maximum annual debt: service requirements
of all outstanding bonds . If there are no outstanding bonds
secured with rates frorn your system, annual revenues for debt
service must yield 125% of the maximum annual debt service plus
the reserve amount yoil plan to fund from the rates .
We will be happy to help you in any way we can and plan to meet
with all our loan sponsors this summer to review the bond purchase
procedures .
Sincerely,
�-4 YV
Bob Morgan�
Loan and Grant Section Supervisor
Water Development Bureau
Enclosures
BM/iap
Councilman introduced the following resolution
and moved its adoption:
RESOLUTION NO.
RESOLUTION OF INTENT TO FINANCE WATER SYSTEM IMPROVEMENTS
BY THE ISSUANCE AND SAFE OF BONDS
WHEREAS , the City of Bozeman intends to
authorize the issuance_ of bonds to finance the water system
improvements ( the Project ) ; and
WHEREAS, the City of Bozeman intends to undertake with
due diligence, a-ny required rate proceedings with the Public Service
Commission ; and
WHEREAS , in 1989 Montana Legislature in HB 718 authorized the
Montana Department of Natural Resources and Conservation ( the DNRC)
to make a loan to the City of Bozeman of up to
$ 386 , 893 . 00 at the interest rate which the state bond is sold
with a subsidy of two ( 2 ) percent for the first five ( 5 ) years of an
anticipated 20-year term and must be at the rate which the state band
is sold for the remaining 1.5 ,years ; and
WHEREAS , the DNRC has informed the City of Sozeman
that it will make the loan authorized by the 1989 Montana Legislature
by purchasing bonds from the City of Bozeman in the
amount of the loan , and that it will charge the
City of Bozeman an origination fee of approximately
three ( 3 ) percent ; and
WHEREAS , this Council has reviewed the attached budget for the
Project and is satisfied that the estimates contained therein are
reasonable and that all anticipated Project costs are included;
WHEREAS , the City of Bozeman expects to begin
construction of the project on or about _ and
complete the project on or about an
WHEREAS , the City of Bozeman agrees to complete
necessary steps to acquire these funds as described in the Water
Development Reports , January , 1989 , and in HB 788 , both of which
have been provided by the Department ; and
Page 1
WHEREAS, the statutes authorizing the
City of Bozeman to issue its bonds for the financing
of the Project provided that such bonds be sold at a private sale to
the State of Montana , notwithstanding the fact the legislature has
authorized the DNRC to purchase the bonds ;
NOW, THEREFORE, BE IT RESOLVED by the City of Bozeman
as follows :
1 . This Council. hereby declares its intention
to authorize the issuance of a Revenue Borid , in an amount
estimated not to exceed $ 386 , 893 . 00 bearing interest
at the rate for which the state bond is sold and with a
subsidy of two ( 2 ) percent for the first five ( 5 ) years of an
anticipated 20-year term and must be at the rate which the
state bond is sold for the remaining 15 years . To finance
the construction of the Project the sale of such bonds shall
be conducted in accordance with the applicable state statutes .
2 . The City air Bozeman declares
its intention to levy rates necessary to repay
the loan and to seek approval of the Montana Public Service
Cotmiission for the rates if required .
3 . This Council hereby authorizes and directs the
officers of the City of Bozeman to prepare
all documents and to take all steps necessary to
permit. this Cosancil to authorize, issue , and sell such
bonds and levy rages for their repayment. .
4 . This resolution shall become effective immediately
upon its passage and approval .
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR OF THE
City of Bozeman
APPROVED:
ATTEST:
Page 2
The motion for adoption of the foregoing resolution was duly
seconded by ( title and name ) ,
and upon votee bez gY4t:aken the ron, the following voted in favor of
the resolution .
and the following voted against the resolution:
WHEREUPON, the resolution was declared passed and adopted .
Page 3
DEPARTMENT OF NATURAL.' RESOURCES AND CONSERVATION
GENERAL OBLIGATION BOND PROGRAM
CONSTRUCTION PROJECT BUDGET FORM
DNRC* Non-
Loan ON RC Sponsor Total
I . CONTRACT ADMINISTRATION
A. Personnel
Adm In strator S $ S
Accountant
,Local Attorney
Bond Attorney
Subtotal Personnel
B. Associated Costs such as of f ice rent►
office equipment, supplies, travel S $ b
C1 . Loan Of I In;ltIon Fee of 3% of loan amount $ $ $ S
C2. Loan Administration Fee of 0
of i oa n amount S S S $
D, Reserve to be funded from bond
proceeds or sponsor $ $ S
TOTAL' CONTRACT ADMINISTRATION, FEE
AND RESERVE FUND COSTS
11. PROFESS IONAL/TECNNICAL COSTS
DNRC Non-
A. Personnel , Loan DNRC Sponsor Total
Project Engineer
Project Inspector
Other
Subtotal Professional/
Technical Personnel Costs
B. Associated Professional/Technical Costs
such as I aborator , travel , prinfin
TOTAL PROFESS IONALITED.4N I CAL COSTS $ S
DNRC Non-
Loan DNRC Sponsor Total
11 1 . CONSTRUCT` ION COSTS**
A. Labor - 5 $ S $
B. E=q u 1 pm ent
C. Materials
D. Subtotal Construction Costs
E. 10% Contingency for unexpected co5l"s
TOTAL CONSTRUCT ION COSTS S
1V. LAND OR STRUCTURE ACQUISITION $
V. INTEREST COSTS (funded frcrn bond proceeds)
If Interim f Inancl nQ contempl ated $ $ $
VI , INFLATION CONTINGENCY-
of b% of Total Project Cost,
I f. .Appropr I ate. . . $ $ $ S
TOTAL PROD FGT COSTS $ $ $ $
* This column should total no more than the combined grant and loan amount
authorized.
* If labor, equipment, mater I al s, and other construct I on costs are not go i ng to be
bid separately, then the total estimated In-place constructlon cost may be used
on Line D In lieu of Lines A, 8, and C.
Mayor Date
Project Engineer Signature Firm Date
Project CITY OF POZEMAN
Loan Amount $386,893.00
Interest 5.00%
Term 20 Yrs
Payment $15,412,36
:1�..._.�._-�5F
PAY>ENT 2 $15,412,36 i9,528.82 $5,883,54 $375,269.43
PAYMENT 3 $15,412,36 $9,381.74 $6,030,62 $369,238.61
PAYMENT 4 $15,412.36 $9,230.97 $6,181,39 $363,057,42
PAYMENT 5 $15,412.36 19,076.44 $6,335.92 $356,721.50
PAYMENT 6 $15,412.36 $8,916,04 $6,494,32 $350,227.18
PAYMENT 7 s15,412.36 48,755.68 $6,656.68 $343,570.50
PAYMENT 8 i15,41E.36 $8,589,26 $6,823,10 $336,747,40
PAYMENT 9 $15,412.36 $8,418.69 $6,993.67 $329,753.73
PAYMENT 10 $15,412.36 $8.243.84 $7,168.52 $322,585.21
PAYMENT i1 517,537,39 $1f M.49 $6,248.91 $316,336,30
PAYMENT 12 $17,539.39 $11,071.77 S6,467.62 $309,868.68
PAYMENT 13 $ 7,539,39 110,845.40 $6,693,99 $303,174,69
PAYMENT 14 $17,539.39 $10,611,11 $6,'328.28 5296,246.41*
PAYMENT 15 $17,539.39 S10,368,62 $7,170.77 $Z89,075.6A
PAYMENT 16 $17,539.39 $10,117,65 $7,421.74 S281,653.90
PAYMENT 17 f17,539.39 $9,857.89 $7,681,50 $273,972.40
PAYMENT 18 $17,539,39 19,589.03 $7,950.36 $266,022.04
PAYMENT 19 $17,539.39 $9,310.77 $8,228.62 $257,793.4E
PAYMENT 20 $17,5,3.39 $9,022.77 18,516,62 $249,276.80
PAYMENT 21 117,539,39 $8,724.69 S81$14"70 $240,462.10
PAYMENT 22 $17,539.39 $8,416.17 $9,123,22 i231,338.88
PAYMENT 23 517,5.19.39 $8,096.86 13,442.53 $221,896.35
PAYMENT N $17,539,39 $7,766.37 $9,773,02 $212,123,33
PAYMENT 25 $17,539.39 $7,424.32 $10,115.07 $2202,000.26
PAYMENT 26 $17,539.39 S7,070,29 $10,460,10 $191,539,16
PAYMENT 27 $17,539.39 $6,703.87 $10,835,52 $180,703.64
PAYMENT 28 i17,539.39 $6,324.63 $11,214,76 SS69,488.88
PAYMENT 29 $17,539:39 $5,932.11 $11,607.28 $157,881.60
PAYMENT 30 $17,539.39 $5,525.86 Sk2,013.53 $145,8E+8,07
PAYMENT 31 $17,539,39 $5, 105,38 $12,434,01 $133,434.06
PAYMENT 32 517,539,39 $4,570. 19 $12,869.20 $120,564.86
PAYMENT 33 $17,539,39 $4,219.77 $13,319,62 $1071245.24
PAYMENT 34 $17,539.39 $3,753,58 113,785.81 193,459,43
PAYMENT 35 $17,539.39 $3,211.08 $14,268.31 $79,191.12
PAYMENT 36 $17,539.39 S2,771.69 $14,767.70 $64,42314?
PAYMENT 37 $17,539.39 $2,254,82 i15,284.57 $4908,85
PAYMENT 38 s17,539.39 $1,713.86 515,813.53,, $33,319,32
PAYMENT 39 $17,539.39 i1 166.18 116,373.21 $16,946.11
PAYMENT 40 $17,539,39 593.11 $16,946.11 WOO
$680,305.30 i293,412.13 1386,893.00
Department of Natural Resources .and Conservation
Wafer Development and CSTB Loan Programs
Support€ n[g Documents Check€ ist and
Cepar-hr,:ent Approval Requirements
,Muncl pal Sponsors
The following list describers the documents which will support the design and
contracting procedures for construction projects financed with D;JRC loans as
well as support the financing and repayment capabilities of the sponsor. Tire
documents are grouped In seven sectlons: CONSTRUCTION, INSURANCE,
PERM ITS/EASEMENTS, RATES, PRO FESS I CNAL SERVICES AND FUNDING DOCUMFJNTAT I LAN,
OUTSTANDING AND ADDITIONAL BONDS, and CLOSING CERTIFICATES. The
SubmittaI/Approval Schedule column states If Department approval Is required
for a document and when the documents should be submitted to the Cepartmen•t•,
The schedule Is to assure sufficient time for review and approval of the
construction documents and financial information. Submittal Hires for other
documents are coordinated with these submittals. The submittaf times should
be scheduIed backward from the anticipated Closing Day, Determine a Closing
Gay when the construction. contracts ere expected to be signed. Funds will be
disbursed on Closing Day. (The Closing Day date and schedul Ing times can to
adjusted from time to time as circumstances require. )
Although the check€ ist Is Intended as a schedul ing help for Project Sponsors,.
submitting a campy to the Department with ant€clpated submittal dates will also
— ..—hei p--us ,better-coordinate our efforts.
COCU MEN T S1JBMITTAI./APFROVAL SCHEDULE
A. CONSTRUCT ICN
1 . Engineering Agresnzent Summit prIor to beginning fInai des€ on
and description of the If possible
s�i ect Ion process DEPARTIVENT REVIEW REQUIRED
2. Design Report Before final design Is started if
possible
GERARTNENT APFROYAL. REQUIRED
3. Plans and spec) f ications Submit three months before closing or
when plans are submi•tted to the
Department of Health and Env irormental
Sciences (DHSS)
4. Finai bid package with DHES Submit two months before closing.
approved plans and DEPARTIENT APFROVAL REQUIPEO BEFORE
specifications, CHES approval ADVERTISING FOR BIDS
letter, and a ng I veer i s cost
estimate
5 . Bid documentation: Submit approxfmately one month before
a. Affidavit of publ i catfon closing depending on advertisement
b. PI anhol ders L Ist schedu I e.
c. Bid Tabulation DEPARTMENT APPROVAL REQUIRED BEFORE
BID 1S MARDED
6. Award documentation :
a. Old Award letter from
project sponsor
b. Construct f on contract Submit within one week of closing
with lnsurance and bonding '
certt f icatf ons
7. NotIce to Proceed letter Submit within one week of closing
B. INSURANCE
1 , Property damage and personal If a sys�`et; is In place,' submit one
Ilability coverage certlfIca- month before closing. If a new
tf ons system Is being constructed,
permanent lnsurance ooveraoe should
be s-:�cured when construction Is
complete and certiffcailon provided
to the Department at that time.
_ 2. Worker's compensation Submit one month before closing
coverage cr exemption
certifications for
engineer/ Inspector and
sponsor If sponsor is
perform Ing any of the
construction work
3. Surety brand coverage Submit one month befcre closing
certlficatlon for person
hand) Ing finances for they city
or tcw n
C. PERM ITS/EASEVENTS
1 . Water use permit, if requl red Submit w ith bf d package
2. Encroachment permits from Subml t with bid package
the Highway Department If
required
3 . Land easements If required Subm It with bid package
4. Title opinion and deed Submit with bid package
for any land purchased
for the project
D. RATES
1 . Current rate ordinance and Submit as soon as possible after
most current year-end financial decision to proceed with project
statement for system being
financed
2 . FSC order approving rate Submit with bid package
increase If required
3 . if lncrease is required, Submit with bid package
adopted rate reso€ ution DEPARTMENT AFFROYAL REQU IRED
Increasi ng rates effective no
later than anticipated Day of
Closing. Include Notice of Public
Nearing of meeting when rate
Increase Is considered, copy
of mailed notice and certiffc-atic;n
of ci ty cl erk that mai I ed notice
compI I e s with sta-.utory require-
ments (69-7-111 , MCA ) , cert€ f led
copy of minutes of publ Ic hearing,
a nd cert i f i ed Co py of
minutes of meeting at which
rates were adopted
(Sponsors are reminded that rate
increaGes must fol low statutory
procedures In 69-7-101 through
69 -7-121 , MO' . The process can
'take up to 2 months) .
E. FROFESS IONAL SERVICES AND FUNDING DOMWNTAT ION
1 . Frofesslonal service Submit for review pricy to
agreements with attorney si gnature
or other management DEP I'MENT REVIEW REQUIRED
professionals to be retained
by contract and a description
of the selection process
2. Grant contracts fry any Submit signed as soon as possible
other participants In the
project such as CEBG
3 . If sponsor Is contributing Submit as .soon as possible
cash copies of approprlate
sections of the adopted budget
or other evidence of firm
funding is required
F. OUTSTANDING AND ADD 1T I ONAL BONDS
I . Outstanding bond resol uti ons Submit as soon as possible
for bonds being repaid from
revenues of the system
2. Bond resolution for any Submit one month before closing
additional bonds required ( it Is very Important that
to complete f Inanci ng fcr additional (^.ands be discussed
the project with the Department as soon as
possf bl e?
DEPARTMENT APFROVPI.. REZUIRED
3. Sale docLffnentatfon and Submit two weeks befcre closing
purchase commitments
for additional bonds
G. CLOSING D0CUPENTS AND CERTIFICATES
Draft documents will be provided by the Depar;ment or Bond Counsel several
months befcre cIcsi,^,g. They w i I 1 require f I I I-i n I nform8t1on fr= the
Sponsor. The final vwrsions will be prepared by Bond Counsel fcr sicnoture can
the Day of Closing.
1 . Certi f icate as to Subm It f 11 led-in form two months
Organization and before closing with final bid package
Financial Condition
2. Signature, No Litigation and Subm It f I I I ed-1 n form one month
P.rbitrage CertIfIcate befcre closing
3. Affidavit as to Signatures Submit filled-In form one month
and Certificate of before closing
Authent1city
4 . Certified copies of Council Submit as generated
Minutes at which stgnlfJcant
actions were taken related
to the bond purchase such as
land purchases, engl neerf rig
contracts approved, constructlon
bids.
MAIL SUPPORTING DOCUWNTS AND A MAIL ORIGINAL CLOSING OOCUNENTS TO
COPY OF CLOSING D0CUMUITS TO: BCND COUNSEL LISTED BELOW OR ANY OTHER
BOND COUNSEL SELECTED BY THE PROJECT
SPONSOR THAT HAS BEEN APPROVED BY
DN RC
Department of Natural Resources Mae Nan El 1 ingson, Esq.
and Conservatf on Dorsey d Whitney
Water Development Bureau 310 First Interstate Plaza
1520 Ea,t Sixth Avenue 127 East Front Street
Helena, hfT 59620 M15Goul a, MT 59802
44'n.�+^r„ '
t '}"^,/ n"fry - ]" '+
nu
_ ,
:J.'�f ��tEI:MA�w.N vkNvM'
September 7 , 1989
W . O . #86 -511 -1
Nelson , Inc .
P . 0 . Box 2667
Missoula , MT 59806
ATTN , Richard Nelson
RE . Water System Improvement
Lyman Creek , Bozeman
Dear Mr , Nelson ,
We have been notified that Gundle ' s main contact person here on
the Bozeman water project , Myron Harris , will be transferred this
Friday (9 /8/89 ) , Please be advised that we are extremely dissa -
tisfied with the job performance of 'the Gundle crew assembling the
floating cover and removing their main contact person now will add
to the problems .
It appears that now that. Myron has become an experienced hand at
this type of project , they are sending him on to a bigger and
better project . Please be advised that we will look extremely
unfavorably on this decision . The project is now under penalty
and will surely not be expedited by this decision . We request
that you keep Myron on this project until accepted .
S ' er ly ,
Gerald M . ton , P . E .
GG/zdb
•? ,.�. .. {, z 1 .s 1. ,,. � :'';, 'I ',
•,j
lls e
October 13 , 1989
LYMAN CREEK RESERVOIR
Punch List
The following items need to be addressed <ind repaired prior to
final acceptance of the floating cover .
1 . Repair leaks in cover
3 . Clean up site
a1 remove rocks and debris
b ? make area movable with hand mower
3 . Repair soil erosion where pump discharge caused erasior}
4 . Insta11 loc:< s on hatches with city provided locks
5 , Supply city with case of Para ,,)T
5 . Provide City of Bozeman with 4 year bond for• repairs of all
leaks in cover for a period beginning after the one year per -
rorrnance / payment bone! period ( 10/ 13/90 thru 10/13/94 ) ; bond
amount SIO , 000 . 00
Re '`mend d By
Accepted By :
AO ,K
//
y 1e E fining FConpany
November 6 , 1989
W . O . 1 86 -511 -1
Gundle `-
19103 Gundle Road
111ouston , TX 77073
ATTN : Kelly Glowacky
RE : Lyman Creek
Dear Kelly ,
We are in receipt of your maintenance bond for the above
referenced project and have the following items requiring change :
1 . First paragraph - fifth line : Bond needs to be to the
City of Boze;nan , not Ne1 con , Inc .
2 . First paragraph --eighth line : Change to City of Bozeman
3 . Third paragraph - second line : Perm of Bond to read :
" . . . for a period of four ( 4 ) years of the expiration of
Nelcon ' s performance payment bond . ,
Delete : " acceptance of contract "
4 , Fourth paragraph third line : Term of bond to read :
" . . . for a period of four ( 4 ) years after expiration of
performance/ payment bond . . , "
Delete : " acceptance or contract "
we would appreciate your making the necessary changes and re -
submitting this document at your earliest Convenience .
erald M . Gaston , P E .
CC : Myron Harris
GG/ zdb
THE CITY OF BOZEMAN
35 NO. BOZEMAN AVE. RO. BOX 640
CARNEGIE OUILOING PHONE (406) 586-3321
BOZEMAN, MONTANA 59771-0640
-Act November 21 , 1989
Rt:kOEIVED
110 V L 7 1989
Kim Duncan Project # (a`J/l��
Gundle Lining Co .
19103 Gundle Road
Houston, TX 7707
RE : Maintenance Bond
Lyman Creek Reservoir
Floating Cover
Dear sirs :
This letter is to inform your company that the City of
Bozeman is requiring a "Maintenance Mond" for a period of
four years commencing upon the expiration of the one year
contractor' s warranty to cover any needed repairs in
workmanship and materials on the floating reservoir cover .
During the final inspection on the floating cover, our
consulting engineer, Gerald Gaston , noticed several leaks at
the interface of the hyplon and HDPE which required sealing
with a non-standard material . in light of this repair method
as well as mis-alignment of several pulley cables and
attachment points , we are requiring either satisfactory
sealing and re--adjustment of pulleys or an additional four
year maintenance bond. This item was discussed at length
by Mr . Gaston with Myron Harris (Gundle ) and his superiors
and was apparently decided by them to be the best approach.
If that decision still stands , please make the bond recipient
the City of ,Bozeman , Bozeman, Montana . Date of bonding shah.
be 10/13/90 through 20/13/94 ; bond amount $10 , 000 . See
attached correspondence .
sincerely,
Phillip J . Forbes
Director of Public Service
cc : Gerald Gaston
Gaston & Associates
HOME OF' MONTANA STATE UNIVERSITY
GATEWAY TO YEL.LOWSTONE PARK
Aa
. Gun•.:Id Lining Construction Corp,
RECEIVEDF
oDATE
wunn 9 E C 8 1989 Job No,
Attention W j
19103 Gundfu Road Phone: (713) 443•R584 Project
HOuswr),-rexas 77073 Toll 5rer" (800) 435.2008 Re .•--,,,.�}
U.S. refex: 40102(31 GUNDLE HOU
rax: (713) a75,6010
-C TRANSMIT VIA:
rJ U.S, Mail 0 Express Mail
.�. - Federal Express ❑ aus
_T_ � 7 ! CJ Henn Deliver rl U.P.S.
CI Other
GFNTLEMFN; We Zare sending you rV at•tac:hFd 0 under separate cover via _ She following:
CJShop drawings 0Prints ❑ Sampies
C Copy of letter C1 Plans U l S Nif
p - ICatian�
--
apieS ShpoT No,
-----------
ARE sF TRANSMITTE r,) AS CHECKF.,D BELOW:
For approval M Approved as noted L Resubmit_ Copies for approval
For your use CI Returned for corrections Ci Submit _—.__.Copies for distribution
As rpovested 0 Return 0 Return ____—Correoted orints
0 For review and comment 0 For bids due
D Approval as Submiztecl [I Print; returned after loan to us
REMARKS:
enclosures are not as noted kindly notify us at once.
SIGNE
CC: ........--- -,,, .— ---- D
-
D A f F. i
• - Bona #P89-955
KkINrEN NCE BOND
f2jod XLt MEN By 'l'IiESE pRESENT5, that we GUNDLE LINING CONSTRUCTION COaPORATYON
(hereinafter referred to as Contrsse.tar) , xa Principal , and SOU17HERX AKERIC.-AN
INSURANCE COKPANY R Corporation organized and a.xi3ti.n& under the 14wz
of the State of UT A (hercinafter referred to as the Surety) , as
Surety, ara held and filtmly bound unto CITY OF BOZEHAN
in the 3= of *Ten Thousand and rzo/iUU ------- ����W -- ����-- ��,� Dollars
I 10, 000.00-), lawful money ofthe United Skates of A erica, to ba paid to
CITY 'OF BOZEIIAN for which payment well and truly
to be ;r ,e, we bind ou-rnelve$ and our several, and respective s'ucGaesars and
assi.gres, ,jointly and severally firmly by these preaents.
W7-IF-F,EAS, the contractor rzatered into a ce'rtain written cont,acr for th(.
const-ruction of Lvn,an Creak Water Suvol.v Svsrem, MBozem,a.rn_,-
and
�,' CREAS, the DUME7 requires that the Contractor shai.l guarantee all material
&nd warl=anship against defe;c;.n for a pex'iad of four (4) yeas of the axpirat or.
r �e.�,COIl� Ei )CrfUL�Ytc'lS1CC'
Payment ond and if def'ecta develop during that period, they must be made good
at the expense of the Contractor,, as provided Irl the contract.
?AOW, THEUPOfi-E, the condition of this obligation ,is such that if the Cantractar
,,lull =1 e- good any deleGti.ve =ter.i„al4 oz worl4nanship for tha pez:od of four fir)
expiration of performance/ then this obligation shall beyee�zs after Payment bond � �
null esnd void; otherwise to rcau;in in full force and effect.
SIGNED, SPAYED AND r)ELjVER£D this 6th date of December $ 19 89
GUNDLE LINING CONSTItUCT1ON CORPORATION
Principal. Daniel, L. Shook-V.P. 'Fi.nance/Cl"O
SOUTRERN AAfCRIC'AIN INSURAN 0`fpANY
BV
A.rtorncy-in-Fact Victor Borchards, pTasi.den:
SOUTHERN AN=ICAN INSURANCE COMPAINY
POWER OF Ai*rc r,Fy
now ALL JMFN I3Y THP-$8 PRESENTS,that SOUTIMRN AM£RICAN INSU'12ANC1 COMPANY,s corporation duty orz=ized units the laws of Lha
Start of Utah,add havitig Its principal offer!t the City of Provo,Douttty Of Utah.SkRLt Of Uuh,does hereby make,tda%dtutc and nppoltu
VICTIOR IIURCHERDS or S7ZFHZN P,YEOMAN,Jointly and Severally
its trot and lawrUl Anirricy(t)-In•Fae{with fud power and authority to each of&lid Aaorney(s)•in•l Net,i.rt!heir separate"parity to Sign ex=ce and Acknowledge any
and all bonds and undenakings and other writingr obligatory in nature rheecof on behalf Af the Company in iu boaureas of parmitoein;the fldality of persona holding
pietas of public or private cusC gvararuering Liu:performaao tit tontradA ether Chan irs ucc policies:guaranteeing the periolmonue of iniu=w contracts wbe;'e surety
bonds are tie,=ted by states end municipalities, and fAccutuhg Of aranlCevig bonds and undertakings required or p-trmincd iri all aajom or pt=e dings or by law
A1lowtd,sera to b nd 5U1f1 HF�tN AM1�IpcA.Y SNSURANCE COMPANY(hereby as fully and to the rattle eaten;xs it rut h bWds;Erin undert,,tkings And o;btr wrtLatgs
Obl gaLory m the rW=tltrraof were signeei by to Errrudve Offiexr of SOVI'EfERN AMERiCr%,N INSURANCE COMPANY and scaled Arad aaaclicd by ate outer of
such Officers,and hereby rstiaal and cofnrlrms all that Ica said Aaorriey(s}-in•l'aq may do in pursuance li=af,
This Powa'of Aaoahcy is grahirA by and under authority of the following ptoyWonst
0) Arnardmau to By-laws adopted by the Slockholdm of SRUTHERY Aivf£RJrt,N INSURANCE COMPANY it A mx:itlg tklly called and
held nn May 5,1948,
ARTICLE IV
Section 3-G. Viewr Bordicrds or Stephan P,Yeoman,as PrctidCmt and E.xecanive Via Pm6dent,shall 1raVe oowcr and authmiry to apeoi LL,for purposes of
a-i4tjti.nlf and ixxtrig bonds and undcriak ngi and outer wri Lirig obligaLcry in the nature Lhe7taf,tt=tnscivcs as AnOmcys.ir1-FtkC1,uui may at any iw a add to ar r=Qve
Arty other Wch P-Gsrdsru.ViCe i4erL&rr4 or,ALLdmeyia•FaCt,and revoke the power Lno gig%% icy given Lo hittt.
Sct,Liori 341- Attarirays-in-Fact shall hsva powry and authority,trubj=(o the warns intl canlitaas of the Power of ALWnq issued to thaw.to exectue and
deliver on beFau of the Company and w nrtach rh:sell of the Company thereto any and till Wads,and urdcruildnex,and oLhcr writings obligrltry in the nature lhr.�tf,
and any such insanmtnt executed by Any such Attorney-in.Faa shall be a,s binding upon the Company,
(2) r-,xcerpe from thn Minolta of a Lnxdng of the Bwrd of Directors of SOCr4-H iR;f AM.fRIC:\N INSURANCE COZMPA,'7Y duly called and held
do the Stt day of yfay,1998,
RESOLVED: Vicar Borehadt, President.and Stephen R Yentu'ri. I:XWUriye Vlet Prcildmt,shall al.ch have a long as hr.holds such def;cc:ha same
Power ro appdinL Ence salves or other Vica Presidents as Auomcys,in-Foci as sci forth in Article IV, Segiory J-0.13,and of dx By-Laws of the Corn any,
This Power of Amomoy is sigtud ud Srdicd by fawbri la under and by the authority of the following Resolution edupced by the Oireriors of SOUTHERN
AMERICAN INSURANCE COMPANYY at a meeting duly caned and held on the 5th day of May,1938.
RESOLVED,T2tri,whereas Victor llarcherrir,President,Am Stephen P.Yooman,I-ccc udva Vita President,rich hAve Live power Ana aud'nrit'y,idt long a rc
holies wch ntliea,to alytlint by a power of Aa.csncy,for purposes of exocuung and=egiLog bonus and ondenskingr and oLhtr writings obligatory in the r'uure chreof.
;r',Mselves or odwx Vic,Peesidrtus as Anucneys, i,f-'aeL;
NOW Ti-lEkEF'OR",the sigirsture of Vicirr BorchttlM.P:taideni.=d Sicphm P.Yeuman,fseeudve Vice President,and rho se-a1 of:Lis Corporation may be
atAxed or prinLed on any power of taeomey,on any revppcloa of any power of andmey,or on any certific=4 relating rhemo,by f7P-liable,and any power of urarney,any
revocauun of any puwer of auarney,or cerUfrcAtt odtring Such fatalmllo uQ•titrr or f=: rajfa seal shall be vulld aL7d bindL-A upi5tt the CorpomLiav
N W1TNfSS WHEREOF,SOUTHERN Ai4f19dCrLN tNSURAnCT3 COMPANY has cxussd shear pSesmtLs to be signed try '•Prariden4 and Its Farnsurive
Vlee?rasjdc,.r.,and its eor mid dcAl to be hereto affute.f,duly aCesterl by ire Assi OMS Sa c-Litly,this 1101 dny Of May, 1488.
ATTrSI'' .SOUTki£RN AMERICA LNSURANC9 OMPJ1
1 -- err'r,P:asidetu
Stcyhn .Y tan,lLiaudva Vicr Prtairl=
CI'ATE OF Urt%di )
SS,
CQ.WTY Olr 1,7'AH )
on this 1L�;fa y of— r�� lSctoro rno sursonatly came Victor Ilnrcher su,to she imQwn,who btiaz oy me:duly xwom,did deposa and ray:Est he
t ad,tj its Lrc Ccunry of Ueeh,tilafe of L'it,; lit he s L'e P-eiiderit of SOUTHERN AMERICAN INSURANC2 12011PA.\Y,the toLporatoo desmbed in end whicb
c%t4vttd t:.o ebovc ir_sYnitn rrt(;draL he knnws the Scat or-m Ld c0ruorad=.hAL the deal of 'xcd to the said instr=ent is such Wrporatc;tali t.hAl it Wu so M.ffaed by order
of Ctc Bo;Icd of DiMCLors o(said carporaLinn and that he sign*l his mane Lhy-to by like order,
;krry hf n,Notary
My Cos rah scion espifetr
STATE OF UTAH )
:S5.
COUh`IY OF Ul'AH )
I,Lhc undersigned AssistanL Seox:nary of SOUTHERN AMERICUY INSURANCE COMPANY,a ULah torporation,do htrtby ctaify duL thin foregoing and
atSIlebW Power of Anurrroy remains in full irKce add hue not brat r,yokcd;and N thaarom that Aititlo IV,Soctimr}G aril,34f,of Lhc By,Lawi of the Company,uhd
Lha Reeolutions of the award of Djrtctort,ttL forth in the Power of AIdth Y,of p w rn for>—
Signet!and stated at the City of Provo,Dated the�r�� day-1
far C Pouis.:L.Assistant Secrcqry
x. r iJ
December 1:1, 1989
86-511-1
Phill Forbes
Direcror. of Public Wor% s
P . 0. sox 640
Bozeman, MT 59715
RZ : Lyman C1:ee}c .'Reservoir
Sozeivara , 'Montana
Dear Phill ,
Enclosed Tease find the original copy of the "Mainte�°iarace Bond"
on the above referenced project for your fi;l.es .
If you have any questions on this item, chive me a call .
S�ce�`/r-ea 1 y, )
�I1CIC�SL71'E9:i
G,3"
? ??; h
�,,
February 12 , 1990
W.O. #86-5.11-1
Craig B.rawner
city of Bozeman
P . 0 . Box 640
Bozeman, MT 59715
RE : Bozeman Wester System
Improvements , Lyman
Creek
Dear Craig,
Enclosed please find two copies each of equipment manual volumes I
& 2 on the above referenced project for your use .
Also, please note that we have operated a.l.l the equipment , pump
and associated appurtenances and find all, itcriis operate as origi-
nally designed. The only item needing calabration now is the
flow meter . I have asked Bill, Haldane to construct a weir for the
new diversion structure . This unit will be used, to measure
available water from the spring. With this data, we can either
determine the amount flowing through the meter by measuring the
difference or simply by using the entire amount available .
As I mentioned to you earlier , we will need the resources of the
city in the form of field personnel who can make the trip to the
new div~ rsion during this period of calibrating the meter .
'5 i.ncerel,. , )
Gerald M. jaon , P .E .
Enclosures
GG/xdb
7 yr
i S fit. I hi ii L!' .4.3 i,l • �y .. !'r iV
. 1 . '!:4 .."III Y, :a ::Y 1t �,;i, ! V 'i .y'•y` r.!iG: °ti.;. i; 'I r• ,r r
?r'11
u Gaston Engmet'n2 cv, uniey"_ g
r
February 13 , 1990
W.G . 86--511 -1
Bill Haldane
Treatment Equipment Enterprises
2631 West Main
Bozeman , MT 59715
RE : Lvman Creek
Tear Bill,
As you know, we tried to fine tune the equi.pinent at Lyman Creek
last week with Jerry Fastmark . It became very obvious that the
flow meter is in error and needs to be calibrated to match the
flows actually found in the line .
After giving this subject much thought and after having some
discussion with Craig Brawner at the city, let me give you my
sugge yti.on as to what will be required . It appears that there is
approximately 350 to 400 gpm originating at the spring requiring a
weir approximately 3 to 12 inches in width . This width will dive
us a good reading ( 3" to 5 " ) in depth over the wear . Once we have
measured the actual flow at the diversion structure , we can
ca.l.ibrate the flow meter . l have talked to the city and they have
agreed to give us some personnel to help measure the flows up at
the diversion structure .
I feel you should get the weir made for insert :.into the overflow
structure and then let me know so I can coordinate with the city.
Also, be advised that the Turbidity meter and the two chlorine
residual monitors will need to be adjusted to match actual con-
ditions . You Will need to make provisions for this item also.
Give me a call on your schedule .
Pald M. Gas- P .E .
GG/zdb
C g E n a i rs & La 1 S u i,, v e y ,-
P f). I3:-, 6?d '910 \' `I4 1w., !IU���1 i(Ifl. MT "17l5 ill i£'7
`5h,li<,wX
.l'ih Ci H(A% i'.'ri 1L' ( •i f ( 1
TREATMENT EQUPMENT & FABRICATION, INC.
P.O. Box 266 P.O. Box 1349
Bozeman, Montana 59715 Anaconda,Montana 59711
(406)$87-0068 (406)$53-6076
RECIVE-D
MAY 11990
Apr i,1. :3 (), 1990 Projea
Mr . Gerry Gaston
Gaston Engineering ,ing , In.c .
2010 north !th Avenue
Bozeman , MT 5 97 1. 5a
Dear Gerry :
Please accept my a[jolagy for the lack of C«CnTnuniCa# j,pTl
in the start -up of the Lyman Creek Project,,. .
The status of the situation as I sec it, is as fo],.l,ows .
1 . T.hQ chlorine: residual anal,yZerS need final calibration .
2 . The ch,l,ori,rTe g6tS eontr, ol valve nec,,ds to be rec:al.i-
brated for the flow rangk9 of 0-1.,3E3 Cj',jvt ( 0-2 MGD) .
3 . The fluoride metering pump cal.ibriition need, to be
checked out; for the range of 0-1.3f q GPM .
4 . The chlorine leek detector neekis to be tested .
S . The: itluoride fooder ne�,dn to be charged an.d Started up.
A new valve needs to be installed in the make up line .
Jerry Eastmark will be in town to do these calibrations can
Wednesday May 2 , 1990 . I anticipate we will be featly to do
the: 24 hr . test on Thursday, if that is convenient for, you .
Again , I apo.l.ogize for the: i.nconvenienrc, I caused .
Respectf1I.A.:l.y,
TREA'l'MEN'T' Eq1 JIPM,E NT &
FABRIC'.ATTON , INC .
Wi l l i,aTn Ila ldan e
WJJ-I/ch
x
E Gristn En inee 'ng & Surveying
May 2, 1990
W.O . # 86-511-1
Phill Forbes
Director of Public Works
City of Bozeman
P . 0 . Box 620
Bozeman, MT 59715
RE : Water System improvements
Lyman Creek
Dear Phi.l,.1 ,
T have been _informed by the suppliers of equipment for the above
referenced project that all equipment is now functional at the
reservoir site . With the exception of a working alarm light at
the Police Station , everything is complete .
J have informed Nelcon and the suppliers that as soon as
everything (alarm light included) is operational,, , we will be
ready for a 24 hour operational test .
Hopefully we will be ready sometime the end of this week . Could
you please check with your operators to insure everything operates
satisfactorily.
If you have any questions , feel, free to give me a call .
�Sinc' rely,
Gerald M. G on , P .E .
GG/zdb
C (7 ll ti 11 t 3 ,' e l' s [S'L �,.
it [l 11 S ll 1- V 4 V O F. ti
_ n �u it �a I n
01 'Uw_ El r,c,n;nti. \I f :071 hl!)h Vt7 tiX,� yin )r' }3rn f:4E li';'. 1'5 `,V', Gu:ail khiue, \IT i+ L}I dhfy ' :11,i ,
Gaston ', � a c ui� y g
f
May 10, 1990
W.U . # 86-511-1
Dick Nelson
Nelcon , Inc .
P . 0. Box 2667
Missoula , Kr 59806
RE : Reservoir Cover
Lyman Creek Reservoir
Dear Mr . Nelson ,
Please be advised by this ;letter of the concern we have about the
woi')Cmanship arid material: used to assemble the floating cover on
the above referenced project ,
AlthoLxgh therp was work performed to eliminate the leaks on the
cover between the HOPE and hyplon material , we are Estill
experiencing ,leaks . These need to be corrected .
Some metal fittings and mater'i,als used on the project were not
non-ferrous . Any materials that have rust will need to be
replaced .
We still need Operation & Maintenance Manuals for the cover
showing the care and maintenance needed for the materials used .
1t is imperative that, we complete this project by the first of
June 1990 , Please perform the wcrk necessary to complete these
items . Thank you.
Si e
erald M. G on, P .E .
GG/zdb
CY 0 it S It I i i 11 L' E n c e r -s L a 17 d S u i' i
y ' S
.i 5'y!5 i rlr,iY k1, \ I C'. i
t
Gatos. E���� ��x�� �u � m
y
r
a�
May 10 , 1990
W.O . # 86-511-1
Dick Nelson
Nelcon, Inc,: .
P . O. Box 2667
Missoula MT 59806
RE : Lyman Creek Water System
Improvements
Dear Mr . Nelson ,
We are still trying to get the performance tcut on the above noted
project completed so we can turn the system over to the City of
Bozeman .
Besa,des some minor items still. remaining on the punch .List , there
are two major items which will need correction before we can
proceed �.ny further .
The flow control valve which controls Clow into the
pipeline above the reservoir ;'reeds to be able to drive
shut in case of a power failure . During our run through
this valve did not function as Specified .
The pump control valves at the booster station are
designed to open after the pumps are running and to
close before the pump shut off . During our run through
these valves did not function as designed .
Other items on the punch list are :
A. Floating cover on reservoir
--some leaks still exist at connection points between
HDPE and hyplon
--some metal fittings are rusting ; specs call for all
non-ferrous metals . These need to be replaced .
---need information about care and maintenance of
materials
C; 0 11 S u 1 1 rt 4 C I- s U Il d S u J_ ,,, C l 0 c- s 1q
n 0 5o, w 1. Imu \ 7111 1. 1;,rLChl,I R. �.il `rii �filfil ?�ti R,lis.�;S F6vr tL.m (.C{RC C. __ V1', I,ir.:0 rl�, lii,❑�C. \i E }'r-1 ii .:11;'U ..Erb;
Dick; Nelson
May 10, 1,990
Fagg 2
B . Chlorine house
--window cracked in roll up door
- 2 X 4 near roll up door need trimming
C . Valve vaults -
--insulation on icoot is nose and needs repair
D . Diversion dam is .leaking and nE,ed s repair .
r would appreciate your earliest response to these items .
?nc:er Fee Iy,
G rald M. GIq//nt P .E .
GG f zdb
uaston En��ineclrmcr Surveying
July 3, 1990
W.O. # 86-511-1
Craig Brawner
Director of Public Works
City of Bozeman
P . 0 . Box 620
Bozeman, MT 59715
RE : Lyman Creek
Final Inspection Items
Dear Craig,
Nelcon 'has scheduled a Meeting to handle the neres�ary punch
list items on the above referenced project for July 10 , 1990
at 10 :00 am.
I would appreciate it if you could notify your people and
have the reservoir in suitable configuration for a booster
station start-up.
Please notify me it the scheduled tiine is not acceptable .
If you have any questions , feel free to give me a call .
Sincerely,
4
Gerald M. Gaston , P.E.
CC : Bill Haldane
Glenn Stensrud (Nelcon )
GG/Zdb
Tit-, Engi A L r ti Lk, Lai-id Su rvicyo rs
0 llm. .461, 21110 N. --;h \1T ;1Y1,i *,V
NO, A 8
0�4ndie Link)g Systems Inc
03 u nn (i Ll de
7 FLI' L'FC:'- IF, 'f�A\'),V�'K I N AQ H N�j i 11:1 11 1 K)I
1410"1 Slonwe 1141 f home!(I I�)443-e$f4
Houaton,Texas 77073 iod Free:(800)435-2008
U,S.A- Tofox:4620201 GUNOL5 HC)U
Fax_(7 13)675-6010
DATE: �� •l �` ,1����� C
TO; ,
ax NO:
RECEVE
J U L 11 1990
FROM: Gundle Lining System I Inc, Project
FAX NO; (7.10) 875-601 Q
CONTACT;
SUBJECT:
Total pages including cover page
_.
nn..rr,ti nanco cone vav oaiarci, Ri r�vgn.rv•SPunar.tr Horn r-rW� r it> a1F-a4r,r1
Ao Lining Construction � p
u nn d Ll 06
1$103 Gundlo Ad- Phone:(713)443.8664
Hvwkon,Taxaa 77079 ToO Free;(HOL)4,36.2004
UZ.A, ToJOX:4e20221 GUNDLE HOIJ
Fax: 17133675.6010
July 11, 1990
VIA Facsimile
(406) 728-7306
Dick Nelson
NELCON, INC,
RO. Box 2667
Missoula, MT 59806
RE: Gundle No. 8007
Lyman Creek Resorvoir; Bozernarl, IVIT
Dcar Mr. Nelson:
I have. attempted on several occasions to contact you without any response. Therefore, let
this letter serve as notification that if I do not hear from you by 5:00 pfn Central time on
this date I will assume that all work hai been coniptetcd to your' s,)tisfactlon and will have
niy crew demobilize:. At that .stage any additional work will hIave to be re-scheduled at cur
discretion.
We have been very patient to this point, but as you know there wais a final walk through
schtdUled For ,7uly 10, 1990 at 10:00 am, which was only <attcridt:d by our supervisor. No
one called to cancel, explain, or re-schedule, These unnecessary delays are becoming quite
costly so I hope that you can Delp us resolve this matter quickly.
Sincerely,
SPECIALTY A PPLICA'1'19 S DIVISION
r
1
Ed Zimrnel
Project Manager
c;: Gerald M. Gaston, P.E.
Gaston Engineering c Surveying
July 11, 1990
M RECEIVED
„a J U i, 16 1990
PFA v y NlGFI SVA Y
Gundl.e Lining Company Proiect
CQH7'RAC-tQR5 19103 Gundle Road
Houston, ` X 77073
',0, Pox 2667
%iissoula, MT 59206 Attention: Mr. Ed Z:imxel.
Re: Lyman Creek Water systems
Floating Reservoir cover
Gear Ed:
After a final inspection with our supf�:rintendent
Glen Stensrud, Engineer Jerry Gaston and the City Engi.neez
Craig Brawner it is requested that the following list be
taken care of as soon as possible tar the above referenced
Project.
1 . NE and NW corner sums need to be cleaned
and re--welded with leaks stopped.
2 . Leaks repaired between Posts 56B and 57 and also
between Posts 4 and S .
3 . Also, it has been requested that an Operation and
Maintenance Manual, be provided by your company.
Please send this manual to the City Engineer,
Craig Browner.
Glen St6nsrud has been in contact with your local.
repre8entative and made him aware of these corrections .
Your immediate attention will be greatly appreciated.
Thank you.
Sincerely yours,
NELC"_ON, Inc.
Richard L. Nelson
President
RLN/s s
cc, Gaston Engineering
406r721-1733
FAX 406(728.7306
July 12 , 1990 RECEIVED
?jw&S-L-
'JUL 1. 6 1990
Project
HEAVY-14IGHWAV
Cori 7ACTORs
P.O. Gox 2667
Missoula, MT 59806 Gaston Engineering
PO Box 861
Bozeman, MT 59715
Attention; Jerry Gaston
Re: Lyman Creek Water Improvements
Bozeman, Montana
Dear Jerry:
This letter certifies that NELCON, Inc. has coluplied With
the state wage rues for the above refs-irenced project.
If you need further information, please contact this
office, Thank you,
Sincerely yours,
NELC:ON, Inc.
Richard L. Nelson
President
RLN/s s
R 0W2'!-1733
FAX 408R28-7306
r
7 Gaston Eng eerm Surveying
July 16 , 1990
W.O. # 86- 511 -1
# 86-511-3
Mr . Mark Smith
DHSS
Cogswell Building , Room A206
1400 North Broadway
Helena , MT 59620
RE : Layman Creek Water
System Improvements
Dear Mark ,
Enclosed are drawings for the original project (Phase 1 & 2) as
rn-fer'enced above . These drawings are as-builts .
Also enclosed are the new drawings for the last phase of this pro-
ject (Phase 3 ) . 1 am not ;pure what happened to the rather drawings
we mailed earlier .
If you have any questions , fee,, free to give me a call-
Sincere�,y,
erald M. Gas on , P .F .
Enclosures
GG/zdb
C 0 11 S li 1 t .1 n car E Ti 17 .1 n c e i- S k
-u ?��-5s):S
FA) Boc S6E, .'NO N. 7th :Ve., A'»ariran, ,MT 511715 .-',6t'I SSt;-fh�ii 50%cr Sire l:anier. 125 W. (:,rururc. }iiru �I'1' `1i'ISI i c7r
fn:: r!•...r��:Yr_innrrrr_. f6vrman
1 .
Gaston n� ee. ink ~ g-Y
August 3 , 1990
W.O . # 86-511-1
Phill Forbes
Director of Public! Work:
City of Bozeman
P . 0. Box 640
Bozeman , MT 597..15
RE : Lyman Creek Improvements
Bozeman , MT
]Deal' Pbill ,
'lease be advised by this letter that the improvements to the Lyman
Creep ;'rater supply and rewsezvo.ir storage have been constructed in
accordance with approved plans and Specifications .
'rhis work as designed and consLructcd i, commonly referred to as
Phase I & II .
Phase TIT has been designed and has been submitted for review.
Phase III will complete the pipe line and enclose the spring
source .
If you 'have any questions , feel free to give me a call .
c core ,
Gerald M. Gaon , F . .
GG/zdb
� n
(. Q n `ti a t i n e it a i it ' C F SrL ,; , ,
1:1,C]. lilt' C"'w'7F. I,'5 ll li!',11111:. ,dli:
Gaston Engineen'ng & Surveying
August 20 , 1990
W.O. # 86-51.1-1
Nel,t^on Construction
P , to . Fox 2667
Missoula , ITT 59715
RE : Lyman Creek
Dear Mr , Nelson ,
Please be advised, by this ,Letter that the following items are
still needing correction or your attention .
1 . Influent chlorine recorder - inoperative
2 . Effluent chlorine recorder T starting to become erratic
3 . Flouride pump - still leaking aria making noise,
4 . Window in chlorine building is cracked and needs replacing
5 . 11eater in' chlorine buidling -- still not corrected
6 . Need O & M ,information on reservoir cover
We would appreciate your prompt response to items . I Will
not submit the final estimate until We have had these items
corrected .
If you have any questions , feel free to give me a call, .
fS`"Thcere.l,.y,
-erald M. Gasto ' , P .E ,
CC : Craig Brawner
GG/zdb
C () i1 5 lI l t l cT l I1 C' r S & i1 11 d S ll I' V u 1' 0 r S.
P.O BM iol, '_I);) ti "'i 1w- ?i, rF'dn, NI 1)715
"'
w
3 �
C, i -
r.'
September 13 , 1990
W.O. # 86-511--1
Nelcon Construction
P . 0 . .Box 2667
Missoula , MT 59715
ATTN : hick Nelson
RZ : Lyman Creek Water System
Improvements , Bozeman , MT
Dear Mr . Nelson ,
I have conducted another field test- inspection on the above noted
project and find the following items still needing correction and
yo�4r attention .
1 . Influent chlorine .residual graph inoperative
2 . affluent chlorine residual graph - starting to become erratic;;
3 . Flouride pump - still leaks oil
a . Flouride mixer Motor starting to vibrate
5 . Inlet flow graph W- drops off line periodically
6 . Boster station electrical relays need to be firmly attached
to clectr:ical panel .
This project punch list seems to keep growing without much atten-
tion to repaira . l would like to get these i.tezns completed before
the city devei,ops a bad attitude about the project and derides to
do something on their own .
If you have any questions , feel free to gi call . 1
Sincerely /
y�
' -C-�
Gerald M. Ca. :on , P .F.
GG/7db
f" 2, 7- 11 1:
Gaston .Engineering & Surveying
1,
October 9, 1990
W.C . # 86-511-1
Nelcon Construction
P . 0 . Box 2667
Missoula , i T 59715
ATTN : Dick Nelson
RE : Lyman Creek Water System
Improvements , Bozeman , MT
Dear Dick ,
It is necessary for an eleventh Month inspection to be held to
review the above noted project .
I have scheduled this inspection meeting for October 17 , 1990 at
10 :00 am on the: s i t w »
We would appreciate your attendance at this meeting . If you have
a contlict , please gave me a second dale .
;el-rald
' ,
11
M. Easton , P .E .
CC : �:�c"11C� g�ciWTX�'Z 1
Gc/zdb
C 0 n s u I i n a rt _� i �� � C F 5 ;:l zl d S U r v e v Jill�,
E',S). Il ,i(i!, .- 'rill ;1 .,.C,. {i /:.!c:1, �i l' •` '; li 1l,i ;<h.II.
*iw 5;htir R �, �'rnlrr. I'_; 1V c;lr;ut�ir. Nurse. NI'I' }N '_S-;,;li;
Gaston .r�gine nng veying
October 12 , 1990
W.O . # 86-511--1
Ne,lcon Construction
P . 0 . Box 2667
Missoula , MT 59715
ATTN : Dick Nelson
RE ; Lyman Creek Water System
Improvements , Bozeman, IMT
Dear nick,
We have been notified by city personnel that two cable support
anchor flaps are coming loose and could damage the floating
Cover .
Will, you please take the necessary action to have this repaired .
Gerald M. Gastcri, 7 .E _
CC : Craig Brawner
GG/zdb
P(), Ro-' W. :oll) 'N ittt r\\'t., BU2Crrlan, NIT 5T15 f400) 5S6,(K8S Siker Bow Cmter, I_'i W. (.arun:rc. Bunn, NIT iQ-Ml i-:Or,) 723-540.1
Gatos. En ee n ng Surveying
October 17 , 1990
W.O. 4 86-511-1
Nelcon Construction
P . o . Box 2667
Missoula , MT 59715
ATTU: Dick Nelson
RE : Lyman Creek Water System
Improvements , Bozeman , MT
Eleventh Month Inspection
Dear Click ,
The eleventh month inspection on the above referenced project was
held can October 17 , 1990 and the following items were noted with
regard to the floating cover on the Lyman Creek Reservoir .
1 , Many of the tension cable assemblies have loose bolts
which have come loose and require re-installation with
washers .
2 . Attachment points for the tension cables on the north--
west corner have pulled ,Loose or are tearing and need
repair . This is the corner that the installers had a
lot of problems with and it looks lake an improper glue
installation .
3 . We still have many areas where ferrous metal chains have
been used . These need to be replaced .
Dick , many of the areas that are tearing, coming loose , or have
rusting metals are areas originally noted . It appears that the
workman have just done a sloppy repair job without consideration
for long term operation .
The future repairs need to be accomplished by competent personnel.
C sultin (Y En Lind SiirvcN, ors
P S) firs m'l. ,_nl11 y111 V" I),i/i V11a V1. NIT?11711 {-'Ohl S n-o58"{ -I'dwi' li,a ('qll:i. I_'` 11 „l'C. l�IliiC. \Il 511-111 11!7S',, i.IQ.1
t
Gaston Engineenng & Surveying
.October 17 , 1990
W.O . # 86-511-1
Nelcon Construction
P . 0. Box 2667
Missoula, MT 59715
ATTN: Dick Nelson
RE : Lyman Creek water System
Improvements , Bozeman , MT
Eleventh Month Inspection
Dear Dick ,
During our eleventh month inspection , we found the following items
still requiring your attention .
1 . Repairs to the floating cover . See letter dated
10-17-90 .
2 . Mixer Motor and. assembly for flouride unit need to be
installed .
3 . Chlorine detector inoperative and needs repair .
4 . Relays in booster station need to be mounted in an
approved electrical box .
Please let me know when these items have been corrected .
Since ,
Ge 1d M. Gaston .E .
CC; Craig Brawner
GG/zdb
C 0 n s u ! t 1 n (Y E n ��' i r� e r s c& L a n d � U C V e V () r 5.
61. 10 N. -�h H0; T7Wn. � , 1" W [1r:p11i" PwiL'. VT 5-l-Ul 'AiJ
-111I'. 7. 3 n0 ''
Nelcon Construction
October 17 , 1990
Page 2
We are also in need of an 0 & M information on the floating rover .
The big question is how clueing can be done the field? What
kind of glue? What kind of temperatures? What kind of materials?
We also need some maintenance information .
Tease forward this information to us as soon as possible and let
us know of the schedule for repairs .
Si eely,
erald M. Gaston , P .E .
CC : Craig Srawner